Docket / License: 50-309/DPR-36
'
Maine Yankee Atomic Power Company
ATTN:
Mr. J. B. Randazza
Vice President
Nuclear Operations
83 Edison Drive
Augusta, Maine 04336
Gentlemen:
Subject:
Region I Inspection 50-309/85-19
This transmits the August 8-16, 1985 special inspection findings of Messrs.
C. Holden and K. Ferlic at the Maine Yankee Atomic Power Plant, Wiscasset, Maine.
The inspection was conducted to determine the circumstances surrounding the dis-
covery of mispositioned root valves for the steam generator pressure transmitters.
Those findings were based on observations of activities, interviews, and document
'
reviews, and have been discussed with Mr. Garrity of your staff.
i
Apparent violations of NRC requirements are cited in the enclosed inspection re-
port. We are considering these violations for appropriate enforcement action which
will be addressed under separate correspondence at a later date.
,
Our investigation into this event indicates a failure to administratively control
the position of the Steam Generator Pressure instrument root valves.
Generalized-
statements in the Hydrostatic Test procedure did not ensure that all root valves
4
that were positioned for the test were returned to their required position.
As
a result, the plant operated since the end of the last outage date, June 20, 1984,
with these root valves mispositioned.
,
We consider this event to be serious and have scheduled an Enforcement Conference
i
for September 9, 1985 to discuss this issue.
At the conference, you should be
]
prepared to discuss:
Your methods for administrative control over safety related valves.
--
.
The methods you intend to use to verify operability of safety related systems
--
'
and instrumentation.
What actions have been taken to ensure this or other safety systems have not
--
been inadvertently made inoperable.
Other protective functions available to provide backup protection for the in-
--
operable pressure trips and degree of protection provided.
,
8509060097 850828
ADOCK 05000309
G
%
s
.
e.
,,
.
gg 2 B M6
Maine Yankee Atomic Power Company
2
Your cooperation with us is appreciated.
Sincerely,
g33 tan sisnod W
,
Richard W. Starostecki, Director
Division of Reactor Projects
Enclosure:
NRC Region I Report 50-309/85-19
cc w/ encl:
.
C. E. Monty, President
C. D. Frizzle, Assistant Vice President / Manager of Operations
J. H. Garrity, Plant Manager
.P. L. Anderson, Project Manager
~"
G. D. Whittier, Licensing Section Head
J. A. Ritsher, Attorney (Ropes and Gray)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety'Information Center (NSIC)
NRC Resident Inspector
4
State of Maine
bec w/ encl:
Region I Docket Room (with concurrences)
Se .ier Operations Officer (w/c encls)_
DPRP Section Chief
S. Ebneter, RI-
K. Heitner, LPM, NRR
~
.
RI:DRP
RI:DRP
RI:DRP
R
R
P
Rffc
I
~
Y
i
St
'o s .ecki
Holden /meo
F rlic
ETpasser
W
Q[Lngpr
gy
8/21/85
ClW
HMP
htt')
0FFICIAL RECORD COPY
l
.
j