August 23, 1985 MEMORANDUM FOR:
Harold R. Denton, Director Office of Nuclear Reactor Regulation FROM:
Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation
SUBJECT:
"SH0LLY" STATISTICS Enclosed is the update of the Sholly statistics covering the period May 6,1983 through July 31, 1985. The format has been changed to include latest month, current quarter and fiscal year totals as well as cumulative totals from May 6, 1983.
One request for hearing was received on June 29, 1985 on an application limit of the fuel for amendment to the Pilgrim license to raise the K f storage pool from 0.90 to 0.95 for normal conditionI.f The application was noticed on May 21, 1985. The ASLB issued a Memorandum and Order on July 19, 1985, dismissing the request (untimely filing with no good cause shown for late filing; no valid ground for intervention stated by petitioner). The petitioner filed an exception to the dismissal on July 27, 1985. On July 31, 1985, the ASLAP issued an Order extending the date for appeal to August 14, 1985.
Future reports will be updated on a monthly basis, covering a calendar month instead of bi-weekly periods, thus ensuring greater accuracy of the figures after the end of the month (hopefully no more than 5 working days)possible and easier recordkeeping. The reports will be updated as soon as Original Signerf bp Hugh L Thompson, Jr, Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation
Enclosure:
DISTRIBUTION:
As stated 1RTETTKF NRC PDR cc w/ enclosure:
L PDR NRR Division Directors ORBf3 Rdg NRR Deputy Directors PMKreutzer DL Assistant Directors EButcher DL Branch Chiefs GClainas DL Licensing OELD Lars Solander, PRAB CONTACT:
Pat Kreutzer X29516
.,e
u i
k p > y D:DLo[
ORB #3:DL 0
L AD R:DL
/
j, P$rgiftzer;dd E
her GCd81nas HLThonpMn y/3-/85 6 /.<1/85
/g/85
[/g/85
~
S I
- g9060047 8 aoOcx 9
t>
i "Sil0LLY" STATISTICS May 6, 1983 through Bi-weekly FRN Individual FRN Individual FRN July 31, 1985 Proposed NSHC Proposed NSHC SHC Totals 4_tL FY 85 Total 4th_
FY 85 Total 4 tit FY 85 Total 4th__
FY 85 Total PERIOD COVERED July Qtr.
to to July Qtr.
to to July Qtr.
to to July Qtr.
to to 1985 FY 85 date date 1985 FY 85 date date 1985 FY 85 date date 1985 FY 84 fate date Comnent period:
30 days 93 93 795 1967 3
3 45 247 4
4 8
34 100 100 848 2248
\\
LGss than 30 days:
7 Short FRN 0
0 9
22
\\
0 0
9 22 Press release f
\\
]>
/
\\
1 1
5 9
Public cossnents (12FRN received 2PR) 0 0
O 1
0 0
3 11 0
0 0
0 0
0 0
14 j
(15FRN Requests for pgj-1PR).
1 1
4 0
0 0
9 0
0 2
3 1
1 3
16 2f hearing grim Amendments issued - Total 75 75 734 1510 (1) With 30 days notice ------------------ -------------------------------_----------------
70 70 698 1428 (2) Less than 30 days or NO NOTICE --------------------------------------------------------
5 5
35 71 (3) Hearing requested but final flSHC determination made (50.91(a)(4) ----------------------
0 0
0 10 (4) Proposed NSHC; hearing requested. Hearing completed and amendment issued.
N0 final NSHC determination made because hearing was completed before a me n dme n t wa s n ee de d - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - -- - - - -
0 0
1 1
Backlog:
(applications received which have not been noticed, either in bi-weekly FRN or individually through July 31, 1985
):
259 (Includes items which have been prepared and approved for publication in the next bi-weekly, items which are in concurrence, and items for which additional infonnation is needed from licensee.
FOOTNOTES: See page 2 if an item included above is footnoted.
Footnotes will be provided only when infonnation is new or changed.
_ =--_ _ _._ _
FOOTNOTES FOR "SHOLLY" STATISTICS 1f Coments 2 comments, one from State, one from a member of the public.
Grand Gulf l
TMI-1 7 coments received as result of initial noticing action, I additional comment received as a result of Notice of Additional Opportunity published on August 25, 1983.
Susquehanna I coment received from a member of the public.
Dyster Creek I coment received from State.
j WNP-2 I coment received from a member of the public.
1 LaSalle 2 1 coment received frem local government.
2_/ Requests for hearing j
TMI Steam generator repair - 2 requests for hearing received. Prehearing conference held. By a Memorandum and Order dated June 1,1984, Board l%
dismissed 9 of 11 contentions. Hearing concluded July 18, 1984.
l Staff's proposed findings submitted August 20, 1984. Board issued i
Decision on October 31, 1984.
l l
Salem Integrated leak rate - 1 request for hearing received from State of i
Delaware. On January 20, 1984, State filed a motion to withdraw which was granted by Board on January 25, 1984.
j-Turkey Pt. 3/4 - (a) Proposed operational limits for current and future reloads - 2 requests for hearing (2 units). Prehearing conference held l
- February 28, 1984 A second preliminary) conference was held on Discovery in process.
(b Spent Fuel Storage
/
March 26,1985.
j Expansion - 2 requests for hearing (2 units).
(c)Enrichedfuelstorage l7
- 2 requests for hearing (2 units). Nuclear Responsibility Inc. and 1.-
Joette Lorian petitioners in all three issues.
I Pilgrim - Single loop operation - 1 request for hearing. Proceeding dismissed January 26, 1984 based on settlement.
Grand Gulf - Amendment No.10 redefined HPCS operation and resulted in a calculated increase in peak clad temperature. One hearing request received. Prehearing conference held February 29, 1984. ASLB issued decision on April 23, 1984 admitting two contentions for discovery. On September 24, 1984, ASLB issued Memorandum and Order Terminating Proceeding.
Trojan - Spent fuel pool expansion - 2 requests for hearing,1 from State and 1 from Coalition for Safe Power. Both admitted as parties to proceeding.
Prehearing conference held, two contentions accepted. Coalition withdrew from proceeding. Hearing held October 10, 1984.
Initial Decision issued by Board on November 28, 1984.
Zion 1/2 - Containment leak testing - 2 requests for hearing (2 units) from Citizens Against Nuclear Power. Licensee subsequently withdrew application.
l l
e
,y
,.,m.
-w -
-,,--~w--.,----y o._m,.
,..,.m.,m---.,
e
, ~... - - -,.,
t
^ ?
Pilgrim - raise the K
' limit of the fuel storage pool from 0.90 to 0.95 for norwal Ebbditions - 1 request for hearing from John F. Doherty on June 29, 1985. ASLB issued Memorandum and Order on July 19, 1985 dismissing request (untimely filing with no good cause shown for i
late filing; no valid ground for intervention stated). Mr. Doherty filed an exception to the dismissal on July 27, 1985. ASLAP Order dated July 31, 1985 extended date for appeal to August 14, 1985.
3/
Amendments Issued, Item (3)
TMI-1 hot testing, I amendment Salem 1 integrated leak testing, I amendment Turkey Pt. 3/4 operational limits for current / future reloads, 2 ar.endments TMI-1 hot functional testing of SG, I amendment Trojan spent fuel pool, I amendment Turkey Pt.' 3/4 SFP storage expansion 4 amendments Grand Gulf peak clad temperature, I amendment l
4/
Amendments Issued, Item (4)
TMI-1 steam generator tube repairs and return to operation,1 amendment.
Pursuant to the initial Decision of the Atomic Safety and Licensing Board dated October 31, 1984, the Commission completed action on GPU's i
May 9,1983 application by the issuance of an amendment to the license permitting the return of th? steam generators to operation. The hearing having been completed, the matter of'a Final Determination of No Significant Hazards Consideration related to this amendment was considered moot and no such determination was required or made, t
e r
s P
i 4
n l
L
.