Mod 3,extending Contract Performance Through 851231 & Increasing Funds,To Preoperational & Startup Insp Program Procedure Development
ML20134N884
Person / Time
Issue date: 08/28/1985
From: Edgeworth P, Lefkowitz S
NRC OFFICE OF ADMINISTRATION (ADM), PENTEK, INC.
To:
Shared Package
ML20134N882 List:
References
CON-FIN-B-8721, CON-NRC-05-84-156, CON-NRC-5-84-156 NUDOCS 8509060027
Download: ML20134N884 (13)


Text

.

i. t UN i Raci io c vot mot u, . ,. u t AMENDMENT OF SOLICIT ATION/ MODIFICATION OF CONTRACT 1 3 Y AMC NOME N1 /MOO F sC AT ION NO.
3. LF F LCT eve DAT L 4. At GulSIT ION /PUHC H AS

[

s. I H UJt L t NO. (// opplu able, 6 8%NO.and Three (3) 6/24/85 OIE-84-156 dtd 6 /85 C. eS5Ut O BY -
7. AoMINIST L H L O UY sif other f%en stam 6) 1 CODE _ _ _ _ _ _

CODE L. . _ . _ _ .

U.S. Nuclear Regulatory Comission Division of Contracts Washington, DC 20555

4. N AME AND ADOR E 55 Of CON I R AC1OH (No., streef. coun ty, Ssefe end 21P Code) 9A. AMLNOMENT OF SOLICIT ATION r O.

Pentek, Inc.

1026 Fourth Avenue ,o. DaTEO rstu stru s si Coraopolis, PA 15108

'*. 2 oA. MOOtF IC A T TON OF C ON T R AC T/O R OE NO.

X NRC-05-84-156 lo8. D AT E D t$ 6.L ITEM 13)

CODE  : lF ACILITY CODE 4/25/84

11. THIS ITEM ONLY APPLIES TO AMENDMENTS.0F SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for f emipt of Offers is enter.ded, is not e tended.

Offus must acknowiedge receipt of this amendment preor to the hour and date speClf eed in the solicitation or as amended, by one of the followong methods' I5) By Completing ltems 8 and 16, and returning Copies of the amendment; (b) By acknowledgin0 receipt of this a<nendment on each copy of the Off submitted. or (c) By separate letter or telegram whid includes a reference to the solecitation and amendment numbers. F AtLURE OF YOUR ACK NOWL ED' MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEtPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESUL IN REJECTION OF YOUR OFF E R. If by virtue of this amendment you desire to change an offer already submitted such mange may be made by telegtam.

6ett2r, provedad each telegram or letter makes reference to the ,olicitaten and this amendment, and is received prior to the opening hour and date specif eed.

3 2. ACCOUN T ING ANO APPR OPRI A T ION DAT A (if twemsred)

~

B&R No. 30-19-02-06 FIN 88721 Obligated: $124,000.00

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONT RACTS/ORDE RS, IT MODIFIES THE CONTR ACT/ ORDER NO. AS DESCRIBED IN ITEM 14.

g A. THIS CHANGE OROE R 45 ISSUE D PURSUANT Tor (Specify author fyf T HE CHANGES SE Y F OR TH IN e T EM 3 a A R E M ADE IN T HE CON-T R ACT OR DE R NO. $N IT E M IOA. ,

B. THE ABOVE NUMBE REO CONTR ACT/ORDE A IS MOOlFIED TO REFLECT THE ADMINISTR ATevE CHANGES (such as changes in paying offH approprWoon dere, etc.) SE T F O R TH IN IT E M 3 4, PU RSU ANT TO THE AU THORIT Y OF F A R 4 3.IO 3(b).

C. T HIS SUPPL E MEN T AL AG R E E ME N T 15 E N T L R E O IN TO PU R5U AN T T O AUT HO H 4 T Y OF s

_X_ Mutual Agreement and Article _VIII of_the Contract

0. 0 T HL A $$pecsfy type of modsface tson end au thorsty)

E. IMPORT ANT: Contractor is not. - is requitted to sign this document and return Copies to the issuing of fiCe.

le. OLSCRIPt ION OF AMENOMEN1/MOQlF 6C ATION forsenued by UCT secs un headsngs. sneluding sol catersonicontrees eutwert metter u,here feeditde.)

SEE ATTACHED SHEETS ,

8509060027 050828 PDR CONTR NRC-05-84-156 PDR E . .ot n o,.....o n....n. .if i.,m. .no c on o. .ons or io. ooc um.ni ..t...nr .o in i,,m , A o, i o A. .. I,. .t o.o,. c n.n,... ., m. . onch.n.. .na in t o i io .

6910 et f tt t.

16A. N AME AND T e TL E OF CON T R AC T eNG OF F ICE R (Type or prenf A 15 A. H AME AND TITp E F $1GN R (Type or printf

.bHWN F /77 M r /4)s7 7 1*h LON I CTOR/OFF 40 a SC. O A t t 5'G N t O Pau l t,ft L 4 sir Edgeworth, Contracting Officer TA E ' Of M iaCA I t.C O A t t S tG N

,, - t.. f .. ..a . . t .. . . e d ,. . . .n ,

=l UY s .

.L.e. . gb Wf n

f. , O ,,.. r, J n/t cara anru.m.nunr.wrn TG. i n s GT ANDARD f OHM 30 ts v.10e

NRC-05-84-156 Modification 3 Page 2 l

A. Article I - Statement of Work, paragraph D, Description of Work, is l revised to include the additional work required by the NRC which resulted l in a cost growth in the amount of $7962.00. This amount, together witn I the reimbursable cost and fixed fee ceiling authorized by contract modification no. one (dated March 25,1985) establishes the following J s , contract ceiling for work required under the contract from its effective date through June 24, 1985:

Reimbursable Cost - $MDEBBC

. Fixed Fee TOTAL - $ @290,560.00 It is understood that the additional cost of $7962.00 represents the full obligation of the Governnent for the cost growth experienced, with no increase in the amount of fixed fee previously established by the contract.

B. Pursuant to Article VIII, Option for Increased Scope of Work the NRC hereby exercises its option for performance of additional work described in the contractor's proposal dated June 20, 1985, and the attached Statement of Work, for the total estimated cost of $124,847.00.

C. Article II - Period of Performance, is revised to read:

The performance of work described in Article I and the attached Statement of Work shall commence on April 25, 1984 and continue through December 31, 1985.

D. Article III - Consideration and Payment, paragraph A is changed to read:

A. Estimated Cost, Fixed Fee and Obligation

1. It is estimated that the total cost to the Government for full performance of this contract will be $415,407.00, of which the sum of Megamier*0 represents the estimated reimbursable costs, and of which N represents the fixed fee.
2. Total funds currently available for payment and allotted to this contract are $406,598.00, of which -fG@$G80HERI represents the estimated reimbursable costs, and of which M represents the fixed fee.
3. It is estimated that the amount currently allotted will cover performance of the optional statement of work through October 30, 1985.

I

] . .

1 1

i E. In sumary, this modification accomplishes the following: '

! 1. Authorizes funding of the contract cost growth which totals

$7962.00.

2. Exercises the contract option for additional work estimated at the total cost and fixed fee of $124,847.00.

i 1 3. Extends the contract perforinance period through a s pecember 31, 1985.

) 4. Increases the total estimated cost of the contract by $132,809.00 l from $282,598.00 to $415,407.00, and the amount of obligated funds by $124,000.00 from $282,598.00.

1 i

i l

  • i l

l

Statement of Work for Exercise of Option for Increased Scope of Ilork The contractor shall develop the inspection procedures that are applicable curing the start-up testing phase of the Reactor Inspection Program. These procedures have been drafted in basic form and the contractor shall fully develop thele inspection procedures. The effort shall be performed in accordance with the statement of work identified in the Basic Contract as modified below:

Task III:

Add the following general and specific inspection procedures as Task III.

These procedures are a,pplicable during the start up testing phase of the Reactor Inspection Program. The contractor shall develop the following inspection procedures. These procedures exist in basic form only and are required to be extensively developed. The attached Schedule B Typical Inspection Plan is attached for review.

i General 1

Inspection i Procedure Number inspection Procedure Title General 35501 QA for Startup Test Program 72300 Startup Test Procedure Review

  • 72301 Startup Test Results Evaluation
  • t 70302 Startup Test Witnessing and Observation
  • 72400 Overall Startup Test Program s

72500 Initial Fuel Loading Procedure Review 72524 Initial Fuel Loading Procedure Review 81000 ,

Security and Safeguards **

83521 Radiation Protection - Startup 84521 Radwaste - Startup 90501 Reportable Matters - Test Program 93700 Inspector Dispatched to Site - Test Pr'essurized Water Reactor (PWR) 72564 Precritical Test Procedure Review (Protective Trip Circuit, Group B, and Rod Drop Measurement, i Group A) 72566 Precritical Test Prochdure Review (RCS Leak Test, Group A and Pressurizer Effectiveness, GroupB) ,

72570 Initial Criticality Procedure Review (Group A and B) 72572 Low Power Test Procedure Review (Moderator Terr.perature Coefficient Measurement and Boron Reactivity Worth, Group B, and Rod Worth and Pseudo Rod Ejection, Group A) 72576 Power Ascension Test Procedure Review (Natural Circulation, Group A, and Power Reactivity CGGf ficient M@guremento _ Group _ B) _ _ ,

I

( f 72578 Power Ascension Test Procedure Review (Evaluation of Core Performance) (Group s ,,

A and B) 72580 Power' Ascension Test Procedure Revicw (Turbine Trip, Group B, and Generator Trip, GroupA)

~

72582 Power Ascension Test Procedure Review: Loss of Offsite Power (Group A and B) 72583 Power Ascension Test Procedure Review:

- Shutdown from Outside the Control Room (G'roupB) 72584 Power Ascension Procedure Review (Evaluation of Flux Asynmetry of Pseudo Rod Ejection Test) (Group A) 72592 Initial Criticality Witnessing 72596 Precritical Data Review 72600 Power Level Plateau Data Review (25%)

72608 Power Level Plateau Data Review (50%)

72616 Power Level Plateau Data Review (75%)

72624 Power Level Plateau Data Review (100%)

1

! _4-Boiling Water Reactor (BWR) .

72502 Initial Criticality Procedure Review (Group s ,

A and'B) 72504 Heatup Phase Procedures Review 72508 Power Ascension Procedure Review: HPCI System (Group A) 72509 Power Ascension Procedure Review: Control and Drive Systems (Group A and B) 72510 Power Ascension Procedure Review (Relief Valves, Gr6'up A, and MSIVs, Group B) 72512 Startup Test Procedure Review (RCIC and Recirculation Pump) (Group B) 72514 Startup Test Procedure Review (Turbine Trip, Group A, and Generator Trip, Group B) 72516 Startup Test Procedure Review: Shutdown from Outside the Control Room (Group A) 72517 Startup Test Procedure Review: ,

Loss of l

Offsite Power (Group A and B) 72518 Startup Test Procedure Review (Core Perfor-l i

mance) (Group A and B) 72526 Initial Criticality Witnessing 72532 Power Level Plateau Data Review and Evaluation

s /

1 Section D:

4 These procedures shall be developed in accordance with the specifications in Section'D and the following:

}

Additional Prekihinary Requirements The contractor shall review the existing draft procedures for consis-tency and proper application of requirements.

1 Review current regulations, guides, codes, for additional requirements that must be included in the procedures. -

Incorporate additional requirements described in 01E-0P 0301 Develop a " background" section for all procedures.

(See attached Schedule A for reference) ,

Section F Meetings and Travel i

for proposal purposes, it is anticipated that one additional round trip from Pittsburgh, PA to Washington, DC will be required for this effort. NRC will fund only those trips approved on advance by the NRC project officer and directly applicable to the contract.

Work Needed Review Regulation Guides Codes, Review Procedure for Standards for Requirements and Consistent and Proper so identify and include other Rewrite Procedure to Current Year of Background Application of Requirements than Background IE Office Procedure 0301 Last Revision iS01 X X 1980 t300 X X 1984 E301 X X - 1984 l302 X X -

1984 c R400 X X X X 1980 {

$500 X X X X 1975 e 2524 X X - 1984 2 2564 X X X X 1980  ;;

2566 X X X  % 1980 2570 X X X X 1980  ;

B572 X X X X 1980 ,

t576 X X X 1980  ;

X X 1980 c E578 X X tS80 X X X X 1980 -

2582 X X X X 1980 g X X 1980 c 2583 X X 2584 X X X X 1980 -

2592 X X 1984 5 2596 X X X X 1980 ,a 2600 X X X X 1980 g 2608 X X X X 1980  ;;

2616 X X X X 1980 ,

X X X 1980 2 2624 X 2502 X X x X 1975 y X X X 1975 g 2504 X X X X 1980 2508 X X X X 1980 2509 X X X X 1980 2510 X X X X 1980 2512 X X X X 1980 2514 X X X X 1980 2516 X l

l 1 - _ _ _ _ _ - _ _ - _ _ - _ _ -

Review Regulation Guides Codes, Review Procedure for Standards for Requirements and Consistent and Proper so identify and include other Rewrite Procedure to Current Year of Background Application of Requirements than Background IE Office Procedure 0301 Last Revision 517 X X X X. 1980 j518 X X X X 1980 l526 X X 1984 332 X X 1984 ,

318 X X , 1984 g

.020 X X 1984 a

,022 X X 1984 y l034 X X 1984 2.

1984

  • l038 X X 1042 X X 1984 1984
  • l046 X X

[052 X X 1984 ,

l054 X X 1984 8

[058 X X 1984 ,

[062 X X 1984 8 l064 X X 1984 g LO66 X X 1984 LO70 X X 1984 1

'072 l X X 1984 g X X 1984 m (074 1984 " ,

LO78 X X X

1984 LO80 X ~

1984  ?

l084 X X 1088 X X 1984 e X

1984 2 1501 X 1984 X X 1601 'X 1982 X X

[810 X 1984 X

3521 X 1984 (521 X X X X 1975 D501 X X

Schedule B TYPICAL INSPECTION PLAN - LIGHT WATER REACTOR PLANTS r.-

(GENERAL PROCEDURES) ,, k

- Sr

' 5%

. PROCEO. PROCEDURE DESCRIPTION .9 NUMBER -6 INSPECTION SCHEDULE (months from OL)* m:

. -5 -4 -3 -2 -1 OL +1 t2 +3 +4 +5 +6 +7  ?>

SO 35501 QA for Startup' Test Program %f ly_

md 72300 Startup Test Procedure S da Review C EQ ~

- Z 2" m

72301 Startup Test Results S m

i' Evaluation C 72302 Startup Test Witnessing ,

S C 72400 Overall Startup Test Program S .. C 72500 Initial Fuel Loading S C .

7 Procedure Review c ,ro o

as

& 72524 Initial Fuel Loading S C -

Witnessing ,

85 = start inspection; C = complete inspection.

m .

> 1 PROCED. PROCEDURE DESCRIPTION NUIEER INSPECTION SCHEDULE (months from OL)*

5 -4 -3 -2 -1 OL +1 +2 +3 +4 +5 +6 +7 1 -

83530 Radiation Protection - SU & '

Power Ascension

84530 Radioactive Waste Systems -

l SU & Power Ascension

  • l 90501 Reportable Matters - Test Program 93700 Inspector Dispatched to .

Site - Test Program Related 85 = startup inspection; C = complete inspection. C E

g -i E

6:M .

'A

%A 9

?y O2 5%

,R Ed

%2

APPENDIX C .

my TYPICAL INSPECTION PLAN - LIGHT WATER REACTOR PLANTS E (BWR PROCEDURES) / '

E g

.~

PROCED.

gG PROCEDURE DESCRIPTION m=

MBER _

59 5 -4 -3INSPECTION 1 SCHEDULE OL +1 +2 (mont'hs from OL)*

+3 +4 +5 +6 +7 72502 Initial Criticality Procedure 3-N i Review S C ,

i g

,' 72504 2

Heatup Phase Procedure E j Review S C 12508 Power Ascension Procedure i

Review: HPCI System S C i

72509 Power Ascension Procedure ,

Review: CRD System , S C 72510 Power Ascension Procedure i

Review (RV-MSIV) S C i

! 72512 Startup Test Procedure ,'

Review (RCICS/ Recirculation

! Pump Trip) S C

  • 5 = start inspection; C = complete inspection. .

5

~

im I l

!