ML20134N866
| ML20134N866 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 11/20/1996 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20134N868 | List: |
| References | |
| ULNRC-3496, NUDOCS 9611270139 | |
| Download: ML20134N866 (2) | |
Text
. v.
4 1901 Chouteau Avenne Post Ol'tce Box 149 St. Iouis, Missouri 63166
' 314 654-2650 DonaldF. SchneII Eui wc i": ?""*"'
November 20, 1996 g
.U.
S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Station Pl-137 Washington, D. C.
20555-0001 Gentlemen:
ULNRC-3496 L
CALIAWAY PLANT DOCKET NUMBER 50-483 CORE OPERATING LIMITS REPORT Attached please find the Callaway Plant Cycle 9 Core Operating Limits Report (COLR).
This report is provided to the NRC Staff for information.
l If you have any questions concerning this report, please contact us.
Very truly yours, Donald F.
Schnell WEK/
' Attachment i
901 d
i a
\\
9611270139'961120
'PDR ADOCK 05000493 p
PDR.
l
-j
4 cc:
M. H. Fletcher Professional Nuclear Consulting, Inc.
-19041 Raines Drive Derwood, MD 20855-2432 L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Kristine M. Thomas (2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E16 11555 Rockville Pike Rockville, MD 20852-2738 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 Nuclear Energy Institute 1776 I Street N.W.
Suite 400 Washington, DC 20006-3708 i