ML20134N345

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/85-31 & 50-364/85-31 on 850711-0810.No Violation or Deviation Identified
ML20134N345
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/21/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20134N347 List:
References
NUDOCS 8509050101
Download: ML20134N345 (2)


See also: IR 05000348/1985031

Text

__ _ . _ _

, i

9-

AUG 211985

.

>

AJabama Power Company

VATTN: Mr. R. P. Mcdonald

Senior Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/85-31 AND 50-364/85-31

On July 11 August 10, 1985, NRC inspected activities authorized by NRC License .

Nos. NPF-2 and NPF-8 for your Farley facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

4

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL Sfcwm w

DAVID M. VERRRl,j

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-348/85-31

and 50-364/85-31

cp w/ encl:

W. O. Whitt, Executive Vice President

d D. Woodard, Plant Manager

(Y G. Hairston, III, Manager, Nuclear Engineering

and Technical Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

if 0. Thrash, Manager, Nuclear Operations

and Administration

M G. Ware, Superviscr-Safety Audit

and Engineering Review

bec w/ encl: (See page 2)

810905010 850821

Pan A o50003gg

G PDR ^ r

g I

'

ZEol

, -. . .- . . -

.,

':, .

-.

Alabama ~ Power Company 2 AUG 211985

n t, Executive Vice. President

M. .Woodard, Plant Manager

.V.G.Hairston,III, Manager, Nuclear

Engineering and Technical Support

hW.McGowan, Manager-SafetyAudit

and Engineering Review

IV O. Thrash, Manager, Nuclear

Operations and Administration

i M . Ware, Supervisor-Safety Audit

and' Engineering Review

i c w/ encl:

l RC Resident Inspector

v E Reeves, Project Manager, NRR

Document Control Desk

l State of Alabama

i i

l

l

l

i

!

l

l

l

l

1

.

,

!

r

I

l

! >

l RII RII

AJ on:sa FCa 1

j.

~

08/.1o/85 08/p /85

l i

l

,