MONTHYEARIR 05000295/19930071993-04-13013 April 1993 Insp Repts 50-295/93-07 & 50-304/93-07 on 930329-0402.No Violations Noted.Major Areas Inspected:Previously Identified Edsfi Findings Conducted,Per Temporary Instruction 2515/111 & Electrical Mods (NRC Insp Procedure 37700) Project stage: Request ML20044H4061993-05-17017 May 1993 Forwards Rev 33 to Security Plan.Rev Reflects Deletion of Laundry Facility as Vital Area as Identified in Figure 5-6 & Current Station Organization Structure as Applies to Security Dept.Rev Withheld,Per 10CFR73.21 Project stage: Other ML20045H0511993-06-17017 June 1993 Forwards Rev 30 to Security Plan,Addressing Issues Re Use of Alternate Perimeter Alarm Reporting Sys & Redundant Access Control Sys.Rev Withheld (Ref 10CFR73.21) Project stage: Other ML20058E9291993-11-22022 November 1993 Forwards Rev 34 to Security Plan.Rev Outlines Temporary Security Measures During Dual Unit Svc Water Outage.Encl Withheld (Ref 10CFR73.21) Project stage: Other ML20149K2291996-02-15015 February 1996 Forwards Rev 40 of Zion Nuclear Power Station Security Plan. Encl Withheld Project stage: Other ML20134N1451996-11-14014 November 1996 Forwards 3 Copies of Rev 41 to Zion Nuclear Power Station Security Plan in Response to Re Vehicle Barrier Sys.Plan Withheld Project stage: Other ML20140E9371997-04-17017 April 1997 Forwards Rev 42 to Zion Nuclear Station Security Plan Which Identifies Implementation of New Security Computer Sys.Encl Withheld,Per 10CFR73.21 Project stage: Other ML20211B0911997-09-12012 September 1997 Informs That Organizational Chart in Revised Security Plan Is Inaccurate Due to Realignment of Nuclear Operating Div Organizational Structure on 970903.Will Submit Current Structure by 971103 Project stage: Other ML20217F9441997-10-0202 October 1997 Forwards Rev 43 of Zion Nuclear Power Station Security Plan Which Reflects Changes in Organizational Structure of Utils Nuclear Security Dept.Plan Withheld Project stage: Other 1996-11-14
[Table View] |
Similar Documents at Zion |
|---|
|
Text
__
(hmmonwcalth Edoon Compan)
,',7,]'l,"y,l"""'"
bIWL3 oway,. n. uumn,-
SAFEGUARDS INFORMATION NO.1 November 14,1996 CERTIFIED MAIL U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Zion Nuclear Power Stations Units 1 and 2 Zion Station Security Plan NRC Docket Nos. 50-295 & 50-304 TAC Nos. 65425/65426 Enclosed is the original and three (3) copies of Revision 41 of the Zion Nuclear Power Station Security Plan. This submittal is in response to Mr. J.
Creed's letter of June 27,1996 dealing with the Vehicle Barrier System (VBS).
Pursuant to 10CFR 50.54(p), the signed original and three copies of the Security Plan revisions are being provided to your office. A copy of this letter and two copies of the Security Plan revisions are being sent to Region Ill.
We have concluded that these changes do not decrease the safeguards effectiveness of the plan. These enclosures contain Safeguards Information which must be protected from public disclosure pursuant to 10CFR 73.21.
Sincerely, Irene M. Johnson
~
Licensing Operations Director EncIosures 9611260185 961114 PDR ADOCK 05000295 F
PDR
/)
cc: A. B. Beach h/f
)
sy,
THE ENCLOSURE CONTAINS SAFEGUARDS INFORMATION j
c g()(66 Upon separation, this naae is decontrolled k '
COfftEd
~
7 4 rnkum company SAFEGUARDS INFORMAT10N
\\