ML20134M843
| ML20134M843 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/28/1985 |
| From: | Grimes B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20134M847 | List: |
| References | |
| NUDOCS 8509040292 | |
| Download: ML20134M843 (5) | |
See also: IR 05000498/1985014
Text
OCS Oiy
!
.
.
[
"%
UN!TED STATES
e
't
NUCLEAR REGULATORY COMMISSION
,
h
..g
o
WASHINGTON, D. C. 20555
e
.....
AUS 2 815
Docket Nos. 50-498
and 50-499
.
Mr. J. H. Goldberg
Group Vice President - Nuclear
Houston Lighting and Power Company
Post Office Box 1700
Houston, Texas 77001
Dear Mr. Goldberg:
Subject: SOUTH TEXAS PROJECT ENGINEERING ASSURANCE PROGRAM (EAP)
INSPECTION REPORT 50-498/85-14
This -letter conveys the NRC's evaluation of Stone and Webster Engineering
Corporation's (SWEC) audits of two EAP tasks:
Control Room HVAC (Task 85-1)
and the Component Cooling Water System (Task 85-2). The inspection was
conducted by a team of personnel from the NRC's Office of Inspection and
Enforcement and consultants at the SWEC offices in Boston, Massachusetts
from July 22, 1985 to July 26, 1985. The objective of the inspection was
threefold:
(1) to verify that SWEC's audits of the two aforementioned EAP
topics were performed in sufficient technical depth to achieve the objectives
of the EA Program; (2) verify that the background documentation supported
the findings and conclusions of the reports; and (3) to review the status of
items identified by the NRC'in Inspection Report 50-498/85-09.
Based on this review, the NRC found that Tasks 85-1 and 85-2 were acceptably
completed subject to comments contained in this report. The SWEC review was
!
comprehensive, checksheets were thoroughly completed, files were in good order,
-
and backup documentation was auditable and supported SWEC's findings and
conclusions. Subsequent NRC inspection on Tasks 85-1 and 85-2 will focus on
resolution of action items and implementation of corrective actions.
The specific items identified in our prior Inspection Report No. 50-498/85-09
were reviewed by the NRC during this inspection. Attachment 1 to the enclosed
inspection report provides our disposition of each of the prior inspection
report items.
The next inspection of your EAP is tentatively scheduled for November 1985.
The purpose of this inspection is to inspect the implementation of corrective
-
actions associated with prior EAP audits and is, therefore, contingent upon
!
>
8509040292 850828
M
ADOCK 05000498
,
l
G-
..
_
_.
--.
-
-
.
.
Mr. J. H. Goldberg
-2-
-
your verification that these corrective actions have been implemented. During
that forthcoming inspection we plan to follow-up on the items identified in the
enclosed Inspection Report including confirmation of items associated with
Inspection Report No. 50-498/85-09 that have been closed based on commitments
or action by HL&P. These confirmatory items are summarized on page 5 of
Attachment 1.
Since ely,
rian K. Grimes, Director
Division of Quality Assurance, Vendor,
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosure:
Inspection Report
cc w/ enclosure:
See next page
.,
.(
(
l
t
'
.
.
Mr. J. H. Goldberg
-3-
-
cc w/ enclosure:
Mr. J. T. Westermeir
Brian Berwick, Esq.
Manager, South Texas Project
Assistant Attorney General
Houston Lighting and Power Company
Environmental Protection Division
P. O. Box 1700
P. O. Box 12548
Houston, Texas 77001
Capitol Station
Mr. E. R. Brooks
Mr. R. L. Range
Mr. D. P. Tomlinson, Resident
Central Power and Light Company
Inspector / South Texas Project
P. O. Box 2121
c/o V. S. NRC
Corpus Christi, Texas 78403
P. O. Box 910
Bay City, Texas 77414
Mr. H. L. Peterson
Mr. G. Pokorny
Mr. Jonathan Davis
City of Austin
Assistant City Attorney
P. O. Box 1088
City of Austin
P. G. Box 1088
,
Mr. J. B. Poston
Mr. A. Von Rosenberg
Ms. Pat Coy
City Public Service Board
Citizens Concerned About
P. O. Box 1771
Nuclear Power
San Antonio, Texas 78296
5106 Casa Oro
San Antonio, Texas 78233
Jack R. Newman, Esq.
Newman & Holtzinger, P.C.
Mr. Mark R. Wisenberg
1615 L Street, N. W.
Manager, Nuclear Licensing
Washington, D. C.
20036
Houston Lighting and Power Company
P. O. Box 1700
Melbert Schwartz, Jr., Esq.
Houston, Texas 77001
Baker & Botts
One Shell Plaza
Mr. Charles Halligan
Houston, Tcxas 77002
Mr. Burton L. Lex
Bechtel Corporation
Mrs. Peggy Buchorn
P. O. Box 2166
Executive Director
Houston, Texas 77001
Citizens for Equitable Utilities, Inc.
Route 1, Box 1684
Mr. Lanny Sinkin
Brazoria, Texas 77422
Citizens Concerned About
Nuclear Power
Regional Administrator - Region IV
c/o Nuclear Information and
U.S. Nuclear Regulatory Commission
Research Service
611 Ryan Plaza Drive
1346 Connecticut Avenue, N. W.
Suite 1000
Fourth Floor
Arlington, Texas 76011
Washington, D. C.
20036
.
William S. Jordan, III, Esq.
Mr. S. Head
Harmon, Weiss & Jordan
HL&P Representative
2001 S Street, N. W.
Suite 1309
Suite 430
7910 Woodmont Avenue
Washington, D. C.
20009
Bethesda, Maryland 20814
.
,
..
.
.
.
Mr.J.~N.Goldberg
-4-
c
,
cc w/ enclosure:
~
Dan Carpenter, Resident Inspector
South-Texas Project
c/o U.S. NRC.
.P.:0. Box-2010
Bay City, Texas 77414
,
1
i
i-
-
f
.S
i
i
!
l
1
t
i
!
l
!..
O
!
i
'
i
b
..
o
a p '.
'
~ .
,
- .
.
,
Mr. J.:H. Goldberg-
-5-
' DISTRIBUTION:
-
.
DC5 016
NRC PDR-
Local PDR
QAB Reading
DQAVT Reading
JMTaylor, IE
,
RHVollmer, IE~
,-
BKGrimes, IE
'
JGPartlow, IE
F
GTAnkrum, IE
-JLMilhoan, IE
EVImbro, IE
RWParkhill, IE
HWang, IE-
'PKadambi, NRR
HThompson,.NRR
TMtiovak, NRR
- WButler, NRR
-EHylton,-NRR
AE00-
'0 ELD
- ACRS (10)
-
,
Regional Administrators
Regional Division Directors-
TSpeis, NRR
ELJordan, IR
JAxelrad,~ IR
-Team Members
HBoulden, OIA
SECY
OPE
,
WJDircks, EDO
- HRDenton,.NRR
OCA (3)
-
,ff
pt
)
IE:QAB
IE:QAB
.QAB'
IE:
IE:
.R/QAVT
'
- RWParkhill: esp
EVImbro-
~JL 1hoan
GT
um hB2 imes
. 8gy/85-
' 8/g3/85
8/p 85
. 8/77/85
U~
8/>7/85
i
ena
--
7-
_.
=9-g-
gey