Forwards Engineering Assurance Program Insp Rept 50-498/85-14 on 850722-26 at S&W in Boston,Ma.Tasks 85-1 & 85-2 Re Control Room HVAC & Component Cws,Respectively, Acceptably Completed Subj to Rept Comments
ML20134M843
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 08/28/1985
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20134M847 List:
References
NUDOCS 8509040292
Download: ML20134M843 (5)


See also: IR 05000498/1985014

Text

OCS Oiy

! *

. .

, e

[ "%

't

UN!TED STATES

NUCLEAR REGULATORY COMMISSION

h ..g WASHINGTON, D. C. 20555

o e

.....

AUS 2 815

Docket Nos. 50-498

and 50-499

.

Mr. J. H. Goldberg

Group Vice President - Nuclear

Houston Lighting and Power Company

Post Office Box 1700

Houston, Texas 77001

Dear Mr. Goldberg:

Subject: SOUTH TEXAS PROJECT ENGINEERING ASSURANCE PROGRAM (EAP)

INSPECTION REPORT 50-498/85-14

This -letter conveys the NRC's evaluation of Stone and Webster Engineering

Corporation's (SWEC) audits of two EAP tasks: Control Room HVAC (Task 85-1)

and the Component Cooling Water System (Task 85-2). The inspection was

conducted by a team of personnel from the NRC's Office of Inspection and

Enforcement and consultants at the SWEC offices in Boston, Massachusetts

from July 22, 1985 to July 26, 1985. The objective of the inspection was

threefold: (1) to verify that SWEC's audits of the two aforementioned EAP

topics were performed in sufficient technical depth to achieve the objectives

of the EA Program; (2) verify that the background documentation supported

the findings and conclusions of the reports; and (3) to review the status of

items identified by the NRC'in Inspection Report 50-498/85-09.

Based on this review, the NRC found that Tasks 85-1 and 85-2 were acceptably  :

completed subject to comments contained in this report. The SWEC review was  !

comprehensive, checksheets were thoroughly completed, files were in good order, -

and backup documentation was auditable and supported SWEC's findings and

conclusions. Subsequent NRC inspection on Tasks 85-1 and 85-2 will focus on  ;

resolution of action items and implementation of corrective actions.

The specific items identified in our prior Inspection Report No. 50-498/85-09

were reviewed by the NRC during this inspection. Attachment 1 to the enclosed

inspection report provides our disposition of each of the prior inspection

report items.

The next inspection of your EAP is tentatively scheduled for November 1985.

The purpose of this inspection is to inspect the implementation of corrective -

actions associated with prior EAP audits and is, therefore, contingent upon  !

>

8509040292 850828 M ,

PDR ADOCK 05000498 l

G- PDR

_ --. - -

. .

l

-

Mr. J. H. Goldberg -2- l

your verification that these corrective actions have been implemented. During

that forthcoming inspection we plan to follow-up on the items identified in the

enclosed Inspection Report including confirmation of items associated with

Inspection Report No. 50-498/85-09 that have been closed based on commitments

or action by HL&P. These confirmatory items are summarized on page 5 of

Attachment 1.

Since ely,

rian K. Grimes, Director

Division of Quality Assurance, Vendor,

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure:

Inspection Report

cc w/ enclosure:

See next page

.,

.(

(

l

l

t

'

. .

-

Mr. J. H. Goldberg -3-

cc w/ enclosure:

Mr. J. T. Westermeir Brian Berwick, Esq.

Manager, South Texas Project Assistant Attorney General

Houston Lighting and Power Company Environmental Protection Division

P. O. Box 1700 P. O. Box 12548

Houston, Texas 77001 Capitol Station

Austin, Texas 78711

Mr. E. R. Brooks

Mr. R. L. Range Mr. D. P. Tomlinson, Resident

Central Power and Light Company Inspector / South Texas Project

P. O. Box 2121 c/o V. S. NRC

Corpus Christi, Texas 78403 P. O. Box 910

Bay City, Texas 77414

Mr. H. L. Peterson

Mr. G. Pokorny Mr. Jonathan Davis

City of Austin Assistant City Attorney

P. O. Box 1088 City of Austin

,

Austin, Texas 78767 P. G. Box 1088

Austin, Texas 78767

Mr. J. B. Poston

Mr. A. Von Rosenberg Ms. Pat Coy

City Public Service Board Citizens Concerned About

P. O. Box 1771 Nuclear Power

San Antonio, Texas 78296 5106 Casa Oro

San Antonio, Texas 78233

Jack R. Newman, Esq.

Newman & Holtzinger, P.C. Mr. Mark R. Wisenberg

1615 L Street, N. W. Manager, Nuclear Licensing

Washington, D. C. 20036 Houston Lighting and Power Company

P. O. Box 1700

Melbert Schwartz, Jr., Esq. Houston, Texas 77001

Baker & Botts

One Shell Plaza Mr. Charles Halligan

Houston, Tcxas 77002 Mr. Burton L. Lex

Bechtel Corporation

Mrs. Peggy Buchorn P. O. Box 2166

Executive Director Houston, Texas 77001

Citizens for Equitable Utilities, Inc.

Route 1, Box 1684 Mr. Lanny Sinkin

Brazoria, Texas 77422 Citizens Concerned About

Nuclear Power

Regional Administrator - Region IV c/o Nuclear Information and

U.S. Nuclear Regulatory Commission Research Service

611 Ryan Plaza Drive 1346 Connecticut Avenue, N. W.

Suite 1000 Fourth Floor

Arlington, Texas 76011 Washington, D. C. 20036

.

William S. Jordan, III, Esq. Mr. S. Head

Harmon, Weiss & Jordan HL&P Representative

2001 S Street, N. W. Suite 1309

Suite 430 7910 Woodmont Avenue

Washington, D. C. 20009 Bethesda, Maryland 20814

,

.. .

. .

c Mr.J.~N.Goldberg -4-

,

~

cc w/ enclosure:

Dan Carpenter, Resident Inspector

South-Texas Project

c/o U.S. NRC.

.P.:0. Box-2010

Bay City, Texas 77414

,

1

i

i-

-

f .S

i

i

!

l

1

t

i

!

l

!.. O

!

i

'

i

..

b

o

a p '.

'

~ .,

- . .

,

Mr. J.:H. Goldberg- -5-

' DISTRIBUTION:

-

. DC5 016

NRC PDR-

Local PDR

QAB Reading

DQAVT Reading

JMTaylor, IE ,

RHVollmer, IE~

,-

'

BKGrimes, IE

JGPartlow, IE

F GTAnkrum, IE

-JLMilhoan, IE

EVImbro, IE

RWParkhill, IE

HWang, IE-

'PKadambi, NRR

HThompson,.NRR

TMtiovak, NRR

WButler, NRR

-EHylton,-NRR

AE00-

'0 ELD

NMSS

RES

- ACRS (10)

-

NSIC ,

NTIS

Regional Administrators

Regional Division Directors-

TSpeis, NRR

ELJordan, IR

JAxelrad,~ IR

-Team Members

HBoulden, OIA

SECY

, OPE

WJDircks, EDO

HRDenton,.NRR

OCA (3)

-

,ff pt )

IE: IE:

'

IE:QAB IE:QAB .QAB' .R/QAVT

- RWParkhill: esp EVImbro- ~JL 1hoan GT um hB2 imes

. 8gy/85- ' 8/g3/85 8/p 85 . 8/77/85 U~ 8/>7/85

i

ena --

7- _.

=9-g- gey