Forwards Safety Insp Repts 50-373/85-23 & 50-374/85-18 on 850610-0815.Util Will Be Notified by Separate Correspondence of NRC Decision Re Enforcement Action Based on Insp Findings
ML20134M801
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/21/1985
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20134M805 List:
References
NUDOCS 8509040272
Download: ML20134M801 (2)


See also: IR 05000373/1985023

Text

  • # "' UNn to st Af ts

/Mb

-# NUCLEAR R E GUL A10RV C O'EIS clO N

i

{ s

j 4EctoN nt

. , t9 -

7% s.O O 5 F VI L T 54 0 t 8

,8% /,

C LEN I LL YN ILUNOIS 60'2'

'

. .... AUG 211985

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Bcx 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted during the period of

June 10 through August 15, 1985, of activities at the LaSalle County Nuclear

Power Station, Units 1 & 2, authorized by NRC Operating Licenses No. NPF-11

and NPF-18. The results of this inspection were discussed during an enforce-

ment conference conducted at the LaSalle site on June 24, 1985 and during a

subsequent discussion on July 30, 1985, between Mr. D. Farrar of your staff

and Mr. N. Chrissotimos of this office. We are releasing this report at this

time for your information. You will be notified by separate correspondence

of our decision regarding enforcement action based on the findings of this

inspection. No written response is required until you are notified of the

proposed enforcement action.

In accordance with 10 CFR 2.790(a) of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosure

will be placed in the NRC's Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

SW Y.

Charles E. Norelius, Director

Division of Reactor Projects -

Enclosure: Inspection Reports

No.50-373/85023(DRP);

No. 50-374/85018(DRP)

cc w/ enclosure:

D. L. Farrar, Director

. of Nuclear Licensing

G. J. Diederich, Plant

Manager ,

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

~ I

8509040272 850821

PDR ADOCK 05000373

_ __ . . _ .

_ __

.

.

AUG 211985

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

-

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted during the period of

June 10 through August 15, 1985, of activities at the LaSalle County Nuclear

Power Station, Units 1 & 2, authorized by NRC Operating Licenses No. NPF-11

and NPF-18. The results of this inspection were discussed during an enforce-

ment conference conducted at the LaSalle site on June 24, 1985 and during a

subsequent discussion on July 30, 1985, between Mr. D. Farrar of your staff

and Mr. N. Chrissatimos of this office. We are releasing this report at this

time for your information. You will be notified by separate correspondence

of our decision regarding enforcement action based on the findings of this

inspection. No written response is required until you are notified of the

' proposed enforcement action.

In accordance with 10 CFR 2.790(a) of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosure

will be placed in the NRC's Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

  • 0riginal signed by C.E. Norelius'

Charles E. Norelius, Director

Division of Reactor Projects

Enclosure: Inspection Reports

No.50-373/85023(DRP);

No.50-374/85018(DRP)

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

G. J. Diederich, Plant

Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

RIII RIII RIII RIII

Wri s Ch sotimos s Nh tz

08/20/85  % -Lo