ML20134M409

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-12,providing Addendum to Tech Spec Section 3/4.4.5 Re Specific Alternative Action for Defective Steam Generator Tubes & Repair of Tubes Using NRC Approved Method
ML20134M409
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/30/1985
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20134M412 List:
References
NUDOCS 8509040113
Download: ML20134M409 (2)


Text

r--

i l

1 SOUTH CAROLINA ELECTRIC & GAS COMPANY POST OFFICE 764 cowueia, soum c4=ousa 2ezia

o. w. o.noN. sm. August 30, 1985 VtCs PatsIDENT l i

NUCLE Am OrtmATioNs Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation -

U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Steam Generator Tube Plugging Criteria

Dear Mr. Denton:

South Carolina Electric and Gas Company (SCE&G) hereby requests. an amendment .to the Virgil C. Summer Nuclear Station Technical Specifications Section 3/4.4.5,

" Steam Generators." This amendment would provide an addendum to the Degraded Tube and Tube Plugging Limit criteria in Section 4.4.5.4 for items 4.4.5.4.a.3 &

6. This addendum would allow for specific alternative action for defective steam generator tubes when such action has been reviewed and approved by the NRC. The amendment would also change Table 4.4-2, " Steam Generator Tube Inspection," to allow for the repair of defective steam generator tubes using an NRC approved method. The flexibility provided by this amendment is requested to take advantage of recent developments in steam generator tube analyses and tube repair methods. Expeditious processing of this change is requested should this flexibility be needed during the second re fueling outage scheduled to connence October 4, 1985.

Attachment I is a copy of the proposed revision to Technical Specifications, pages 3/4 4-14 and 17. Attachment II is the proposed no significant hazards determination. These changes have been reviewed and approved by both the Plant Safety Review Committee and the Nuclear Safety Review Committee.

The application fee of one hundred fif ty dollars ($150.00) as required by Title 10 of the Code of Federal Regulations, paragraph 170, has been sent under separate cover via SCE&G check number 216017. The check has been received and deposited by Ms. Leah Tremper of the License Fee Management Branch.

If you should have any questions, please advise.

Very truly yours, 8509040113 B50830 /

PDR P

ADOCK 05000395 PDRg

/ F

0. W. Dixon, r.

AW/ JAW /0WD/csw At tachment cc: (See page 2) 9*(

t\

f

r:

Mr. Harold R. Denton

. August'30, 1985 Page 2 cc: V.~ C. Summer C. A. Price T. C. Nichols, Jr./0. W. Dixon, Jr. C. L. Ligon (NSRC)

E. H. Crews, Jr. ~K. E. Nodland E. C. Roberts R . A . S t ou gh -

W. A. Williams, Jr. G. O. Percival D. A. Nauman C.'W. Hehl J. Nelson Grace J. B. Knotts, Jr.

Group Managers H. G. Shealy O. S. Bradham NPCF File 5

i 9

A f.

-_:___ ._ __ 2 -_ __ _ _____ -__--______ ._ ____ - ______=---__ _ _ - ____--_ -_-_-__-2