ML20134M314

From kanterella
Jump to navigation Jump to search
Confirmatory Action Ltr CAL-RIII-85-12 Re 850828 Conversation on Loss of Badge Sys Integrity.Security Officer Should Be Posted in Const Dump Area to Observe Cleanup Operations
ML20134M314
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/29/1985
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
CAL-RIII-85-12, NUDOCS 8509040078
Download: ML20134M314 (2)


Text

_.. _._. . _ _ _ _ _ _ _ _ . _ _ _ _ . _ . _ _ . - _ _ _ _ _ _ _ . _ _ .

l CONFIRMATORY ACTION LETTER T) g l

AUG 2 91995 l l

Docket No. 50-373 CAL-RIII-85-12  :

Docket No. 50-374 l

Commonwealth Edison Company .

ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

This letter refers to the conversation on August 28, 1985, between Mr. Dale A. Kers of the regional staff and Mr. Thomas Borszym, Staticn Security Administrator, concerning the loss of the badge system f ntegrity at the LaSalle County Nuclear Station.

Based on the matters discussed, it is our understanding that the following actions are being taken by the licensee: j

a. A security officer will be posted in the Construction Dump area to ,

observe the cleanup operations to locate, if possible, any badge /keycards  :

that may have been thrown away. This officer will be posted in this area  !

whenever the bulldozer is onsite moving trash in preparation for loading into dumpsters. The post will be terminated whenever the trash piles are totally removed from the site.

b. A security officer (two in rush hours) will be posted between the t protected area turnstyles and the East doors of the Main Access Facility to verify that the badge issued to an individual is the badge that is .

used by that individual to gain access to the prctected area. This post '

will remain in effect until September 30, 1985,

c. A feasibility study to determine the possibility of upgrading the badge  !

system to accept higher numbered badges will be conducted by the licensee. l The results of this study will be forwarded to the Nuclear Regulatory i Commission, Region III by September 13, 1985.

I i

i e509040078 PDR ADOCK O 9%373 F

PDR-

/ Ob l O CONFIRMATORY ACTION LETTER

CONFIRMATORY ACTION LETTER e

i Commonwealth Edison Company

. 2 AUG 2 01985 i

When the cleanup activities of the trash piles, where badges had been found, i

are completed or additional badges are found telephonic notification will be  ;

l provided to Mr. J. R. Creed, Chief, Safeguards Section, (312) 790-5500, Region III. If your understanding of our discussion is different from that stated above, please inform this office immediately.

i Sincerely, i Original $lgned by A. Dert DAVIS James G. Keppler Regional Administrator 3

) cc: DMB/ Document Control Desk (RIDS)

E. Schweibinz, DRS/TSS i

D. L. Farrar, Director of Nuclear Licensing G. J. Diederich, Plant Manager 1 Resident Inspector, RIII l Phyllis Dunton, Attorney i General's Office, Environmental i control Division i

f i

i i

l l

.h l V/

i R RIII RIII RII I NMSS/IAT). RIII RIII

K hld g 4J Ax m on g

Schultz d i 1 ht W

Davidson Er in ,1)[deTler J

j 4

Belanger Cr ed 3h II Ig "/ [p[

4 08/29/85 CONFIRMATORY ACTION LETTER i