ML20134M205

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Updates to Emergency Plan Implementing Procedures.Encls Withheld
ML20134M205
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/08/1985
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
DCL-85-264, NUDOCS 8509040015
Download: ML20134M205 (1)


Text

-A-

-h-O j T_'

PACIFIC GAS AND E LE C T RI C C O M PANY 77 BE ALE STREET, S AN FR ANCISCO, C AllFORNI A 94106 TE LEPHONE (415) 781 4211 August 8,1985 PGandE Letter No.: DCL-85-264 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-81 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedure Updates

Dear Mr. Martin:

In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan. These updates are listed in Enclosure 1.

Concurrently, two copies of each update are being submitted to the Document Control Desk.

Some of the updates contain privacy / proprietary information. This privacy /

oronrietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is icentified in Enclosure 2.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

1 Sincerely, ORIGINAL SIGNED BY J. D. Shiffer Enclosures (3) cc:

R. T. Dodds R. Fish cc w/o Enc 3:

G. W. Knighton 8509040015 850808 PDR ADOCK 05000275 F

PDR O