ML20134M205
| ML20134M205 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/08/1985 |
| From: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| DCL-85-264, NUDOCS 8509040015 | |
| Download: ML20134M205 (1) | |
Text
-A-
-h-O j T_'
PACIFIC GAS AND E LE C T RI C C O M PANY 77 BE ALE STREET, S AN FR ANCISCO, C AllFORNI A 94106 TE LEPHONE (415) 781 4211 August 8,1985 PGandE Letter No.: DCL-85-264 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-81 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedure Updates
Dear Mr. Martin:
In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan. These updates are listed in Enclosure 1.
Concurrently, two copies of each update are being submitted to the Document Control Desk.
Some of the updates contain privacy / proprietary information. This privacy /
oronrietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is icentified in Enclosure 2.
Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.
1 Sincerely, ORIGINAL SIGNED BY J. D. Shiffer Enclosures (3) cc:
R. T. Dodds R. Fish cc w/o Enc 3:
G. W. Knighton 8509040015 850808 PDR ADOCK 05000275 F
PDR O