ML20134L747

From kanterella
Jump to navigation Jump to search
Forwards Revised marked-up TS Pp for Units 1 & 2 Which Supersede Same Pp Contained in 960628 Submittal Re Adoption of Performance Based 10CFR50,App J,Option B Testing
ML20134L747
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/05/1996
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134L749 List:
References
NUDOCS 9611210200
Download: ML20134L747 (2)


Text

-

Ettilon Support Departmeset N

.w PECO NUCLEAR ecco sme,2, ccmoem, A Unit of PECO Energy NfyIp'I*N7Ni November 5,1996 Docket Nos. 50-352 50-353 Ucense Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Umerick Generating Station, Units 1 and 2 Technical Specifications Change Request No. 95-14-0 Adoption of Performance Based,10 CFR 50, " Appendix J, Option B Testing," Supplement Gentlemen:

By letter dated June 28,1996, PECO Energy Company submitted Umerick Generating Station (LGS), Unit 1 and Unit 2, Technical Specifications (TS)

Change Request No. 95-14-0. By telephone on September 19,1996 the NRC requested clarification of the proposed TS wording contained in TS pages 3/4 6-2 and 3/4 6-4. to this letter contains the revised " marked-up" Unit 1 and Unit 2 TS pages (i.e.,3/4 6 2 and 3/4 6-4), which supersede the same pages contained in the June 28,1996 submittal. This information is being submitted under affirmation, and the required affidavit is enclosed.

If you have any questions, please do not hesitate to contact us.

'(C f

/

ry trul yours,p.

.a.

.A. Hung, Jr Director-Ucensing Enclosure, Attachments 210034 cc:

H. J. Miller, Administrator, Region I, USNRC (w/ enclosure, attachments)

N. S. Perry, USNRC Senior Resident inspector, LGS (w/ enci, attachments)

R. R. Jarati, PA Bureau of Radiation Protection (w/ enclosure, attachments) 9611210200 961105 PDR ADOCK 05000352 P

pop _

48 COMMONWEALTH OF PENNSYLVANIA ss.

COUNTY OF CHESTER D. B. Fetters, being first duty sworn, deposes and says: That he is Vice President of PECO Energy Company, the Applicant herein; that he has read the enclosed supplement supporting Technical Specifications Change Request No. 95 0 " Adoption of Performance Based.10 CFR 50, Appendix J, Option B Testing," for Limerick Generating Station, Unit 1 and Unit 2, Facility Operating Ucense Nos. NPF-39 and NPF-85, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

-u Qh v

Subscribed ar'd sworn to before me this /

day of 1996.

h A %cE N6tary Public N; : _ ; ai

-#/[dj]'O.

),fitty LCU S' U

-y 3,unn h.

~;-

3' -

y..

.-