ML20134L668

From kanterella
Jump to navigation Jump to search

Forwards AD - Stand by SD Auxiliary Diesel Engine, in Response to RAI
ML20134L668
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/05/1997
From: Mccollum W
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134L672 List:
References
TAC-M97177, TAC-M97178, NUDOCS 9702190256
Download: ML20134L668 (1)


Text

. _ _.

- _ _. ~._. _._. _

l li i

~

Duke k er Company HtwauR ht:Catttu,JR Catauha Nudear Couration Department Vicelhsulent 48tXIConcordRoad (803)831JMIOffice York, SC3745 (803)31131% Fax y

t DUKEPOWER February 5, 1997 f

t U.S. Nuclear Regulatory Commission

~

1-Attention:

Document Control Desk Washington, D.C. 20555-0001 t

t 1

o I

j

Subject:

Duke Power Company Catawba Nuclear Station, Unit 1 and Unit 2 i

e Docket Nos. 50-413 and 50-414 Request for Additional Information 4

Amendment to Technical Specification I

3 / 4. 7 '.13, Standby Shutdown System TAC M97177,,M97178 4

At the request of Peter. Tam, NRC Project Manager, NRR, please find attached a copy of PM/IG-122, Standby Shutdown Auxiliary j

Diesel Engine.

This procedure includes the inspection i

requirements that are required by the Technical: Specification Surveillance 4.7.13.1c, which is the related to the subject l

amendment.

1 d

Should there be any questions concerning this information, please i

call D. Tower at (803) 831-3419.

)

i i

i Very truly yours, I

C William R. McCollum, Jr.

j i

Attachment l

1 xc:

L.A. Reyes, Regional Administrator i

Region II R.J.

Freudenberger, Senior Resident Inspector Catawba Nuclear Station

(

P.S. Tam, Senior Project Manager j

I ONRR

)

~

9702190256 970205 PDR-ADOCK 05000413 P

PDRy swea m w rww

<