Text
-..
e nto y*
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. 20666 4 001 o
o 4.....g ENTERGY OPERATI0AS. INC.
SYSTEM ENERGY RESOURCES. INC.
S00fH MISSISSIPPI ELECTRIC POWER ASSOCIATION ENTERGY MISSISSIPPI. INC.
DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.130 License No. NPF-29 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The applications for amendment by Entergy Operations, Inc. (the licensee) dated May 9, 1996, as supplemented by' letter dated August 27, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9611210121 961118 PDR ADOCK 05000416 P
. 2.
Accordingly, the license is amended by changes to the Technical l
Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-29 is hereby amended to read as follows:
(2) Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.130, are hereby incorporated into this license.
Entergy Operations, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION h
s
%Ch, M
Jack N. Donohew, Senior Project Manager Project Directorate IV-I Division of Reactor Projects III/IV
)
Offiee of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications 4
Date of Issuance:
November 18, 1996 i
i ATTACHMENT TO LICENSE AMENDMENT NO.130 FACILITY OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
REMOVE PAGES INSERT PAGES 3.4-11 3.4-11 3.5-5 3.5-5 3.6-21 3.6-21
S/RVs 3.4.4 S.
SURVEILLANCE REQUIREMENTS (continued) i
\\
SURVEILLANCE FREQUENCY SR 3.4.4.2
NOTE--------------------
Valve actuation may be excluded.
Verify each required relief function S/RV 18 months actuates on an actual or simulated 1
automatic initiation signal.
NOTE------------.-------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify each required S/RV relief-mode In accordance actuator strokes when manually actuated.
with the Inservice Testing Program on a STAGGERED TEST BASIS for each valve solenoid GRAND GULF 3.4-11 Amendment No. 440, 130
+
ECCS--Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE-FREQUENCY SR 3.5.1.5
NOTE--------------------
Vessel injection / spray may be excluded.
Verify each ECCS injection / spray subsystem.
18 months actuates on an actual or simulated automatic initiation signal.
NOTE--------------------
Valve actuation may be excluded.
Verify the ADS actuates on an actual or 18 months simulated automatic initiation signal.
NOTE--------------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify each ADS valve relief-mode actuator In accordance strokes when manually actuated.
with the Inservice Testing Program on a STAGGERED TEST BASIS for each valve solenoid SR 3.5.1.8 Verify the ECCS RESPONSE TIME for the HPCS 18 months System is within limits.
GRAND GULF 3.5-5 Amendment No. 430, 130
LLS Valves 3.6.1.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.6.1
NOTE-------------------
Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.
Verify each LLS valve relief-mode In accordance actuator strokes when manually actuated.
with the Inservice Testing Program on a STAGGERED TEST BASIS for each valve solenoid SR 3.6.1.6.2
NOTE-------------------
i Valve actuation may be excluded.
Verify the LLS System actuates on an 18 months actual or simulated automatic initiation signal.
1 i
GRAND GULF 3.6-21 Amendment No. 440, 130