ML20134K765
| ML20134K765 | |
| Person / Time | |
|---|---|
| Site: | 07100018 |
| Issue date: | 03/18/1980 |
| From: | Clay Johnson NAC INTERNATIONAL INC. (FORMERLY NUCLEAR ASSURANCE |
| To: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20134K768 | List: |
| References | |
| 15866, NUDOCS 8508300431 | |
| Download: ML20134K765 (13) | |
Text
?M
'7/
ooIt
~
Nuclear Assurance Corporation 24 Executive Park West
[,Q,! ~ -,
Atlanta. Georgia 30329 DB Cbjp
-JTIONS YeD$Ydfu27oa Rl bVED 71S Honzon Drive GrandJunction Colorado 81501 (303)245-4320 W 9'092%334 5.;,3 75 g; g g gg Weinbergstrasse 9 8001 Zunch. Swtzerland (01)470844 iLS REG.
7eter S7275
' M3S MM. SECTION March 18,1980 t-8 9
Mr. Charles E. MacDonald, Chief 9
$5 ptt 0],, 'O ",g Transportation Certification Branch 2
no Division of Fuel Cycle and Material q///
Y, Safety, NMSS U.S. Nuclear Regulatory Comission
/
Washington, D.C.
20555 4,
p
~~
Dear Mr. MacDonald:
This is in response to your letter dated 3 January 1980 and received on 7 January in which supplementary information was requested on Nuclear Assurances Corporation's (NAC) draft Quality Assurance Manual submitted on 2 July 1979.
The Quality Assurance Manual has now been coordinated within NAC with additions in some areas and revisions made for clarification and is signed. As previously indicated, since NAC does not have manufacturing facilities or testing installations, there are limited details within some procedures. However, all procedures are supplemented with Checklists for use in supplier surveys, by resident or itinerant inspectors on system ele-ments, and for quality audits. As previously indicated, the Checklists are included for information only to indicate implementation plans.
Seven copies of NAC's Quality Assurance Manual are enclosed for NRC review.
In reply to the specific questions in your letter of 3 January, the response is indicated in the attached matrix listing NRC's question and where it is covered in the NAC QA Manual. The response to question #49 is 6
attached to the matrix.
Sincerely,
(
NUCLEAR ASSURANCE CORPORATION h
Q K 072000gg
} [-
1 80032e B
PDR i
k Cha es R. Johnson Vice President & General Manager 15SS6 Co t / rte
~
POSITION DESCRIPTION Position p
Corporate Manager Quality Assurance Reports to President Responsibilities 1.
Establish and maintain a total corporate quality program 2.
Maintain and update the program through corporate policies and procedures and through the Quality Assurance Manual 3.
Through internal and external audits ensure the neintenance of the documented program at NAC and at its suppliers 4.
Ensure documentation and retention of records as required of policy and all regulations for quality related records 5.
Monitor product support operations, maintenance, and customer complaints with periodic reporting to management 6.
Interface with suppliers, customers, and regulatory comission/ agencies on quality related matters 7.
Maintain surveillance of training and retraining of personnel on quality related matters.
~
Education College degree in engineering with formal training in quality I
assurance. An advanced degree is desirable. Should also be a I
registered professional engineer and/or Certified Quality Engineer (CQE) by the American Society for Quality Control.
6 Specific Experience 1.
Must have demonstrated quality assurance administrative ability and performed in this capacity for at least 2 years
(
2.
Must have a minimum of 10 years industrial / business experience 0
with at least a portion in shop related operations and knowledgeable on fabrication operations and processing j
3.
Ability to organize and administer a Corporate quality program
)
in a nuclear related industry 4.
Knowledgeable in and with experience with 10CFR50,10CFR71, ASME 1
Boiler and Pressure Vessel Code QA req)uirements, and related j
documents (RDT, ANS, ANSI, IAEA, etc.
j t
Y Item Number Response - QAM Section & Paragraph No.
49 Position description attached 50 QAM 03.1, Procedure,1.2 & 2.11 QAM 02.1, Procedure, 3 51 QAM 01.1, General, 2nd paragraph 52a QAM 04.1, Procedure, 2.4 52b QAM 10.1, Procedure, 2 QAM 18.1, Procedure, 2 53 QAM 17.1, Procedure, 3 54 QAM 15.1, Procedure, 3.3 55 QAM 15.1, Procedure, 1.9 56 QAM 15.1 Procedure, 1.7 57 QAM 17.1, General, last sentence '
/
QAM 17.1, Procedure, 3.3.8 C
I
(
15t?S6