Forwards Insp Rept 50-293/96-10 on 961123-970111.No Violations Noted
ML20134K587
Person / Time
Site: Pilgrim
Issue date: 02/07/1997
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boulette E
BOSTON EDISON CO.
Shared Package
ML20134K589 List:
References
NUDOCS 9702140100
Download: ML20134K587 (3)


See also: IR 05000293/1996010

Text

--.

._

.-.- . - .

- _.

,

.--

, - -

-

. . . - .

,

i

i

e

t

FEBRUARY 7, 1997

,

i

E. Thomas Boulette, PhD

Senior Vice President - Nuclear

!

Boston Edison Company

j

Pilgrim Nuclear Power Station

600 Rocky Hill Road

1

Plymouth, Massachusetts 02360-5599

SUBJECT: PILGRIM INSPECTION REPORT 50-293/96-10

,

$

Dear Mr. Boulette:

l

On January 11 1997, the NRC completed an inspection at the Pilgrim Nuclear Power

'

i

Station in Plymouth, Massachusetts. The enclosed report presents the results of that

inspection.

4

$

!

During the seven weeks covered by this inspection period, the conduct of activities at the

'

Pilgrim facility was characterized by safe plant operations. However, we continue to

l

identify lower level equipment / material plant conditions that were missed or incorrectly

j

accepted by members of your staff including managers on tours. Although not immediate

q

operability issues, the deficiencies represent degraded conditions. The deficiencies

i

included various things such as pump packing leaks with at least one pump contributing to

.

the overall radwaste in-leakage, dirty screens for the air cooling inlet and on?let ports on

!

the control rod drive pump motors and a broken fastener for a station blackout diesel

i

j

generator cooling water return header support that resulted in a small coolant leak. A

'

i

review of the 1996 management tour results determined that the management tour

]

process yielded mixed results indicating that the process was less than fully effective in

i

fostering and enforcing high management expectations in the field.

i

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

~

and its enclosures will be placed in the NRC Public Document Room (PDR).

Your cooperation with us is appreciated.

Sincerely,

,)

. Richard Conte, C ief

'

Reactor Projects Branch Mo. 5

[\\

Division of Reactor Projects

\\

Docket No.: 50-293

License No.: DPR-35

Enclosure:

Inspection Report 50-293/96-10

9702140100 970207

PDR

ADOCK 05000293

G

PDR

._

m .. . _ _ _ _ _ .

s

I

.

E. Thomas Boulette, PhD

2

cc w/ encl:

L. Olivier, Vice President - Nuclear and Station Director

T. Sullivan, Plant Manager

N. Desmond, Regulatory Relations

D. Tarar.tino, Nuclear information Manager

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

The Honorable Therese Murray

The Honorable Joseph Gallitano

B. Abbanat, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Chairman, Nuclear Matters Committee

Plymouth Civil Defense Director

Paul W. Gromer, Massachusetts Secretary of Energy Resources

James Shaer, Legislative Assistant

J. Fleming

A. Nogee, MASSPIRG

Regional Administrator, FEMA

Office of the Commissioner, Massachusetts Department of Environmental Quality

Engineering

Office of the Attorney General, Commonwealth of Massachusetts

T. Rapone, Massachusetts Executive Office of Public Safety

Chairman, Citizens Urging Responsible Energy

Commonwealth of Massachusetts, SLO Designee

.

_ . _ . . . _ . _ _ _ . _ - _ .

_ . . _ . _ _ _ _ . _ _ . _ .

. _ - - . _ .

> _ -

. .

. . -

- - -

-

-

-

.

.

l

E. Thomas Boulette, PhD

3

Distribution w/ encl:

Region i Docket Room (with concurrences)

'

!

PUBLIC

,

1

Nuclear Safety information Center (NSIC)

D. Screnci, PAO (2)

l

R. Conte, DRP

l

H. Eichenholz, DRP

'

G. Cowan, DRP

1

Distribution w/enci (VIA E-MAIL):

A. Wang, NRR

W. Dean, OEDO

.

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR (RPC)

i

R. Frahm, Jr., NRR (RKF)

i

!

!

i

i

,

!

i

I

1

1

4

i

,

DOCUMENT NAME: G:\\ BRANCH 5\\PIL9610.BEK

To receive e copy of this document, indicate in the bos: 'C" = Copy without ettechment/ enclosure

'E' = Copy with ettechment/ enclosure

'N' = No copy

OFFICE

Rl/DRP

X

Rl/DRP

/

/

n_

, _ _ ,

NAME

R. Laura /, Ig//

R. Conte M/,

l

DATE

1/29/97 ' // W 2/07/97 ' [j"

OFFICIAL RECORD COPY

l

,