ML20134K281
| ML20134K281 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 11/06/1996 |
| From: | Mcmeekin T DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20129K298 | List: |
| References | |
| NUDOCS 9611190049 | |
| Download: ML20134K281 (3) | |
Text
11-I Duke 1%cer Company '
T C Mcutww McGuire Nuclear Generation Department Vice President 12700Hagers Ferry Road (MG01A)
(704)S75-4800 Huntersville, NC28078-8985 (704)875-4809 fax i
'DUKEPOWER
' Noverr.ber 6,.1996
- U. S. Nucloer Regulatory Commission t
l-
~ Attention: Document Control Dessh Washington, D.C.
20555
Subject:
McGuire nuc1 cur Statien i
Docket nos. 50-369 and 50-370 1996 Updated Final Safety Analysis Report Pursuant to 10CFR50.71(e), plcese find enclosed the original and ten copies.of the 1996 Gpdated Final Safoty Analysis Report (UFSAR).
Please note that the Unit 2-EOC10 refueling outage ended May 14, 1996 which is the effective date of this submittal.
NRC Inspection Feports 369/370 96-01 and 369/370 96-04 identified thirtoon tTSAR discrepancies and one SUR discrepr4 v. e.leven of which were self' identified and two NRC identified. The
.2irteen
'diacrepancies have been resolved by the attached t 4 update sub:aittal or by changes to plant procedures or. documents.
Very truly yours, 1
T. C. McNeekin, Vice President
.McGuire Nuclear Station Attachments
]
r h
9611190049 961106 i
s PDR ADOCK 05000369
\\
\\
K PDR e
naea on wrxma
2 U.S. Nuclear Regulatory comm!ssion November 6, 1996 i
Page 2 cc S. D.
Ebneter, Regional Administrator U.
S. Nuclear Regulatory Commission Region II 101 Marietta St., NW Suite 2900 Atlanta, GA 30323 Mr. Victor Nerses, Project Manager Office of Nuclear Reactor Regulation Washington, D.C.
20555 l
Mr. Scott Shaeffer, Senior Resident Inspect'.i-McGuire Nuclear Station I
4 l
U.
S. Nuclear Regulatory Commission November 6, 1996 Page 3 l
T. C. McMeekin, being duly sworn, states that he is Vice President, McGuire Nuclear Generation Department, Duke Power Company: that he is authorized on the part of the said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station Updated Final Safety Analysis Report and that all statements and
)
matter set forth therein are true and correct to the best of his knowledge.
i T.'C. McMeekin, Vice President McGuire Nuclear Station Subscribed and sworn to me this 8 day of November, 1996.
j L
ary[ullic
('
N My commission expires:
A h_6A/E, #9T
-