i- i November 7, 1996 ,

l I

Duke Power Com)any ATTN: Mr. W. 1. McCollum -

Site Vice President l Catawba Site l 4800 Concord Road  !

York. SC 29745-9635

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - CATAWBA i .

Dear Mr. McCollum:

t On September 30. 1996, the NRC staff com)leted the semiannual Plant Performance Review (PPR) of the Catawba luclear Station. The staff conducts l

' these reviews for all operating nuclear power plants to develop an integrated I

, understanding of safety performance. The results are used by regional

! management to facilitate planning and allocation of inspection resources. The  :

l PPR for Catawba involved the participation of all regional technical divisions

and NRR in evaluating inspection results and safety performance information for the period from March 1996 to September 1996. PPRs provide regional 1 management with a current summary of licensee performance and serve as inputs I to the NRC Systematic Assessment of Licensee Performance and senior management

meeting reviews. H l This letter advises you of our planned inspection effort resulting from the

! Catawba PPR review. It is provided in an attempt to minimize the resource impact on your staff and to allow for scheduling conflicts to be resolved in

-advance of inspection dates. The enclosure presents our. inspection plan for- l the-next six months. Specific dates are included for near term inspections.  !

Long term inspection dates will be announced prior ~to the inspections and any scheduling conflicts will be resolved with your staff. The rational or basis for each inspection outside the core inspection program is provided so that you are aware of the reasons for em)hasis in these program areas. Resident I inspections are not listed.due to t1eir ongoing and continuous nature, nor are Region based inspections which accomplish Resident Core Modules to compensate for Resident Inspector absences due to training.

During each NRC inspection planned during this period, specific attention will continue to be given to the verification of selected Updated Final Safety Analysis Re) ort (UFSAR) commitments. Applicable portion (s) of the UFSAR that relate to t1e inspection activities will be reviewed and verification made )

that the UFSAR commitments have been properly implemented into plant l practices. procedures and/or parameters.

l i

kpR D a {

> SE01

2 We will inform you of any changes to the inspection plan. If you have any questions, please contact L.Wert at (404) 331-5506.

Sincerely.

Original signed by:

L. D. Wert. Acting Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-413, 50-414 License Nos. NPF-35. NPF-52

Enclosure:

Inspection Plan cc w/ encl:

M. S. Kitlan Regulatory Compliance Manager Duke Power Company 4800 Concord Road York. SC 29745-9635 Paul R. Newton Legal Department (PB05E)

Duke Power Company 422 South Church Street Charlotte. NC 28242-0001 Robert P. Gruber Executive Director Public Staff - NCUC P. O. Box 29520 Raleigh. NC 27626-0520 J. Michael McGarry. III. Esq.

Winston and Strawn 1400 L Street. NW Washington. D. C. 20005

, North Carolina MPA-1 i Suite 600 P. O. Box 29513 Raleigh NC 27626-0513 l CC w/ encl cont'd: (See page 3) l l

DPC 3 CC w/ encl cont'd Max Batavia Chief Bureau of Radiological Health S. C. Department of Health and Environmental Control 2600 Bull Street Columbia. SC 29201 Richard P. Wilson. Esq.

Assistant Attorney General S. C. Attorney General's Office P. O. Box 11549 Columbia SC 29211 Michael Hirsch Federal Emergency Management Agency 500 C Street. Sw. Room 840 Washington, D. C. 20472 North Carolina Electric Membership Corporation P. O. Box 27306 Raleigh NC 27611 Karen E. Long Assistant Attorney General N. C. Department of Justice P. O. Box 629 Raleigh. NC 27602 Saluda River Electric Cooperative. Inc.

P. O. Box 929 Laurens. SC 29360 Peter R. Harden IV Account Sales Manager Power Systems Field Sales Westinghouse Electric Corporation P. O. Box 7288 Charlotte. NC 28241 County Manager of York County York County Courthouse York. SC 29745 l Piedmont Municipal Power Agency 121 Village Drive Greer. SC 29651 CC w/ encl cont'd: (See page 4) l l

I DPC 4 CC w/ enc 1 cont'd:

G. A. Copp Licensing - EC050 Duke Power Company P. O. Box 1006 Charlotte. NC 28201-1006 T. Richard Puryear Owners Group North Carolina Electric Membership Corporation 4800 Concord Road York. SC 29745 l Distribution w/cncl:

P. Tamm. NRR R. Carroll. RII )

L. Wert. RII i N. Economos. RII -l R. Baldwin, RII G. Hallstrom. RII NRC Resident Inspector U. S. Nuclear Regulatory Commission 4830 Concord Road York. SC 29745 nrrrrr pit opp art. ops _ pir nps ptr ons err.nps pi t -nps , l s-NAME pudisail 7lesg TPe q

CCasto dy' KBarr p-HCh istensen PFredrickson l )

DATE 10_ / 7,7 / % 10 / 96 10 /hO / 96 13l N / % 10 /D / % 19:,L / 96 COPY 7 [tEb NO [E[ N0 ff$ N0 h NO h NO [fES) NO l OttiLIAL KtLUC) LUFF V DULUMLhl N#1L: G;\LAIFFKl).96 '

I l

I I

i l

l

1 of 3 CATAWBA INSPECTION PLAN INSPECTION PROCEDURE / NUMBER OF PLANNED INSPECTION TEMPORARY INSTRUCTION TITLE /[ PROGRAM AREA] INSPECTORS DATES TYPE OF INSPECTION - COMMENTS IP 71714 COLD WEATHER PREPARATIONS 1 10/20/96-11/30/96 Regional Initiative - Issues

[0PERATIONS - DRP 2210] from McGuire IP 40500 EFFECTIVENESS OF PROBLEM 1 TBD Core - Operations self-IDENTIFICATION. RESOLUTION visiting assessment AND PREVENTION RI

[0PERATIONS - DRP 22101 MAINTENANCE IMPLEMENTATION 1 5/12-16/97 Regional Initiative -

IP 62700 [ MAINTENANCE - MNT 2310] Electrical switch gear and breaker maintenance (Recent Industry Issue)

MAINTENANCE IMPLEMENTATION 1 5/19-23/97 Regional Initiative -

IP 62700 [ MAINTENANCE - MNT 2310] Maintenance and testing of air operated / solenoid valves MAINTENANCE RULE 5 2/10-14/97 Regional Initiative - Team IP 62706 [ MAINTENANCE - MNT 2310] Inspection IP 73753 INSERVICE INSPECTION 1 4/7-11/97 Core

[ MAINTENANCE - MNT 2310]

ENGINEERING 2 1/6-17/97 Core - Review of engineering IP 37550 calculations, modifications,

[ ENGINEERING - ENG 2320]

and self-assessments ENCLOSURE

(TABLE. CAT cont'd) 2 of 3 INSPECTION PROCEDURE / NUMBER OF PLANNED INSPECTION TEMPORARY INSTRUCTION TITLE /[ PROGRAM AREA] INSPECTORS DATES TYPE OF INSPECTION - COMMENTS FOLLOWUP - ENGINEERING 1 1/6-10/97 Regional Initiative -

IP 92903 [ ENGINEERING - SI 2350] Followup on service water pond issues PROCUREMENT PROGRAM 1 1/6-17/97 Regional Initiative -

IP 38701 [ ENGINEERING - ENG 2320] Material Upgrade Program OCCUPATIONAL EXPOSURE 1 1/27-31/97 Core IP 83750 [ PLANT SUPPORT - PS 2340] 2/10-14/97 RADI0 ACTIVE WASTE SYSTEMS. 1 1/27-31/97 Core - (IP 84750 & 86750 to IP 84750 WATER CHEMISTRY. 2/10-14/97 be performed by same CONFIRMATORY MEASUREMENTS. inspector)

AND ENVIRONMENTAL MONITORING

[ PLANT SUPPORT - PS 2340]

IP 86750 SOLID RADI0 ACTIVE WASTE 1 1/27-31/97 Core - (IP 84750 & 86750 to (TI 2515/133) HANAGEMENT AND 2/10-14/97 be performed by same TRANSPORTATION OF inspector)

RADI0 ACTIVE MATERIALS

[ PLANT SUPPORT - PS 2340]

IP 82701 OPERATIONAL STATUS OF THE 1 1/27-31/97 Core EP PROGRAM

[ PLANT SUPPORT - PS 2340]

IP 81700 PHYSICAL SECURITY PROGRAM 1 1/6-10/97 Core - Review of security

[ PLANT SUPPORT - SI 2350] 3/17-20/97 plans and audits . corrective actions. vital area access control PA detection equipment, management support and effectiveness ENCLOSURE t

(TABLE. CAT cont *d) 3 of 3 INSPECTION PROCEDURE / NUMBER OF PLANNED INSPECTION TEMPORARY INSTRUCTION TITLE /[ PROGRAM AREA] INSPECTORS DATES TYPE OF INSPECTION - COMMENTS OPERATIONAL SAFEGUARDS 7 1/20-24/97 Regional Initiative - OSRE to RESPONSE EVALUATION (OSRE) evaluate ability to respond

[ PLANT SUPPORT - SI 2350] to external design basis threat IP 64704 FIRE PROTECTION PROGRAM 1 1/20-24/97 Regional Initiative - IP

[ PLANT SUPPORT - SI 2350] being performeu each SALP cycle IP 71001 LICENSED OPERATOR REQUAL 2 10/21-25/96 Core PROGRAM EVALUATION

[0PERATIONS - OLHP 2330]

TI 2515-109 SAFETY-RELATED MOV TESTING 2 1/27/97-2/7/97 Regional Initiative - Closure AND SURVEILLANCE of GL 89-10

[ ENGINEERING - SI 2350]

ENCLOSURE e