ML20134J675

From kanterella
Jump to navigation Jump to search
Advises of NRC Planned Insp Effort Resulting from Plant PPR Review on 961003.Details of Insp Plan for Next 6 Months Encl
ML20134J675
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/07/1996
From: Shymlock M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Campbell W
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9611150335
Download: ML20134J675 (5)


Text

_ _ _ _ _ . . _ _ . _ _ _ _ . _ .__ _ _ . . . _ _ _ _ _ ._ . . . . _ _ _ _ .

! . i

. r November 7,1996 i

I i

) Carolina Power & Light Company

, ATTN: Mr. W. R. Campbell i Vice President Brunswick Steam Electric Plant

, P. O. Box 10429 l

Southport, NC 28461

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - BRUNSWICK l

Dear Mr. Campbell:

l On October 3,19%, the NRC staff completed the semiannual Plant Performance

! Review (PPR) of Brunswick Nuclear Plant. The staff conducts these reviews for i L all operating nuclear mwer plants to develop an integrated understanding of I j safety performance. T1e results are used by NRC management to facilitate

! planning and allocation of-inspection resources. The PPR for Brunswick involved the participation of all technical divisions in evaluating inspection i results and safety wrformance information for the period March 1996 to

September 1996. PPts provide NRC management with a current summary of I licensee wrformance and serve as inputs to the NRC Systematic Assessment of l Licensee )erformance (SALP) and Senior. Management Meeting (SMH) reviews.

i

! This letter advises'you of our planned inspection effort resulting from the Brunswick PPR review. It is provided to minimize the resource impact un your i staff and to allow for scheduling conflicts and personnel availability to be l resolved in advance of inspector arrival onsite. The enclosure details our

! inspection plan for the next 6 months. The rationale or basis for each.

! inspection outside the core inspection program is provided so that you are

, aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature, nor are region

based inspections which accomplish Resident Core Modules to compensate for i Resident Inspector absences due to training.

l' During each NRC inspection planned during this period, specific attention will i be given to the verification of selected UFSAR commitments. Applicable

! portion (s) of the UFSAR that relate to the inspection activities will' be i reviewed and verification made that the UFSAR commitments have been properly i implemented into plant practices, procedures and/or parameters. The goal is to determine the accuracy of the UFSAR regarding existing plant practices and i

conditions by providing specific attention to the UFSAR when performing

, various reactor inspections. Inspectors will not'be judging the overall

, completeness of the UFSAR: rather, the inspections will focus on identifying differences between the UFSAR description and the plant.

4 150080 i i \  !

9611150335 9d1107 I

, PDR ADOCK 05000324

e pm

-go/ .

i 4

CP&L 2 1

We will innrm you of any changes to the inspection plan. If you have any questions, picase contact me at 404 331 5535.

Sincerely,

, WeignedbyM.B.IRiymdoek -

Milton B. Shymlock, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-325, 50 324 ,

License Nos. DPR-71 and DPR-62

Enclosure:

Inspection Plan i

cc w/ encl:

W. Levis, Director Site Operations l Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 R. P. Lopriore l Plant Manager i Brunswick Steam Electric Plant Carolina Power & Light Company P. O. Box 10429 Southport, NC 28461 J. Cowan, Vice President Operations & Environmental Support MS OHS 7 Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602 Gerald D. Hicks Manager - Regulatory Affairs Carolina Power & Light Company P. O. Box 10429 Southport, NC 28461 W. D. Johnson, Vice President and Senior Counsel Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602 (cc w/ enc 1 cont'd See page 3)

=a---

-w- 4 *_r.=.- -

A &.-,r. A n-6 g 4.A _ :s a-+- -

.,as ee-M'm u.m i

CP&L 3 (cc w/ encl cont'd)

Dayne H. Brown Director Division of Radiation Protection artment of Environmental N.Health C. Dep& Natural Resources P. O. Box 27687 i

l. Raleigh, NC 27611 768/

Karen E. Long Assistant Attorney General State of North Carolina P. O. Box 629 Raleigh, NC 27602 Robert P. Gruber Executive Director Public Staff - NCUC P. O. Box 29520 Raleigh, NC 27626.r520 i

Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Jerry W. Jones, Chairman Brunswick County Board of i Commissioners  ;

P. O. Box 249 l Bolvia, NC 28422 l

! Dan E. Summers j Emergency Management Coordinator New Hanover County Department of l Emergency Management l P. O. Box 1525 l Wilmington, NC 28402  !

William H. Crowe, Mayor City of Southport ,

l 201 East Moore Street  !

L Southport, NC 28461 Distribution w/ encl: (See page 4)

I

l CP&L 4 Distribution w/ encl:

M. Shymlock, RII D. Trimble, NRR M. N. Miller, RII R. Aiello, RII  :

i G. A. Hallstrom, RII PUBLIC l

~

NRC Resident Inspector U.S. Nuclear Regulatory Commission 6473 River Road, SE Southport. NC 28461 I

l j

l i

l OFFICE Rff DRS / Rff:DRS Rff:DRS Ril ORS _ Rff:DRS Rff ORS SIGNATURE ph [% / /

NANE rr CCasto CChristensen PFu: erickson Teeblesf# AGib DATE lil k/% 11 / h / 96 1 k-A,[ / 96 , ,l/96 11_// /% 1 \/%

COPY? [YES/ NO (($ NO [ YES) N0 fYEY N0 f ES) i ' NO /YES 'NO ,

v su v v v l OrrfCr Rif oRP Rit : Imp / Rfth RfhP -

$1GNATURE h f

- Wst . .n , n. s. ,E,-

DATE 11 / l / 96 11 / Y/ 96 1/ \ 96 / \/ 96 11 / / 96 11 / / 96 COPY? YES NO YES NO ' YES E -' YES INO YES NO YES NO Utt1LIX RECORD COPY 00LUMLN1 NAMi. G:\BRU\PPR\dQVVK\4WPVK.LTR

BRUNSWICK INSPECTION PLAN IP - Inspection Procedure TI - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE / NUMER OF PLANNED TYPE OF INSPECTION -

PROGRAN AREA INSPECTORS INSPECTION C000ENTS DATES IP 73753 ISI Observation of Work 1 10/15-18/96 Core Inspection IP 73755 ISI Data / Evaluation Initiative - Safety Issues Review (U1 Core Shroud)

IP 62700 Surveillance / Maintenance 1 3/3-7/97 Initiative Inspection - Safety Observation (Reactor Trip Issues Breakers)

IP 37550 Engineering Team (2 weeks) 5 2/3-14/97 Core / Team Inspection IP 37550 USI A 46 (Seismic Qual. 1 10/21-25/96 Initiative Inspection Implementation - Outage)

IP 37550 Waterhammer Inspection 1 10/21-25/96 Initiative Inspection (Outage)

IP 83750 Occupational Radiation 1 11/4-8/96 Initiative Inspection Exposure 3/10-14/97 Core Inspection 3/17-21/97 Core Inspection IP 84750/ Radwaste Treatment, 1 12/2-6/96 Core Inspection IP 86750/ Effluent, and Monitoring 1/6-10/97 TI 2525/133 2/24-28/97 IP 82701 Emergency Preparedness 1 1/6-10/97 Core Inspection Program IP 81700/ Security Access 1 11/18-22/96 Initiative Inspection TI 2525/127 Authorization - Corporate and all Nuclear sites IP 81700 Physical Security 1 3/3-7/97 Core Inspection ENCLOSURE