Forwards Insp Repts 50-348/96-09 & 50-364/96-09 on 960901-12 & Nov.Violations Represent Two Separate Events Involving Sys Alignment Errors by non-licensed Operators
ML20134J411
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/08/1996
From: Skinner H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20134J413 List:
References
EA-96-410, NUDOCS 9611150198
Download: ML20134J411 (5)


See also: IR 05000348/1996009

Text

.

.

.. -

.

!

'.

i

November 8, 1996

.

-

,

l

1

l-

!

..

EA 96-410

<

,

Southern Nuclear Operating Company, Inc.

ATTN: Mr. D. N. Morey

i

Vice President

l

Farley Project

i

P. O. Box 1295

l

Birmingham, AL 35201-1295

i

i

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-348/96-09 AND 50-364/96-09.

'

AND NOTICE OF VIOLATION

l

Dear Mr. Morey:

On October 12, 1996, the NRC completed an inspection at your Farley Nuclear

Plant (FNP) facility. The enclosed report presents the results of this

,

inspection,

1

During the six-week period covered by this ins)ection period, your conduct of

l

activities at FNP was generally characterized )y safety-conscious operations,

'

sound engineering and maintenance practices', and careful radiological work

l

controls. However, a violation of NRC requirements was identified. We are

'

particularly concerned about this violation because it represents two separate

events involving system alignment errors by non-licensed operators.

These

-

errors resulted in the inoperability of the IB emergency diesel generator, and

j

caused two plant transients associated with the Unit 2 letdown system.

,

The violation is cited in the enclosed Notice of Violation (Notice), and the

l

specific circumstances surrounding it is described in detail in the enclosed

.

report.

Please note that you are required to respond to this letter and.

should follow the instructions specified in the enclosed Notice when preparing

your response. The NRC will use your response, in part, to determine whether

l

further enforcement action is necessary to ensure compliance with regulatory

1

requirements.

In your October 25. 1996 reply to the Notice of Violation ter NRC Inspection

Report numbers 50-348/96-10 and 50-364/96-10, you committed to provide to NRC

'

a supplemental response by December 24. 1996, to address the additional long

discrepancies discussed in Inspection Report numbers gects of the pipe support

term corrective actions regarding the 3rogrammatic as

0-348/96-07 and 50

i

364/%-07. You are requested to address in the supplemental response the

j

i

additional examples of support discrepancies discussed in Paragraph E1.2 of

the attached inspection report. We are also concerned with the adequacy of

your structural welding inspection program, specifically the fact that the

i

number of weld discrepancies identified during recent NRC inspections.

indicates that there may be other similar deficiencies-in your welding

program.

,

>

!

9611150198 961508

l

PDR

ADOCK 05000348

l

)

G

PDR

!

i

.

,

-

- --

.-_

-

. - - ~

. .. -

-

-

-

. - . .

-

-

,

SNC

2-

!'

In addition, two apparent violations were identified and are being considered

for escalated enforcement action in accordance with the " General Statement of

.

Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy),

NUREG-1600. These apparent violations'cor.cern:

1) Failure to install Kaowool

)

fire barriers as required by your Fire Protection Program, and 2) Programmatic

(

breakdown of the Kaowool independent inspection program. Accordingly, no

_

3

Notice of Violation is presently being issued for these inspection findings.

In addition please be advised that tha rumber and characterization of

l

apparent violations described in the enclosed inspection report may change as

!

a result of further NRC review.

A predecisional enforcement conference to discuss these apparent violations

has been scheduled for November 18, 1996. The decision to hold a

predecisional enforcement conference does not mean that the NRC has determined

that a violation has occurred or that enforcement action will be taken. This

conference is being held to obtain information to enable the NRC to make an

enforcement decision. such as a comman understanding of the facts, root

causes, missed opportunities to identify the apparent violations sooner,

corrective actions, significance of the issues and the need for lasting and

effective corrective action.

In addition, this is an opportunity for you to

point out any errors in our inspection report and for you to provide any

information concerning your perspectives on 1) the severity of the violations.

2) the application of the factors that the NRC considers when it determines

the amount of a civil penalty that may be assessed in accordance with Section

VI.B.2 of the Enforcement Policy, and 3) any other application of the Enforce-

ment Policy to this case, including the exercise of discretion in accordance

with Section VII.

You will be advised by separate correspondence of the results of our

deliberations on this matter.

No response regarding these apparent violations

is required at this time,

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.

Sincerely.

(Original signed by Pierce H. Skinner)

Pierce H. Skinner. Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos.:

50-348 and 50-364

i

License Nos.:

NPF-2 and NPF-8

Enclosures: 1.

Notice of Violation

!

2.

Inspection Report 50-348/96-09

and 50-364/96-09

cc w/encls:

(See page 3)

.

'

i

.

-

_. -

.

.

-

.

.

-

_

. _ _ _

. . _

_

l

.-

-

'

SNC

3-

-

cc w/encls:

M. J. Ajluni

.

Licensing Manager

Southern Nuclear Operating

Company. Inc.

P. 0. Box 1295

l

.B1rmingham, AL 35201-1295

'

R. D. Hill, Jr.

General Manager, Farley Plant

!

Southern Nuclear Operating

!

Company Inc.

i

P. O. Box 470

!

Ashford, AL 36312

i

G. S. Waymire, Su)ervisor

L

Safety- Audit and Engineering Review

l

Farley Nuclear Plant

P. O. Box 470

3

Ashford, AL 36312

>

J. D. Woodard

'

.

Executive Vice President

' Southern Nuclear.0perating

Com)any. Inc.

-

l

P. O. Box 1295

!

l

Birmingham. AL- 35201

!

l

,

1

State Health Officer

Alabama Department of Public Health

!

434 Monroe Street

Montgomery, AL 36130-1701

M. Stanford Blanton

Balch and Bingham Law Firm

P. 0. Box 306

.

1710 Sisth Avenue North

Birmingham AL 35201

l

~ Chairman

l

l

Houston County Commission

l

Dbtan AL

302

l

Distribution w/encls:

J. Zimmerman.-NRR

l

'

l

P.. Skinner. RII

G.A. Hallstrom. RII

4

R.W. Wright, RII

'

PUBLIC

'

Distribution w/encls cont'd:

(See page 4)

,

,

I

,

.

.

.

s

SNC

4

Distribution w/encls:

Continued

'NRC Resident. Inspector

U.S. Nuclear Regulatory Commission

7388 N. State Highway 95

Columbia..AL 36319

i

!

'

r

4

l

l

l

SEND TO PUBLIC DOCUMENT ROOM? A

YES

NO

OFFICE

RI!:DSP

hf

RII:0RP

RII:0RP

RII:DRS

RII:DRS

([

[r

SIGNATURE

NAME

RWWright:dka

PHSkinner

TMRoss

JHBartley

WKleinsorge

RCChou

DATE

11 /

/ 96

11 /

/%

11 /

/ 96

11 /

/ 96

11 /s / 96

11_/ f/96

COPY?

YES

NO

YES

NO

YES

NO

YES

NO

($ ) NO

[YEM

N0

orrftr

Rif 0Rs

Rif-ors

off DRs

$1GNATURE

[

p

NAME

JJLenahan

JJBlake

MEErnestes

DAtt

11 / E / %

11_/ [ / 96

11 L N / 96

11 /

/ 96

11 /

/ 96

11 /

/%

COPY?

[YEs

NO

. VESl

NO

' (ES)

NO

YES

NO

YES

NO

YES

NO -

UFilCIA htLURD LUFY

00CUMLN1 NAM..

A:\\lR90-09.iNP

j

11-08-19 % [0:05M

FROM

Tb

-. - --

-

- ..

i 404 331 5789

P.02

.

%

SNC

4

-

)istributien w/encis: Continued

WRC Resident Inspector

U.S. Nuclear Regulatory Commission

7388 N. State Highway 95

,

Columbia. AL 36319

l

l

\\

.

l

i

l

MND TD PtXYf DDCJF ROOM'

vE5

NO

CFFICE

R!!:DRP

RII:DPP

R!!:02P

,

RII DRP ,

R11 DR$, ,

R11:083

h

s!GhATURE

,

kAnt

R4right:dha

PH5kinner

Teos

JH8ar

j

nsorge

ACChou

DATE

11 /

7M

11 /

/M

11 / [/M

11/b/H

!!! / $ / M

11 /

/ 96

COPYT

vt3

NO

YE5

NO

S No

?ts

(NQ)

Yt3

2

Yt3

40

rwrfer

aff noe

n+ =4

ett.nas

sichA v t

NAME

JAeneben

she

NKrnestes

CATt

11 /

/M

11 / 8 / M

11.1 8/M

11 /

/M

11 /

/M

11 /

/M

corn

vos

no

vts

no

/TtD

e

vts

e

vts

no

vts

no

UPPR A<4 MLWKU WP1

VA,URLN 6 N8F ; . A;\\lR/b-Q9. PNP

TOTAL P.02

.j