ML20134J261

From kanterella
Jump to navigation Jump to search
Advises That Requirements of Generic Ltr 85-12 Complete, Based on Completion of TMI Action Item II.K.3.5 Re Automatic Trip of Reactor Coolant Pumps & NRC Approval of Schedule for TMI Action Item I.C.1 Re Emergency Operating Procedures
ML20134J261
Person / Time
Site: Yankee Rowe
Issue date: 08/23/1985
From: Papanic G
YANKEE ATOMIC ELECTRIC CO.
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
TASK-1.C.1, TASK-2.K.3.05, TASK-TM FYR-85-90, GL-85-12, NUDOCS 8508290226
Download: ML20134J261 (2)


Text

s Te'epho"e (* ") * ' -* '00 YANKEE. ATOMIC ELECTRIC COMPANY TH0( 710-380-7619 ll. 1671 Worcester Road, Framingham, Massachusetts 01701 d: .ijy

.m.

' i t .l J a;ll e ' /

____.- 2.C.2.1 FYR 85-90 August 23, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr. John A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing

References:

(a) License No. DPR-3 (Docket No. 50-29)

(b) YAEC Letter to USERC, dated August 1, 1984 (c) YAEC Letter to USNRC, dated July 27, 1984 (d) USNRC Letter to YAEC, dated January 31, 1985 (e) USNRC Letter to YAEC, dated March 26, 1985 (f) USNRC Letter to YAEC, dated July 5, 1985 (g) YAEC Letter to USNRC, dated August 15, 1985

Subject:

Implementation of TMI Action Item II.K.3.5, " Automatic Trip of Reactor Coolant Pumps" (Generic Letter No. 85-12)

Dear Sir:

Yankee chose to perform a plant-specific analysis for TMI Action Item II.K.3.5. That analysis was submitted to the USNRC in August 1984

[ Reference (b)]. The USNRC reviewed this report against Generic Letters 83-10 (a), (b), (c), (d) and (e), and deteamined that additional information was needed to complete their review [ Reference (d)]. Yankee's response to these questions were discussed in a meeting with the USNRC staff on March 13, 1985. Questions not resolved in the meeting or requiring a written response were recently provided to the USNRC [ Reference (g)].

Concurrent with these actions, Yankee submitted a schedule for TMI Action Item I.C.1, "The Upgrade of Emergency Operating Procedures" { Reference (c)].

This schedule requires Yankee's emergency operating procedures to be upgraded prior to the startup of Cycle 19. The USNRC concurred with this schedule in July 1985 [ Reference (f)].

~

8508290226 850823 PDR ADOCK 05000029 p PDR d

'l0

a a United States Nuclear Regulatory Comission August 23, 1985 Attention: Mr. John A. Zwolinski Page 2 In sumary, Yankee has completed TMI Action Item II.K.3.5 and has a USNRC approved schedule for Item I.C.1. Therefore, Yankee has completed all the

requirements of this generic letter.

Very truly yours, George apanic, J8.

Senior Project Engineer Licensing GP/glw l