ML20134H693

From kanterella
Jump to navigation Jump to search

Forwards Facility Ol/Ts Change Implementation Sheet from Duke Power Co Signifying Implementation of OL Amend 151 on 960923
ML20134H693
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 11/13/1996
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-M90566, NUDOCS 9611140228
Download: ML20134H693 (2)


Text

.

~'

nuso p-4 UNITED STATES g

j NUCLEAR REGULATORY COMMISSION i

WASHINGTON, D.C. 200tuMoot

/4

.i November 13, 1996 1

4 MEMORANDUM FOR: Docket File FROM:

Peter S. Tam, Senior Project Manager Project Directorate II-2 p

3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

SUBJECT:

CATAWBA UNIT 1 - IMPLEMENTATION OF AMENDMENT 151 TO OPERATING LICENSE (TAC M90566)

The attached page, transmitted by tax from Duke Power Company, signifies the implementation of operating license Amendments 151 on September 23, 1996.

Docket Number 50-413 Distribution Docket file PUBLIC H. Berkow I

?

Deot L i NRC RICENTS COPY oon 9611140228 961113 PDR ADOCK 05000413 P

PDR

_ _....... - _TUE 17:19 FAI 8038313191... _ _ _ _

. f 11/12/96 REGULATORY COMPLIANCE

@ 002 s

}

Compliance Functional Area Manu-l 3.3 POLITS i

p Rev.1 i

3 Page 1 of 2 I

FACILITY OPERATING LICENSE / TECHNICAL SPECIFICATION CHANGE j

IMPLEMENTATION SHEET i

yCNS O MNS O ONS UNIT NO. W 1 0 2 0 3

\\

Tz,z-t;r 3,3-4 M,S TS NO. rug. 2., S,// //, /,,9,/,jrH, Lt-tiBM45DATE RECEIVED B[29[9(,

AMENDMENT. NO.

/5 /

SITE PLAN NO(S).

1.

IMPLEMENTATION DATES A.

NRC EFFECTIVE DATE (From NRC letter): _ 9/2.Kh/,

B.

STATION IMPLEMENTATION (Grace Period - 2 WEEKS): [&hD/kcM9

}

2.

PLANT NOTIFICATION wiwr l

A. M/

in E-Mail Distribution; Include Site Technical Contacts B. X /

-implementation items j

3.

RGC TECHNICAL CONTENT REVIEW CRITERIA I

A.

All Discrepancies Have Been Resolved Via NRC Interface, j

[

B.

No Inadvertent Changes Were Made To TS Sheets Involved.

El C.

TS Change Was Issued As. uested By DPC.

TECHNICAL REVIEWER:

o!f6' (List Di On Attaic

)

/

Date CHECKED BY:

M,_

if /. 74 (List Diser On Atisched P I

Date f

4.

I ALL CO TIVE A NS FROM ASSIGNED PIP COMPLETED VERIFIED BY:

fys A

/I [r

[

atory Complian

' Date l

S.

FINALIMPLEMENTATION APPROVAL i

HS cceaA ms i

Manager. Regulatory Codpl fand.

Date n uL e dazuL Yokla Markger, $afety Assumnce Dati i