Forwards Insp Repts 50-313/96-06 & 50-368/96-06 on 960818- 0928 & Notice of Violation.Violations of Concern Because Since Introduction of Svc Air Into RCS at Reduced Inventory Caused Erroneous Level
ML20134H399
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/12/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY CORP.
Shared Package
ML20134H402 List:
References
NUDOCS 9611140087
Download: ML20134H399 (5)


See also: IR 05000313/1996006

Text

.

- , . . - . .-

-_. -_.

. - ~ . . . - . . . - - . - - ~ . -

-.~.-.---

. ....-- _.,._

-

..

I.

d"M

UNITED STATE S

,

[ ,,

.\\

NUCLEAR REGULATORY COMMISSION

h

[

/

REcioN iv

l

$ \\Mh[J/

6M R v AN PL AZA DmVf, SUIT E 400

t

't .

AR LINGToN, TEXA5 760118064

l

NOV I 21996

  • ""

r

C. R Hutchinson, Vice President Operations

!

Arkansas Nuclear One

l

Entergy Operations, Inc.

l

1448 S.R. 333

Russellville, Arkansas 72801-0967

!

SUBJECT: NRC INSPECTION REPORT 50-313/96-06:50-368/96-06 AND NOTICE

OF VIOLATION

Dear Mr. Hutchinson:

An NRC inspection was conducted August 18 through September 28,1996, at your

Arkansas Nuclear One, Units 1 and 2 reactor f acilities. The enclosed report presents the

l

scope and results of that inspection.

i

l

During the 6-week period covered by this inspection report, your conduct of activities was

j

generally characterized by safety conscious operations, sound engineering, maintenance

activitias, and careful radiological controls. Two Notices of Violation of NRC requirements

were identified. The first violation is of concern since the introduction of service air into

the reactor coolant system at reduced inventory caused an erroneous level and almost

caused operators to remove water inventory from the reactor coolant system. The second

violation involves a hydrogen burn in the pressurizer relief valve tailpipes due to welding

I

,

activities. This is of concern because programmatic requirements which could have

prevented the event were not implemented. These violations were considered for

enforcement discretion; however, they are being cited to emphasize the importance of

controlling and coordinating work activities during sensitive outage periods.

l

These violations are cited in the enclosed Notice of Violation (Notice) and the

l

circumstances surrounding the violations are described in detailin the enclosed report.

Please note that you are required to respond to this letter and should follow the

instructions specified in the enclosed Notice when preparing your response. The NRC will

use your response, in part, to ' determine whether further enforcement action is necessary

to ensure compliance with regulatory requirements.

!

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document

Room (PDR). To the extent possible, your response should not include any personal

privacy, proprietary, or safeguards information so that it can be placed in the PDR without

(

redaction.

i

,

"

9611140087 961112

PDR

ADOCK 05000313

G

PDR

i

l

'

.

-

.

_

____ _ _ _ _ _ - _ - _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

___-___

_____

.

.

<

-2-

Entergy Operations, Inc.

Shou;d you have any questions concerning this inspection, we will be pleased to discuss

them with you.

.

Sincerely,

J. E. Dyer, Director

Division of Reactor Projects

Docket Nos.: 50-313

50-368

License Nos.. DPR-51

h

NPF-6

Enclosures:

1. Notice of Violation

2. NRC inspection Report

50-313/96-06:50-368/96-06

cc w/ enclosures:

Executive Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President

Operations Support

Entergy Orarations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286

Manager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

Power

12300Twinbrook Parkway, Suite 330

Rockville, Maryland 20852

County Judge of Pope County

Pope County Courthouse

Russellville, Arkansas 72801

'i

4

.

r

.

.

.

.

Entergy Operations, Inc.

-4-

NOV 121996

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Richard Correia (RPC)

,

E-Mail report to Ronald Frahm, Jr. (RKF)

bec to DMB (IE01)

,

bec distrib. by RIV:

L. J. Callan

Resident inspector

DRP Director

MIS System

1

Branch Chief (DRP/C)

RIV File

Project Engineer (DRP/C)

DRS-PSB

Branch Chief (DRP\\TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

,

DOCUMENT NAME: R:\\_ANO\\AN606RP.JFM

To receive copy of document. Indicate in box: "C" = Copy ethout enclosures T = Copy with enclosures"N" a No copy

RJ)/,:Rf)

C

C:DRP/C

N

D:DRP

N

i

_ ,

(bf"

EECollins

JEDyer M

,

10/[y9D

10/% 96

1p////96

'

OFFICIAL RECORD COPY

.

k

.

Enter 0y Operations, Inc.

-4-

NOV I 21996

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Richard Correia (RPC)

E-Mail report to Ronald Frahm, Jr. (RKF)

bec to DMB (IE01)

bcc distrib. by RIV:

J

L. J. Callan

Resident inspector

DRP Director

MIS System

Branch Chief (DRP/C)

RIV File

Project Engineer (DRP/C)

DRS-PSB

Branch Chief (DRP\\TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

i

i

DOCUMENT NAME: R:\\_ANO\\AN606RP.JFM

To receive copy of document, Indicate in box: "C" = Copy witnout enclosures "E" = Copy with enclosures"N" = No copy

RI)/,:RC

C

C:DRP/C

N

D:DRP

N

_ ,

dFf#ef"

EECollins

JEDyer M

10/[y9'6)

10f[)96

1p////96

OFFICIAL RECORD COPY