ML20134H373

From kanterella
Jump to navigation Jump to search
Returns ASLB Documents Used in Preparing Response to ASLB 850805 Memorandum.Related Correspondence.W/O Encl
ML20134H373
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 08/23/1985
From: Berry G
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Bright G, Carpenter J, Kelley J
Atomic Safety and Licensing Board Panel
References
CON-#385-338 OL, NUDOCS 8508280388
Download: ML20134H373 (1)


Text

3~ N o

% Dpor,g f o' cog [o

,o, . UtJITED STATES

'q 3 o NUCLEAR REGULATORY COMMISSION DZKEIED WASHINGTON, D. C. 20555 U$NRC

/

'85 AUG 26 P1:28 August 23, 1985 LFFn:E N :E'Lnti' 00CKETihG A SEPVICl-BRANCH James L. Kelley, Chairman Mr. Glen 0. Bright Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Comission U.S. Nuclear Regulatory Comission Washington, DC 20555 Washington, DC 20555 Dr. James H. Carpenter Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, DC 20555 In the Matter of Carolina Power and Light Company and North Carolina Eastern Municipal Power Agency (Shearon Harris Nuclear Power Plant, Units 1 and 2)

Docket Nos. 50-400 OL and 50 401 OL

Dear Administrative Judges:

The NRC Staff is herewith returning to the Atomic Safety and Licensing Board the documents made available by the Board to the Staff for use in preparing the "NRC Staff Response to the Licensing Board's August 5, 1985 Memorandum."

S werely,

/

< I Gregory erry Counsel C Staff

Enclosures:

As stated cc w/o encls.: Service List MS2Seau G

  • E*iho b