Text
s
November 1, 1996
,
e
-
.
,
Mr. Charles H. Cruse
Vice President - Nuclear Energy
Baltimore Gas and Electric Company
Calvert Cliffs Nuclear Power Plant
1650 Calvert Cliffs Parkway
Lusby, MD 20657 -4702
'
SUBJECT:
COMBINED NRC REGION I INSPECTION REPORT NOS. 50-317/96-09 AND
50-318/96-09 AND NOTICE OF VIOLATION
Dear Mr. Cruse:
This report transmits the findings of the safety inspection conducted by NRC inspectors at
j
the Calvert Cliffs Nuclear Power Plant from August 12 to September 6,1996. The
enclosed report presents the results of that inspection. At the conclusion of the
inspection, these findings were discussed with Mr. P. G. Chabot of your staff.
Areas examined during this inspection are described in the NRC Region I inspection Report
which is enclosed with this letter and were selected in order to ensure that your facility is
operated with due regard for the public health and safety. Within these areas, the
inspection consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspectors. Overall, the NRC has
concluded that your facility was operated in a safe manner. However, a weakness was
observed in the area of management controls applied to the engineering design change,
i
modification, and maintenance programs.
Based on the results of this inspection, the NRC has determined that one violation of NRC
requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice)
and the circumstances surrounding it are described in detail in the attached inspection
report.
.
i
The violation pertains to an unauthorized modification to the Auxiliary Feedwater pump
l
base guide blocks. These guide blocks were changed from welded to an unwelded design
affecting the seismic qualification of the equipment. This modification was implemented
l
without a proper design change review and/or approval.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. In your response, you should document
the specific actions taken and include any additional actions you plan to prevent
recurrence. Your response may reference or include previous docketed correspondence, if
the correspondence adequately addresses the required response. After reviewing your
j
response to this Notice, including your proposed corrective actions and the results of
q
future inspections, the NRC will determine whether further NRC enforcement action is
,t
i
necessary to ensure compliance with NRC regulatory requirements.
I')
l
120g37
-
-
9611130313 961101
ADOCK 05000317
G
-
-.
- - . . - - - .
. - . - . _ _ _ . ,--.
- - - - - - .
. . - . .
-
-.-
.
i
'
-
.
_
Charles H. Cruse
2
j
'
.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
,
!
its enclosure (s), and your response will be placed in the NRC Public Document Room
'
(PDR). To the extent possible, your response should not include any personal privacy,
d
proprietary, or safeguards information so that it can be placed in the PDR without
redaction. However, if you find it necessary to include such information, you should
!
clearly indicate the specific information that you desire not to be placed in the PDR, and
provide the legal basis to support your request for withholding the information from the
,
public.
,
l
The responses directed by this letter and the enclosed Notice are not subject to the
'
'
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
!
We appreciate your cooperation.
Sincerely,
I
Michael C. Modes, Chief
l
Civil, Mechanical, and Materials
Engineering Branch
'
,
Division of Reactor Safety
i
Docket License Nos.
50-317/DPR-53
)
50-318/DPR-69
Enclosure:
2. Combined inspection Report Nos. 50-317/96-09
and 50-318/96-09
cc w/ encl:
T. Camilleri, Director, Nuclear Regulatory Matters (CCNPP)
R. McLean, Administrator, Nuclear Evaluations
J. Walter, Engineering Division, Public Service Commission of Maryland
K. Burger, Esquire, Maryland People's Counsel
R. Ochs, Maryland Safe Energy Coalition
State of Maryland (2)
l
.
9
.-
l
Charles H. Cruse
3
l
Distribution w/ encl *
Region i Docket Room (with concurrences)
Nuclear Safety information Center (NSIC)
l
PUBLIC
J. Wiggins, DRS
D. Screnci, PAO
-
NRC Resident inspector
DRS File (,2)
Distribution w/ encl: (VIA E-MAIL)
W. Dean, OEDO (WMD)
S. Stewart - Calvert Cliffs
,
l
S. Bajwa, NRR
1
A. Dromerick, NRR
G. Vissing, NRR
-
M. Campion, Rl
R. Correia, NRR
,
R. Frahm, Jr., NRR
inspection Program Branch, NRR (IPAS)
DOCUMENT NAME: A:CC9609. INS
Ts esceive e copy of this document, indicate in the bos:
- C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
- N" = No copy
OFFICE
Rl/DRS
l
Rl/DRS
l
l
l
l
NAME
SChaudhary slec.
MModes
DATE
10/31/96
10/
/96
10/
/96
10/
/96
10/
/96
OFFICIAL RECORD COPY
i