ML20134G443
| ML20134G443 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 11/05/1996 |
| From: | Rogge J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Feigenbaum T NORTHEAST UTILITIES SERVICE CO. |
| Shared Package | |
| ML20134G446 | List: |
| References | |
| NUDOCS 9611130202 | |
| Download: ML20134G443 (3) | |
See also: IR 05000213/1996010
Text
.. . _ . . ____ _ _.
_ _.._.._._.
.
_.
_-
. _ . _ _ _ . . .____
_ . .
i
-.
-
.
e .
, 91
!
!
.!
!
!
November 5,1996
i
l
(.
!
i
i
Mr. Ted C. Feigenbaum
!
Executive Vice President and Chief Nuclear Officer
l
Northeast Utilities Service' Company
j
c/o Mr. Terry L. Harpster
- P.O. Box 270
.!
l
Hartford, Connecticut 06141-0270
. SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-213/96-10
f
j
Dear Mr. Feigenbaum:
l
On September 23,1996, the NRC completed an inspection at Connecticut Yankee Atomic
~,
l
Power Company. The enclosed report presents the results of that inspection.
- 4 (
!
!
During the six-week period covered by this inspection period, the conduct of activities at
'
l
the Haddam Neck Station. facility was generally characterized by efforts to transition from a
!
!
maintenance outage to the early start of the cycle 19 refueling outage. ' The reactor was
i
partially drained and vented when the reactor disassembly sequence was placed on hold on
i
August 30. Several significant events occurred which challenged reactor cooling and.
)
i
inventory control: a through wall leak was identified on the inlet valve for the "A" residual
l
heat removal (RHR) heat exchanger on August 30; and, on September 1 the operators
l
discovered that about 5000 gallons of reactor coolant system (RCS) inventory was
inadvertently drained when a nitrogen bubble accumulated in the reactor head, and the "B"
l'
RHR pump failed as the operator tried to start it.
l
The plant management and staff failed to appreciate the significance of the nitrogen bubble
I
event and systematically under reacted to the event initially. These events were safety
significant and revealed deficiencies in operations procedure quality, operator use of
procedures, deficiencies in plant material conditions, inadequacies on work control, and
poor plant staff sensitivity to the control of shutdown risk. These events revealed
fundamental weaknesses and broad concerns in the overall conduct of operations of
Haddam Neck. In a letter dated October 9,1996, the NRC requested that you include the
above issues in the corrective action plans prior to plant restart. Other NRC findings
related to this event are described in NRC Inspection 96-80.
I
!
i
!
!
.l
,
1
,
l
l
120052
'
'
,o uso
.uo.
a
A.Ol
ADOCK oSoo0213
e
2
/
\\
-
.
-
_
-
. _ _ -
_ _ .
_ _ _ _ _ .
._
.
.
. . _ .
. - - _ _ _ _
_.___
_
..
_
.
- .,
,
,
,c ,
Mr. Ted C. Feigenbaum
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
l
and its enclosure will be placed in the NRC Public Document Room (PDR).
Sincerely,
Original Signed By:
John F. Rogge, Chief
Projects Branch 8
j
Division of Reactor Projects
'
i
Docket No. 50-213
License No. DPR-61
Enclosure:
,
1. NRC Integrated Inspection Report No. 50-213/96-10
cc w/ encl:
B. D. Kenyon, President and Chief Executive Officer - Nuclear Group
D. Goebel Vice President - Nuclear Oversight
J. Thayer, Vice President - Nuclear Engineering and Support Recovery Office
F. C. Rothen, Vice President - Work Services
J. J. LaPlatney, Haddam Neck Unit Director
L. M. Cuoco, Senior Nuclear Counsel
J. E. Van Noordenen, Licensing Manager - Haddam Neck
H. F. Haynes, Director - Training
l
J. F. Smith, Manager, Operator Training
W. D. Meinert, Nuclear Engineer
State of Connecticut SLO
l
l
l
-
4
l
i
4
,
-
.
,
__
.
' :
.
.
I
.
Mr. Ted C. Feigenbaum
3
i
Distribution w/ encl:
Region i Docket Room (with concurrences)
D. Screnci, PAO
J. Rogge, DRP
NRC Resident inspector
M. Conner, DRP
'
C. O'Daniell, DRP
Nuclear Safety Information Center (NSIC)
PUBLIC
Distribution w/enci (VIA E-MAIL):
W. Dean, OEDO
P. McKee, NRR/PD l-4
R. Jones, NRR
R. Correia, NRR (RPC)
R. Frahm, Jr., NRR (RKF)
Inspection Program Branch, NRR (IPAS)
!
i
!
l
!
!
!
l
t
l
l
DOCUMENT NAME: G:\\ BRANCH 8\\HN\\HN9610. INS
j
To receive a copy of this document, indicate in the box: "C" = Copy without
attachment / enclosure ,"E" = Copy with attachment / enclosure
"N" = No copy
OFFICE
Rl/DRP [fG
Rl/DRP fjo
-
,
l
NAME
WJRAYMOND
JFROGGl* V
t
l
DATE
11/05/96
11/(/96
OFFICIAL RECORD COPY