ML20134G245

From kanterella
Jump to navigation Jump to search
Discusses Insp Rept 50-302/96-07 on 960729-0802 & Violation Re Apparent Failure to Disclose Criminal History During pre-employment Screening Process at Plant,Unit 3
ML20134G245
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/19/1996
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Brooks D
AFFILIATION NOT ASSIGNED
References
IA-96-058, IA-96-58, NUDOCS 9702100333
Download: ML20134G245 (6)


See also: IR 05000302/1996007

Text

--

-

-

.

. - . . . . - - . _ . . . _ _ . . - . - -

- - . -

..

.

.

-

_ - - _ .

.

0

'ciah

hts,s a4

UNITED STATES

9'o;4

.

NUCLEAR REGULATORY COMMISSION

i

~ y"

REGION ll

101 MARIETTA STREET, N.W., SUITE 2900

E

g

GEORGIA 30323-0190

ITLANTA'ber 19, 1996

t

i

eptem

-

%*****/

'

IA 96-058

1-

Mr. David Brooks

-

'

[HOME ADDRESS DELETED

UNDER 10 CFR 2.790]

~

SUBJECT:

NRC INSPECTION REPORT NO. 50-302/96-07

Dear Mr. Brooks:

(

This refers to the inspection conducted on July 29 through August 2, 1996, at

the Crystal River Nuclear Plant. The inspection included a review of the

incident identified by Florida Power Corporation (licensee) involving your

'

i

apparent failure to disclose your criminal history during the pre-employment

i

screening process at the Crystal River Nuclear Plant - Unit 3.

The report

1

docuthenting' the NRC inspection contains Safeguards Information: however, an

excerpt from th.e applicable portion of the report is provided as Enclosure 1.

,

The licensee's investigation of this matter revealed that while you were

employed by Brock and Blevins (a division of William Powers Company), you

falsified the Crystal River Personal History Questionnaire (PHQ) when you

,

failed to ' include a complete record of prior criminal charges.

Based on the

'

inaccurate information you provided on the PHQ, you were granted temporary,

unescorted access to the Crystal River site from February 13 through April 10,

1996, pending completion of Federal Bureau of Investigation (FBI) fingerprint

4

checks.

Subsequent to your arrest on April 4,1996, the licensee received

your FBI fingerprint information which revealed criminal charges which were

4

not included on your PHQ.

Upon the licensee's request, you returned to the

Crystal River Plant site to participate in the licensee's investigation.

You

stated that you were unaware of an outstanding warrant for your arrest and had

,

unintentionally omitted the missing criminal charges from the PHQ.

Your site

access was subsequently terminated by the licensee.

2

You should be aware of the Commission's regulations ap)licable to this case.

First,10 CFR 73.56 requires each licensee to establisi and maintain an access

authorization program which provides a high degree of assurance that the

individuals granted unescorted access to protected and vital areas of a

'

nuclear power plant are trustworthy and reliable. One required element of

"

CERTIFIED MAIL RECEIPT N0. Z 238 504 387

. RETURN RECEIPT REQUESTED

1

4

9702100333 960919

PDR

ADOCK 05000302

P

PDR

.

\\

\\

\\ O

'

.

-

..

j.-_._._. . _ . _ . . __._

. _ . _ . _ . _ . . . . _ _ . _ - - _ .

_ _ . . .

_____.

\\

.g

.

i

i

D. Brooks

2

4

this program is the completion of a background investigation including

verification of criminal history.

Second. 10 CFR 50.9(a). " Completeness and

i

!

Accuracy of Information." provides, in part, that information required by the

- .

Commission's regulations or license. conditions to be maintained by.the

s

-

licensee shall be-complete and accurate.in all material respects.

Lastly,

i

10 CFR 50.5(a)(2), " Deliberate Misconduct." prohibits employees from

I

deliberately submitting any information to a licensee that the person knows to

be incomplete or inaccurate. The NRC relies on accurate records of activities

,

}

and the integrity of individual workers at nuclear power facilities to ensure

d

the health and safety of the public and, therefore, expects no less than full

F

compliance with all applicable requirements.

In this case, the NRC has decided not to pursue any formal enforcement action

1

!

against you based on the information provided to us by Florida Power

l

Corporation that you cooperated with their investigation and because NRC is

!.

unaware of similar actions by you at other facilities.

While formal

i

enforcement action is not being taken against you in this matter, we are

l

issuing this letter to emphasize to you the NRC's expectation that you provide

i

complete and accurate information in all aspects of work at NRC licensed

i

facilities.

NRC regulations provide for the issuance of civil sanctions

"

directly against unlicensed persons who, through their deliberate misconduct.

cause a licensee to be in violation of NRC requirements.

Deliberate

misconduct includes an intentional act or omission that the person knows

constitutes a violation of a requirement, procedure or training instruction.

3

An order also may be issued to an individual to prevent his or her engaging in

j

licensed activities at all NRC licensed facilities.

A violation of this

regulation as set forth in 10 CFR 50.5 may also lead to criminal prosecution.

t

Similar failures in the future could lead to civil or criminal action against

}

you.

l

You are not required to respond to this letter.

However, if you choose to

provide a response please provide it to me within 30 days of the date of this

letter at the U.S. Nuclear Regulatory Commission. Region II.101 Marietta

,

}

Street. Suite 2900. Atlanta, GA 30323.

i

In accordance with Section 2.790 of the NRC's " Rules of Practice." Part 2.

l

Title 10. Code of Federal Regulations. records or documents compiled for

i

enforcement purposes are placed in the NRC Publi- Document Room (PDR).

A copy

-

of-this letter with your address removed, and your response, if you choose to

i

submit one, will be placed in the PDR (within 45 days of the date of this

j

letter unless you provide sufficient basis to withdraw this letter).

i

~

t

i

i

I

i

i

s

K

- - ,

, . , -

-

-..

-- -

,,

,,-

,

- , . . -

,,,-

-

.

D. Brooks

3

'

If you have any questions or comments regarding this letter, please contact

Mr. Paul Fredrickson, Chief. Special Inspection Branch, at (404) 331-5596.

-

Sincer,ely.

/

't

kg

'

,

)

Stewart D. Ebtfe' r

Regional Administrator

Enclosures:

1.

Excerpt from NRC Inspection Report

No. 50-302/96-07

2.

Deliberate Misconduct Rule

cc w/encls [with HOME ADDRESS DELETED]:

Florida Power Corporation

Crystal River Energy Complex

Mr. P. M. Beard. Jr. (SA2A)

Sr. VP Nuclear Operations

ATTN: Mgr.

Nuclear Licensing

15760 West Power Line ;;reet

Crystal River FL 34428-6708

)

,

.

-

.

~

EXCERPT FROM NRC INSPECTION REPORT NO. 50 302/96 07

6.0

Access Authorization (TI 2515/127)

By letter dated May 27. 1992, t.he licensee submitted Revision 6 to the Crystal

River Nuclear Plant- PSP committing to the requirements of 10 CFR 73.56 and NRC

-

Regulatory Guide 5.66. Access Authorization Proaram for Nuclear Power Plants,

t

Upon discussion with licensee representatives, the inspector noted that four

Williams Power Company employees had recently been terminated due to possible

falsification. The inspector determined that the following contractors had

i

,

falsified their Personal Histo y Questionnaires (PHQs):

A contractor was granted temporary unescorted access on

.

January 18. 1996, and was terminated on April 12. 1996.

The

i

individual's access was terminated for falsification of the PHQ in

which he failed to list previous criminal convictions.

In

~

addition, while employed at Crystal River, the contractor failed

to report an arrest for Driving Under the Influence (DUI).

The

falsification was discovered by the licensee when the fingerprints

were returned to the licensee.

-

A contractor was granted temporary unescorted access on

February 7,1996, and was terminated on April 12, 1996.

The

individual's access was terminated for falsification of the PHQ in

which he failed to list previous felony convictions.

The

falsification was discovered by the licensee when the fingerprints

were returned to the licensee.

-

A contractor was granted temporary unescorted access on

February 17. 1996, and was terminated on March 12. 1996.

The

individual's access was terminated for falsification of the PHQ in

which he failed to list previous felony convictions.

The

'

falsification was discovered by the licensee when the fingerprints

were returned to the licensee,

i

-

A contractor was granted temporary unescorted access on

February 13, 1996, and was terminated on April 10, 1996.

The

individual's access was terminated for falsification of the PHQ in

which-he failed to list previous criminal convictions.

Prior to

the return of the fingerprints, the individual was arrested

offsite on outstanding warrant charges. The return of the

-

fingerprints noted this outstanding warrant also.

The inspecto? noted that the PHQ given to the individuals to complete clearly

requested that the applicant provide information concerning any arrest,

conviction, indictment, charge or fined offense within their lifetime.

The falsification of Access Authorization records discussed above is being

considered further by the NRC.

This will be tracked as Unresolved Item (URI)

96-07-03.

Enc 5sure 1

.

-

.

--..

m

@.

.Dw

.

a@mn-

..,m

,

--

_

__ _

__.

_

__ . _ _ _

.

_ _ . _ _ _ _ _ _

.. _

.

50A(b)

'

-

.

RUtf 50 e DOMESTIC UCENSING OF PRODUCTION AND UTIUZATION FACluTIES

50.7(a)

1

i

Nuclear Regulatory ca==tanta=

=

Document Control Desk. Washington,

id) Delivery of communications.

(b) A person who violates paragraph

!

DC 20885. two ospies to the APP'

te

ruten communscauona may be

(ah (aX2M this medon may be

Regional Office, and one

dehvered to the Documesit Control Desk

subject to enforcement action in

appropriate NRC Residen

pectorif

at 11555 Rockville Pike. Rockville.

accordance with the procedures in to

.

one has been assigned to the site of the ; Maryland between the hours of 8:15 a.m.

CFR part 2. subpart B.

goog;ty,

g evid 4% p.m. E. stern Timt:. !! .

(c) For purposes of paragraph (a)(1) of

.

(i) r.mergency plan pursuant to i 50.34: suomittcl due date falls on Saiurda>.

g this section. deliberste masoonduct by a

'

i _-

(ii) Change to an esmergency plan

  • Sunuuy. or Federal holiday. the nest

3 person means an intendonal act or

pursuant to 6 80.54(q);

Federal working day becomes the

g' omission that the person knows

!

(LH) Emergency tmplementing

CII'cial due date.

g

(1) Would cause a licensee to be in

promdures pursuant to Appendix R.V of ~.

violation of any rule, regulation, or

'

this part.

(e) Regulation governing submission.

Order, or any term. condition. or

i

(6) UpdosedISAR. An updated Final

Umanaas and a

Safety Analysis Report (FSAR) or

. correspondence,pplicants submitting

limitation. of any license issued by the

'

reports andother

Commission. or

replacement pages, pursuant to

{ written communications pursuant to the

(2) Constitutes a violation of a

I

'

I 80.71(a) must be subantted as follows: 7e regulations of this part are requested but

requirement. procedure instruedon.

,

the signed original and to copies to the

m not required to cite whenever practical.

contract. purchase order or policy of a

!

Nuclear Regulatory e--

2 la the upper right corner of the first page

licensee, contractor, or subcontractor.

Document Control Desk. Weahington,

of the submittal the specific regulation

'

-

'

DC 20585. one copy to the appropriate

or other basis, requiring submission.

j

i

Regional Office. and one copy to the

-

-

'

appropnate NRC Resident inspector if

lgg.7 empseyesproceeman.

'

one has been assigned to the site of the

,

,'

I" N

(a) D!acnmination by a

n==<= dan

,

e

8 (7) Quality assurance related

(f) Conflicting requirements. The

Mcensee. an applicant for a Commission

license. or a contractor or subcontractor

I

y submntols. (i) A change ta the Safety

, j,

,",",'nd

b 0.

of a Commission licanees or applicant

si d

e Analysis Report quality assurance

3

agamst an employee for angegangin

.

a.

.5a55.Sa55a.

  • program desenption pursuant to

A

'

.

.

certain protected activities is prohibited.

E

3

3. 50 82. 50.90, and

Discrimin.uan includes discharge and

l 50.54(a)(3) or i 50.55(fl(3). or a change

.

.

.

g

to a licensee's NRC. accepted quality

j 50.91 supersede and replace all existmg

other actions that relate to

requtrements in any license conditions

compensation. terms.=aasiaan or

i

assurance topical report pursuant to

-

l 50.54(a)(3) or i 50.56(f)(3). must be

or technical specifications in effect on

pnvileges of emplo

t. 'llis peonected

.

1

submitted as follows: the signed onginal

January 5.1937. Exceptions to these

ties are estab shQin section 211

to the Nuclear Regulatory Commission,

requirements must be approved by the

g Energy

_

of

Document Control Desk. Washington.

Information and Records Management

_

-

related to the administration er

DC 20558. one copy to the appropriate

Branch. Nuclear Regulatory

4

enforcement of a requuument unposed

4

Regional O!! ice. and one copy to the

Commission. Washington. DC 20555.

under the Atoauc Energy Act or the

appropnete NRC Resident inspector if

Telephone (301) 415 7230.

Erq(1) The protected activities include

Roorganlaation Act.

one has been assigned to the site of the

-

g but are not limited to:

,

"

Iscility,

(ii) A change to an NRC. accepted

f

(i)Providing the n==wan or his or

e

quality assurance topical report from

" her employer mformation about alleged

"

nonlicensees (i.e., architect / engineers.

3 vi lations of either of the statutes

NSSS suppliers fuel suppliers.

De8 Bed in paragrepa (a) introductory

constructors, etc.) must be submittad as

text of the secuan or possible violations

follows: one signed enginal to the

of requirements imposed under either of

those statutes:

Nuclear Regulatory Commission.

Iso.s Deu mrom nussonouct.

(til Refusing to engage in any practice

,

j

Document Control Desk. Washington.

(a) Anylicensee or any employee of a

made uniswfut under either of the

DC 20555.

licensee; and any contractor (including a

statutee named in paragraph (el

~.

supplier or consultant). subcontractor. or

introductory text or under these

a

(c) form of communications. All

any employee of a contractor or

requirements if the employee has

i

copics submitted to meet the

subcontractor, of any licensee, who

identified the sileged tilegality to the

requirements set forth in paragraph (b)

knowmgly provides to any licensee,

employen

j

of this sectson must be typewritten,

contractor, or subcontractor.

W) Requesting the Conninission to

pnnted or otherwise reproduced in

components, equipment, matenals, or

,[h*8[a

" *

q

permanent form on unglaned paper.

other goods or services that relate to a

u

r

enfortament of these requirements.

Exceptions to these requirements may

licensee's activities subject to this part:

(iv) Testifying in any ce==Aada=

, be granted for the submittal of

may not:

pmcmeding or before Congress. or at any

micrographic. photographic or

(1) Engage in deliberate misconduct

Federal or State p

regarding

4

i-

E electronic forms. Prior to making any

that causes or, but for detection. would

any provision (or

provisioni of

E submittalin other than paper form. the

5 have caused. a licensee to be in

either of the statutes named in

g applicant or licensee must contact the

$ violation of any rule. regulation. or

paragraph (a) introductory text.

.

,

Information and Records Management

order, or any term condition. or

I'l ^ssistmg or participating in. or is

i

Branch. Nuclear Regulatory

limitation of any license, issued by the

abou o masset or participate in, these

Commission. Washington. DC 20555.

Commission. or

J

telephone 1301) 415 7230, to obtain

(2) Deliberately submit to the NRC. a

J

specifications, copy requirements, and

licensee, or a licensee's contractor or

pnor approval.

subcontractor. information that the

'.

n subautting the information

f

""

to be incomplete or inaccurate in

l

some respect material to the NRC.

<

Enclosure 2

'

xb.a

r

. ,

au

_

.

.,.m

. . .~ 1 m.~ ,

.

-

.

. _

_ ..

.

-

. - _ _ .

..

_

__ _.

-_.. ._ .

.. .

-

-

..

D. Brooks

4

Distribution w/encls fwith HOME ADDRESS DELETEDl:

PUBLIC

EJulian SECY

BKeeling. CA

JTaylor. EDO

.-

JMilhoan. DEDR

WRussell NRR

RZimmerman. NRR

SEbneter. RII

LChandler. 0GC

JGoldberg. OGC

JLieberman. OE

Enforcement Coordinators

RI. RIII, RIV

EHayden. OPA

EJordan. AEOD

GCaputo. 01

HBeH. OIG -

'

OE:EA File (B. Summers. OE) (2)

JBeall. OE

LRagahaven. NRR

JJohnson, RII

AGibson, RII

'

CEvans. RII

Buryc. RII

'

Klandis. RII

PFredrickson RII

LMellen RII

LStratton. RII

ABoland RII

KClark. RII

RTrojanowski, RII

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

g

6745 N. Tallahassee Road

Crystal River. FL 34428

see To pumic oncmtwT noo>n

vrs (m)

/ '

orrict

niics .

mits#s

niim

att m#n

usa,e[

miB

tate

09/ \\b/96

ot T96

09/ Leo I96

6/ /K#

A

cmo <ftic m

6ts, , m

vrs

m

vrs/ //m /

OFFICIAL RECORD COPY

DOCUMENT NAME:H:\\1960 PEN.ENF\\9631 % .DIR\\PKGTOOE.NAD

n/n/wi