ML20134G116
| ML20134G116 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 08/16/1985 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 8508230051 | |
| Download: ML20134G116 (1) | |
Text
_
AUG 16 iT5 Docket No. 50-266 Docket No. 50-301 l
Wisconsin Electric Power Company ATTN:
Mr.:C. W. Fay.
Vice President Nuclear Power Department 231 West Michigan, Room 308 Milwaukee, WI 53201 Gentlemen:
-We-have. completed'our review of the July 12, 1985, revisions to the Point Beach Nuclear Plant Emergency Plan.
Our review indicated that your plan changes do
- not-downgrade.the effectiveness of your emergency plan.
Please be-: reminded that 10 CFR Part 50.54(q) requires NRC approval of any changes to your plan which may decrease the effectiveness of the plan.
However, if your safety review indicates no decrease in emergency preparedness, then changes can be made without.NRC approval.
In all cases, you should furnish copies of each proposed change to the NRC in accordance with 10 CFR Part 50.54(q).
- Also, any changes to the Emergency Plan-Implementing Procedures should be made in accordance with the' requirements of 10 CFR Part 50, Appendix E, Section V (Implementing Procedures).
Should you have any questions regarding this letter, please contact Mr. William Snell of my staff at (312) 790-5513.
Sincerely, l
J W
D. Shafer, Chief Emergency Preparedness and i
Radiological Protection Branch cc:
J. J. Zech, Plant Manager l
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII John J. Duffy, Chief Boiler Section i-Ness Flores, Chairperson f
f Wisconsin Public Service
/d U
Commission i}I Peter Anderson, Wisconsin's
/
0 Environmental Decade W. Weaver, FEMA, Region V.
(p D. Matthews, EPB R
RIII RIII RIlh
, Pip 1' Jckjw Sh fer p
./'
. 08/14/85 L
8508230051 850816 PDR ADOCK 05000266 l
F PDR L