ML20134G074

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-263/96-12 on 961128-970108.No Violations Noted
ML20134G074
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/31/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Watzl E
NORTHERN STATES POWER CO.
Shared Package
ML20134G077 List:
References
NUDOCS 9702100263
Download: ML20134G074 (3)


See also: IR 05000263/1996012

Text

%  !

+

h@ D(Lb

January 31, 1997

Mr. E. Watzl, Vice President

Nuclear Generation

Northern States Power Company

414 Nicollet Mall

Minneapolis. MN 55401

SUBJECT: NRC INSPECTION REPORT NO. 50-263/96012(DRP)

Dear Mr. Watzl:

On January 8. 1997, the NRC completed an inspection at your Monticello reactor

facility. The enclosed report presents the results of that inspection.

During the 6-week seriod covered by this inspection period, your conduct of I

activities at the ionticello facility was generally characterized by safety- '

conscious operations sound engineering and maintenance practices, and careful i

radiological work controls. The decision to shutdown the reactor to repair j

the "D" safety relief valve was proactive and demonstrated a good safety

perspective. Your staff conducted the shutdown in a controlled manner and

repaired several existing material condition concerns.

A rapid )ower reduction necessitated by a loss of condenser vacuum occurred i

during t1is period. This was attributed to a failure to fully consider the

effect of frigid air from open turbine building doors on nearby equipment.

This issue will be further assessed during the next inspection period.

No violations or deviations from NRC requirements were identified during this

inspection period.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of  :

this letter and its enclosures will be placed in the NRC Public Document Room. I

1

Sincerely. l

1

/s/ J. L. Caldwell l'

James Caldwell. Director

Division of Reactor Projects )

Docket No. 50-263 /)k9L['L

8

g ,

License No. DPR-22 yj {3

Enclosure: Inspection Report

No. 50-263/96012(DRP)

PLEASE SEE ATTACHED CONCURRENCES

DOCUMENT NAME: R:\INSPRPTS\ POWERS \MONT\ MON 96012.DRP

reeive a copy of this doctment. indicate in the box "C" = Copy without attach / encl T* = Copy with attach / encl "N" =

OFFICE RIII RIII

NAME Jacobson/co Caldwell

DATE 1/ /97 1/ /97

0FFICIAL RECORD COPY

9702100263 970131

PDR

0 ADOCK 05000263

PDR

. ,

Mr. E. Watzl, Vice President

Nuclear Generation

Northern States Power Company

414 Nicollet Mall

Minneapolis MN 55401

SUBJECT: NRC INSPECTION REPORT NO. 50-263/96012(DRP)

Dear Mr. Watzl:

On January 8, 1997, the NRC completed an inspection at your Monticello reactor

facility. The enclosed report presents the results of that inspection.

During the 6-week period covered by this inspection period your conduct of

activities at the Monticello facility was generally characterized by safety-

conscious operations, sound engineering and maintenance practices, and careful

radiological work controls. The decision to shutdown the reactor to repair

the "D" safety relief 'talve was proactive and demonstrated a good safety

perspective. Your staff conducted the shutdown in a controlled manner and

repaired severdi existing material condition concerns.

A rapid 3ower reduction necessitated by a loss of condenser vacuum occurred

during t11s period. This was apparently attributed to a failure to fully

consider the effect of frigid air from open turbine building doors on nearby

equipment. This issue will be further assessed during the next inspection

period.

No violations or deviations from NRC requirements were identified during this  !

inspection period.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of

this letter and its enclosures will be placed in the NRC Public Document Room. I

l

Sincerely.

James Caldwell. Director

Division of Reactor Projects

Docket No. 50-263

License No. DPR-22

Enclosure: Inspection Report

No. 50-263/96012(DRP)

DOCUMENT NAME: R:\INSPRPTS\ POWERS \MONT\ MON 96012.DRP

To receive a copy of this document. indicate in the box "C" = Copy without attach /enci "E" = Copy with attach / enc 1 "N" =

OFFICE RIII_ s f'RII[ .

NAME Jadot>sM CMMli

DATE lbb 1[9/97

0FFICIAL RECORD COPY

. . . .-_ - . _ . - _ . - - . . . - - . _ .. . _ _ _

l . .

s

E. Watz1 -2-

.

cc w/ encl: . Plant Manager. Monticello

John W. Ferman, Ph.D..

Nuclear Engineer. MPCA

.

State Liaison Officer. State

of Minnesota

Distribution:

Docket File w/ encl DRP w/ encl

PUBLIC IE-01 w/ enc 1 Rill PRR w/ encl

l OC/LFDCB w/ encl Project Manager. NRR w/ encl

i SRI Monticello, w/ encl Prairie Island w/ encl

} A. B. Beach, w/ encl H. B. Clayton, w/ enc 1

j W. L. Axelson, w/ encl CAA1 w/ encl (E-mail)

!,

,

)

s

I

i

.i

4

4

i

i