Text
-
pn ato
\\
y" UNITED STATES g
j NUCLEAR REGULATORY COMMISSION
't WASHINGTON, D.C. 2056H001
,o November 5,1996 Mr. N. J. Liparulo, Manager Regulatory and Engineering Networks Westinghouse Electric Corporation Nuclear Technology Division P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355
SUBJECT:
REQUEST TO WITHHOLD INFORMATION FROM PUBLIC DISCLOSURE, WOLF CREEK NUCLEAR OPERATING CORPORATION (CAW-96-944) (TAC NO. M94764)
Dear Mr. Liparulo:
By letter dated March 14, 1996, you requested that the U.S. Nuclear Regulatory Commission (NRC) withhold from public disclosure the proprietary version of a report entitled " Incomplete Rod Insertions During Cycle 8 - Interim Report on Inspection Plar, Inspection Results and Root Cause," dated March 1996.
In a letter dated June 24, 1996, the NRC staff made the following statement:
'We do not believe that all the designated information includes distinguishing aspects or would improve a competitor's economic advantage. With the exception of the following numerical data, we do not believe the information constitutes trade secret or proprietary commercial information:
1)
Page 10 Under Observations [xxxxxx] and [xx]
2)
Page 11 Under Observations [xx].
The staff further requested that you review your claim and provide within 30 days a detailed justification as to why the information is considered proprietary.
In your letter of July 19, 1996, you responded to the NRC's June 24, 1996, letter and continued to assert that the bracketed information in the revised report, forwarded by a letter dated April 9,1996, was proprietary.
The staff has reviewed your July 19 letter and all the supporting informat!on in accordance with the requirements of 10 CFR 2.790 and has concluded that you have not provided sufficient justification for the NRC to conclude that the information you seek to withhold from public disclosure is proprietary.
In addition, the staff has concluded that the right of the public to be fully apprised as to the basis for and the effects of the failure of the control rods to fully insert at Wolf Creek outweighs your concern for protection of your competitive position.
Although the staff agrees that a small portion of the information may be proprietary (see the enclosed June 24 letter from W. Russell to N. Liparulo),
control rod operability is crucial to the safety of pressurized-water reactors (PWRs) and availability of this information is necessary so that PWR licensees can adequately assess the operability of their control rods and recognize the I
hII 9611080206 961105 PDR ADOCK 05000482 P
Mr. N. J. Liparulo !
potential for safety-significant precursor phenomenology.
- Further, information must be made available to other fuel manufacturers so that they can assess the susceptibility of their fuel to similar conditions.
The staff also notes that the majority of the information in question has been released in subsequent public meetings and other non-proprietary submittals to the NRC.
In your July 19 letter, you requested' withdrawal of the document in question.
The NRC is unable to permit withdrawal of this document.
Information in the document formed, in part, the bases for NRC's allowing Wolf Creek to restart l
after completion of its refueling outage. Also, the NRC decision to allow other plants with Westinghouse-designed fuel to continue to operate without requiring them to shut down and perform testing was partially based on the information in the document.
Accordingly, the staff has concluded that your wish to withhold the information from public disclosure is overridden by public health and safety considerations, except as detailed in the NRC's June 24 letter.
Therefore, your request to withhold the report entitled " Incomplete Rod Insertions During Cycle 8 - Interim Report on Inspection Plan, Inspection Results and Root Cause," dated March 1996, is denied.
Ten (10) days from the date of this letter, the subject document will be placed in the public document rooms.
If you have any questions about this letter, please contact Margaret Chatterton at (301) 415-2889 or James Stone at (301) 415-3063.
i Sincerely, original alened b2 Frank J. Mi M d,' N.",8 %" ting Director Office of Nuclear Reactor Regulation Docket No. 50-482 DISTRIBUTION i
l Docket File JStone
Enclosure:
Letter dtd. 6/24/96 to PUBLIC EPeyton N. J. Liparulo PDIV-2 Reading MChatterton FMiraglia MPSiemien, OGC cc w/ encl: See next page RZimmerman JDyer, RIV JRoe EGAl WBateman DOCUMENT NAME: CAW 96944.WC
- See previous concurrence I
0FC PDIV-2/LA PDIV-2/PM TECH ED PDjV2/D SRXB D 2
NAME EMin' JStonei-%
BCalure*
WdtNan RJonesn DATE 10/15/96 10 /16 /91 10/9/96
'8/39/96
/0 /N /96 0FC OGC h D}Py/pj ADP fh NAR/D1 NAME MPSie b he i RZimdrman FH M ia DATE 10 /N/96
@/j0/96 f//4/96 ff/[//96 d1
/
0FFICIAL RECORD COPY
'I i
Mr. N. J. Liparulo.
potential for safety-significant precursor phenomenology.
- Further, information must be made available to other fuel manufacturers so that they can assess the susceptibility of their fuel to similar conditions.
The staff also notes that the majority of the information in question has been released in subsequent public meetings and other non-proprietary submittals to the NRC.
In your July 19 letter, you requested withdrawal of the document in question.
The NRC is unable to permit withdrawal of this document.
Infonsation in the document formed, in part, the bases for NRC's allowing Wolf Creek to restart after completion of its refueling outage. Also, the NRC decision to allow other plants with Westinghouse-designed fuel to continue to operate without requiring them to shut down and perform testing was partially based on the information in the document.
Accordingly, the staff has concluded that your wish to withhold the information from public disclosure is overridden by public health and safety considerations, except as detailed in the NRC's June 24 letter.
Therefore, your request to withhold the report entitled " Incomplete Rod Insertions During Cycle 8 - Interim Report on Inspection Plan, Inspection Results and Root Cause," dated March 1996, is denied.
Ten (l'0) days from the date of this letter, the subject document will be placed in the public document rooms.
If you have any questions about this l
letter, please contact Margaret Chatterton at (301) 415-2889 or James Stone at (301) 415-3063.
Sincerely, g,.3,1,,3,g,,,, w Frank J. MiMd,' N.",8%a. ting Director Office of Nuclear Reactor Regulation Docket No. 50-482 DISTRIBUTION Docket File JStone
Enclosure:
Letter dtd. 6/24/96 to PUBLIC EPeyton N. J. Liparulo PDIV-2 Reading MChatterton FMiraglia MPSiemien, OGC cc w/ encl:
See next page RZimerman JDyer, RIV JRoe 1
EGA1 WBateman l
DOCUMENT NAME: CAW 96944.WC
- See previous concurrence OFC PDIV-2/LA PDIV-2/PM TECH ED PDJV;2/D SRXB TM NAME E@
JStonh BCalure*
WE1ItNan RJonesh 2
DATE 10/15/96 10/tS/91i 10/9/96
'0/79/96
/0 /N /96 0FC OGC C
D}Py/[j ADP [h NAR/M g
NAME MPSies[M dhe9 RZimm@rman FMMia 10 d/96
@/j0/96 j[///96
/h96 d1 i
DATE
/
f 0FFICIAL RECORD COPY
'l 1f,
Mr. N. J. Liparulo cc:
Jay Silberg, Esq.
Vice President Plant Operations Shaw, Pittman, Potts & Trowbridge Wolf Creek Nuclear Operating Corporation 2300 N Street, NW P. O. Box 411 Washington, D.C.
20037 Burlington, Kansas 66839 Regional Administrator, Region IV Supervisor Licensing U.S. Nuclear Regulatory Commission Wolf Creek Nuclear Operating Corporation 611 Ryan Plaza Drive, Suite 1000 P.O. Box 411 Arlington, Texas 76011 Burlington, Kansas 66839 Senior Resident Inspector U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Resident Inspectors Office P. O. Box 311 8201 NRC Road Burlington, Kanras 66839 Steedman, Missouri 65077-1032 Chief Engineer Supervisor Regulatory Compliance Utilities Division Wolf Creek Nuclear Operating Corporation Kansas Corporation Commission P.O. Box 411 1500 SW Arrowhead Road Burlington, Kansas 66839 Topeka, Kansas 66604-4027 Mr. Neil S. Carns Office of the Governor President and Chief Executive Officer State of Kansas Wolf Creek Nuclear Operating Corporation Topeka, Kansas 66612 P.O. Box 411 Burlington, Kansas 66839 Attorney General Judicial Center 301 S.W. 10th 2nd Floor Topeka, Kansas 66612 County Clerk Coffey County Courthouse Burlington, Kansas 66839 Public Health Physicist Bureau of Air & Radiation Division of Environment Kansas Department of Health and Environment Forbes Field Building 283 Topeka, Kansas 66620 i
l
f t
UNITED STATES g
j NUCLEAR REOULATORY COMMI2SION 2
c'ASMl337CN, D.C. - =1
.....[
a June 24, 1996 N. J. Liparulo, Manager Regulatory and Engineering Networks l
Westinghouse Electric Corporation p.0. Box 355 Pittsburgh, Pennsylvania 15230-0355
Dear Mr. Liparulo:
In your letter of March 14, 1996, you requested that the Nuclear Regulatory Commission (NRC) withhold the following document from public disclosure pursuant to 10 CFR 2.790:
- Enclosure 1, revised (Incomplete Rod Insertions During Cycle 8 -
Interim Report on Inspection Plan, Inspection Results and Root Cause (Proprietary)) to the letter from Otto L. Maynard, Wolf Creek Nuclear Operating Corporation, to NRC Document Control Desk dated March 20, 1996.
The Westinghouse Electric Corporation affidavit executed by you on March 14, 1996, forwarded with the proprietary document, stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b)
It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive. economic advantage, e.g., by optimization or improved marketability.
(c)
Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar
. product.
The NRC staff has reviewed your application and the information acco-ding to l
the requirements and criteria of 10 CFR 2.790 and conducted a telephone conference with your representatives on April 4, 1996, to discuss this material and the propriety of the Westinghouse proprietary claim.
The NRC i
staff reviewed the revised Westinghouse submittal dated April 9, 1996, and held additional telephone conferences on April 24 and May 2,1996 with your representatives. Although the staff agrees that a small portion of the information may be proprietary, control rod operability is crucial to the safety of pressurized water reactors (PWRs) and availability of this information is necessary so that PWR licensees can adequately assess the operability of their control rods and recognize the potential for safety-I hh O g 10 0 1((.
^
N. J. Liparulo 2
I significant precursor phenomenology.
We do not believe that all the designated information includes distinguishing aspects or would improve a competitor's economic advantage.
With the exception of the following numerical data, we do not believe the information constitutes trade secret or proprietary commercial information:
- 1) Page 10 Under Observations Under Observations ((
q and [
1
- 2) Page 11
]
You are requested to review your claim and provide a detailed justification as to why the information is considered proprietary.
In accordance with 10 CFR 2.790(c), please provide the results of your reevaluation within 30 days of this letter, otherwise the document in question will be placed in the NRC Public Document Room.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
You also should I
understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Because the submittal enclosed with your March 9, 1996 letter is superceded by the April 9, 1996 revised submittal, the Commission deems the original version of the Interim Report on Inspection Plan, Inspection Results and Root Cause no longer relevant and is returning this document to you.
Any additional copies of this document will be appropriately destroyed.
Sincerely, M
William T. Russell, Director Office of Nuclear Reactor Regulation
.