Letter Sequence Approval |
|---|
|
|
MONTHYEARML20128E9491985-05-22022 May 1985 Forwards Response to License Condition C(13) Re Low Temp Overpressure Protection.Reliance on Administrative Controls, W/Addition of Alarm Circuits on Valves,Provides More Protection for Both RCS & RHR Sys than Interlocks Project stage: Other ML20134F5191985-08-16016 August 1985 Safety Evaluation Supporting Rev 12 to Facility Site Addendum Re Removal of 345 Kv Offsite Transmission Line to West Gardner Switching Station from Design Project stage: Approval ML20134F5061985-08-16016 August 1985 Safety Evaluation Supporting Util 850522 Description of Mods to Low Temp Overpressure Protection Sys of Rcs.Requirements of License Condition 2.C.(13) Met Project stage: Approval ML20134F4881985-08-16016 August 1985 Forwards Safety Evaluations Supporting Util 850522 Description of Mods to Low Temp Overpressure Protection Sys & Procedures & Rev 12 to Facility Site Addendum,Removing 345 Kv Offsite Transmission Line from Design Project stage: Approval ML20155G3911986-05-0202 May 1986 Describes Mod to Design of Low Temp Overpressure Protection Alarm Circuitry & Provides Schedule for Implementation of Modified Design.Mod Scheduled to Be Completed Prior to Startup Following Refueling Project stage: Other 1985-08-16
[Table View] |
Safety Evaluation Supporting Rev 12 to Facility Site Addendum Re Removal of 345 Kv Offsite Transmission Line to West Gardner Switching Station from Design| ML20134F519 |
| Person / Time |
|---|
| Site: |
Wolf Creek  |
|---|
| Issue date: |
08/16/1985 |
|---|
| From: |
NRC |
|---|
| To: |
|
|---|
| Shared Package |
|---|
| ML20134F492 |
List: |
|---|
| References |
|---|
| TAC-61963, NUDOCS 8508210126 |
| Download: ML20134F519 (1) |
|
Text
.
ENCLOSURE 2 SAFETY EVALUATION WOLF CREEK GENERATING STATION DOCKET NO. 50-482 DESIGN CHANGE IN THE WOLF CREEK 0FFSITE POWER SYSTEM By Revision 12 to the Wolf Creek site addendum, the 345 kV offsite transmis-sion line between Wolf Creek and West Gardner switching station has been removed from the design and a 345/69 kV transfonner has been added to con-nect the 345 and 69 kV switchyards. Thus, both preferred offsite power sources are routed through the common 345 kV switchyard to the Class IE distribution system versus from separate switchyards.
The proposed design change was discussed with the applicant at a August 31, 1983 meeting.
Based on these discussions and proposed Revision 12 to the Wolf Creek site addendum provided by letter dated November 3,1983, the staff concludes that the proposed design change meets the requirements of GDC 17 and is acceptable.
1 8508210126 850816 PDR ADOCK 05000482 P