ML20134F019

From kanterella
Jump to navigation Jump to search
Further Response to FOIA Request for Records Re RCS of Certain Nuclear Power Plants,Particularly Tmi.Documents Listed on App Subj to Request & Available for Insp in PDR
ML20134F019
Person / Time
Site: Crane  Constellation icon.png
Issue date: 08/07/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Brewster C
KAYE, SCHOLER, FIERMAN, HAYS & HANDLER
References
FOIA-83-738, FOIA-83-788, FOIA-83-789 NUDOCS 8508200654
Download: ML20134F019 (3)


Text

Ebol6

[

UNITED STATES NUCLEAR REGULATORY COMMISSION D

n E WASHINGTON, D. C. 20555 gs...+/.

i AUG 7 1985 Christopher Brewster, Esquire Kaye, Scholer, Fierman, Hays & Handler IN RESPONSE REFER 1575 Eye Street, NW T0'F01A-83-738, F01A-83-788, Washington, DC 20005 AND F01A-83-789

Dear Mr. Brewster:

This is in further response to letters dated December 12 and 27, 1983, from Mr. Thomas Madden formerly of your law firm in which he requested, pursuant to the Freedom of Information Act (F0IA), various categories of records regarding reactor coolant systems of certain nuclear power plants, particularly the Three Mile Island (TMI) plant. This confirms information conveyed during recent telephone conversations between you and Linda Robinson.

Following receipt of these F0IA requests from Mr. Madden, the NRC provided partial re:;ponses to the requests but was unable to fully respond for various reasons, including a then current grand jury investigation of Mr. Hartman's allegations concerning TMI. Subsequent to the partial responses provided to Mr. Madden's requests and the present time, the staff identified additional records, listed on the enclosed appendix, which are subject to these requests and which are available for public inspection and copying at the NRC's Public Document Room.

Recently, the remaining records pending further review, and two boxes of additional records subject to a subsequent, related F0IA request, F01A-85-194, were withheld from disclosure in response to F01A-85-194 on the basis that disclosure of the records would interfere with an ongoing enforcement action.

Copies of that request and NRC's response are enclosed for your information.

This completes NRC's action on these F0IA requests.

S

erely, 1/ d

. M. Felton, Director Division of Rules and Records Office of Administration

Enclosures:

As stated i

8508200654 850007 PDR FOIA MADDEN 83-738 PDR j

f f

Re:

F01A-83-738 F0IA-83-788 F01A-83-789 APPENDIX RECORDS MAINTAINED AMONG PDR FILES 1.

10/25/79 Letter from Stello to Arnold, Metropolitan Edison Co.,

" Investigation Report No. 50-320/79-10.

PDR: 7910260339 2.

12/5/79 Letter from Arnold to Stello, " Response to Notice of Violation and Proposed Imposition of Civil Penalties."

PDR:

8307070492 3.

1/23/80 Letter from Stello to Arnold regarding evaluation of licensee response.

PDR: 8307130376 4.

2/11/80 LER 80-4 filed by Sacramento Municipal Utility District.

(3pages) PDR: 8002250499/AD0CK/50-312S 5.

10/17/80 Letter from J. Crews, RV, to Sacramento Municipal Utility District, "NRC Inspection of Rancho Seco," w/ enclosed inspection report 50-312/80-29.

(14 pages) PDR: 8012120248 6.

1/22/81 Memo from J. Sniezek to Regions I-V, Independent Measurement of RCS Leak Rates.

(17 pages) PDR: 810325053 7.

6/23/81 Memo from Woodruff to J. Chung and others, Reactor Coolant Leakage Calculations.

(7 pages) PDR: 8107160213 8.

5/28/82 LER 82-013 filed by Southern California Edison Company.

(1 page)

PDR:

8206070325 9.

8/6/82 LER 82-048 filed by Southern California Edison Company.

(1 page)

PDR: 8208180031 10.

10/27/82 Memo from Jordan to Bassett, Portable Computers for the Independent Measurement Program.

(3 pages) PDR: 8301100013

-11.

11/19/82 LER 82-134 filed by Southern California Edison Company.

(1 page)

PDR:

8212070293/ADOCK/50-361S 12.

11/19/82 LER 82-137 filed by Southern California Edison Company.

(1 page)

PDR: 8212070294/AD0CK/50-361S 13.

3/30/83 Memo from Stello to Cumings regarding Hartman's allegations.

PDR:

8304120740 14.

3/31/83 LER 83-029 filed by Southern California Edison Company.

(1 page)

PDR: 8304110704

15. 5/19/83 Memo from Dircks to the Comissioners, regarding an inspection report and~ review effort to revalidate the NRC staff position regarding the Hartman allegations.

PDR: 8305240332

h

~. '.

/

, 16.

5/27/83 Letter from Chairman Palladino to D0J about proceeding with the NRC investigation.

PDR:

8310200038 17.

5/31/83 Memo from Gilinsky-to Dircks regarding Hartman allegations and related matters.

PDR:

8306090339 18.

6/3/83 Memo to H. Plaine from T. Martin with two boxes of records l

pertaining to Mr. Hartman's allegations. PDR: 8410180190/ADOCK/

50-289G 19.

8/12/83 LER 83-049 filed by Southern Edison Company.

(3pages)

PDR: 8308220120/ADOCK/50-362S 20.

7/29/83 Letter from Senator Spector to Chairman Palladino regarding reopening the record.

PDR: 8308030310 21.

11/7/83 Memo from DeYoung to Dircks, Examinations of Reactor Coolant System Leak Rate Testing at Rancho Seco and Davis-Besse.

(21pages) PDR: 8311150481 22-28.

Inspection Reports:

50-316/81-30 PDR:

811280376

[

59-295/81-30, 50-304/81-28 PDR: 8202020173 50-255/81-29 PDR:

8202170232 50-346/81-17 PDR:

8110270470 50-266/81-18,50-301/81-20 PDR: 8111060690 50-305/81-19 PDR:

8111110716 50-305/82-07 PDR:

8203310253 l

A m_

4 KAYE, SCHOLER, FIERMAN, HAYS & HANDLER 1575 EYE STREET, N. W.

[l.*,Y.. I c'1'r WA5HINGTON, D.C. 2ooo5

...c [ci'rl !!s'I[I.,o.

. 7.." g,gg,,

......u..

(2o2) 783-'2oo j

, ,, "',"lll% ',,

December 12, 1983

'* ' :: Tl,""*J'/,',

taos, ess sisi sus Larsevec esoone

]

I FREEDOM OF INFORMATION Ms. Patricia G. Norry ACT REQUEST Director, Office of Administration

[Qg _,g.,yp

'U.S.

Nuclear Regulatory Commission h h/J-/j-/J Washington, D.C.

20555 Re:

Freedom of Information Request

Dear Ms. Norry:

This is to request the disclosure of copies of the fol-

' lowing materials available from your agency under the Freedom of Information Act (FOIA), 5 U.S.C. S 552, and the implementing regulations of the Nuclear Regulatory Commission (NRC), 10 C.F.R. Part 9, Subpart A:

(1) (a)

Inspection reports, memoranda, analyses, and other documents referring or relating to inspections by the Office of Inspection and Enforcement of the NRC of pressurized water reactor nuclear facilities regarding reactor coolant system leak rate tests, procedures, or leakage detection systems or measurements, or procedures, systems or tests for doing so; and recording of results and other data thereon.

(b)

Documents reflecting the NRC or NRC staff's reaction, review, follow-up, unresolved items, response to, or recommendations regarding the inspections, inapection reports and other documents referred to in the preceding paragraph.

(2)

Documents reflecting the NRC or NRC's staff's reaction, review, follow-up, unresolved items, response to, or recommendations regarding the following inspections or reports:

(a) the inspections conducted July 9-11, 1980 of Alabama Power Company's Farley nuclear facility; (b).the inspections conducted during November 24, 1981, January 4, 1982, and January 25-29, 1982 at the Beaver Valley plant of Duquesne Light Company; (c) the inspections conducted on February 13-16, 1978 of Arkansas Nuclear One; and O u m en er /h m q /

VI P JU O W o uw ~

(

f.

~'

KAYE, bCHoLER, flERM AN, HAYS & HANDLER Ms. Patricia G. Norry December-12, 1983 (d) the License Event Report filed by Sacramento Utility District for its Rancho Seco plant dated February 11, 1979, event date January 12, 1979, including the NRC's response, review, and follow-up thereto.

In the event that any portion of this request is denied or any documents or portions of documents are withheld or deleted, I request an itemizei, indexed inventory of each document or portion of a docunient which is responsive to my FOIA request' and which NRC asserts to be exempt from disclosure.

This inventory should, in accordance with Vaughn v. Rosen, 484 F.2d 820 (D.C. Cir. 1973), cert. denied, 415 U.S.

979 (1974),

include a detailed statement of the reason for withholding each document from disclosure or for deleting information in a document that is disclosed.

To expedite this request, I would be willing to discuss specific instances.of deletion or exemption claims in advance of a final decision by the NRC.

I promise to pay all reasonable charges incurred under NRC regulations for search and copying of these documents upon presentation of an invoice along with the furnished documents.

If the total charges will exceed $1,000, please advise me of the estimated expense before it is incurred.

As provided in the FOIA, I look forward to receiving your reply within ten working days.

Sincerely, D'

{-*, '\\ M1

(

%_) H Thomas JW Madden l

l TJM:sm

)

l I

I 1

e KAYE, SCHOLER, FIERMAN, HAYS & HANDLER 1575 EYE STREET, N. W.

.'d*=Y

<'7v'c WASHINGTON. D.C. 2ooo5

. cllcYrl NE.

~c ~, vo,~;,;;"

-c mc

.c-o -

r202) 7e3-iaoo

,,, gc o-.c g

~:'?."J.T","I..U.. E..

' :: *f,'.". .',.;."*A me.

n.

... m,...

December.27, 1983 FREEDOM OF INFORMATION ACT REQUEST Ms. Patricia G. Norry Director, Office of Administration

[g gg U.S. Nuclear Reculatory Commission Washington, D.C.

20555 Re:

Freedom of Information Act Request

Dear Ms. Norry:

This is to request the disclosure of copies of the following materials available from your agency under the Freedom of Inrormation Act (FOIA), 5 U.S.C.

S 552, and the implementing regulations of the Nuclear Regulatory Commission (NRC), 10 C.F.R. Part 9, Subpart A.:

All documents referring to or arising out of inspections of the Three Mile Island Nuclear Station, either Unit 1 or Unit 2, by the Office of Inspection and Enforcement of the NRC or by any other branch of the NRC regarding tests, procedures, practices, or systems for the detection of measurement of reactor coolant system leakage, or regarding compliance with regulatory or other require-ments concerning record keeping or reporting requirements relating thereto.

Said documents should include documents in the files of Mr. Don Haverkamp and documents from the Office of Inspection and Enforcement, Region I, reflecting any assessment, review, or follow-up of the inspections referred to in the above request.

In the event that any portion of this request is denied or any documents or portions of documents are withheld or deleted, I request an itemized, indexed inventory of each document or portion of a document which is responsive to my FOIA request and which NRC asserts to be exempt from disclosure.

This inventory should, in accordance with Vaughn v. Rosen, 484 F.2d 820 (D.C. Cir.

1973), cert. denied, 415 U.S.

979 (1974), include a detailed statement of the reason for withholding each document from disclosure or for deleting information in a document that is disclosed.

/)llh o A // /h m / 7 v~ myn

f.

n' KAYE,6 CHOLER, FIERMAN, HAYS & HANDLER Ms. Patricia G. Norry December 27, 1983 To expedite this request, I would be willing to discuss specific instances of deletion or exemption claims in advance of a final decision by the NRC.

I promise to pay all reasonable charges incurred under NRC regulations for search and copying of these documents upon presentation of an invoice along with the furnished documents.

If the total charges will exceed $1,000, please advise me of the estimated expense before it is incurred.

As provided in the FOIA, I look forward to receiving your reply within ten working days.

Sincerely, f

dJ%

4A Thomas J. Ma en TJM:csd 1

o P

I t

)

l i

j.

8 s

u KAYE, SCHOLER, FIERMAN, HAYS & HANDLER 157 5 EYE STREET, N. W.

j

."E"EU. e75:

WASHINGTON, D.C. 2 coo 5

...t.7tr7"'$2co nravoan.n ecoa,

s. t=actre nre vou (202)783-1200

8'

"'E'S ins een a i, a nc ve. oc=csnc er

~'"J::':4"..;F*

'*lt;:1.',7:

December 27, 1983 FREEDOM OF INFORMATION Ms. Patricia G. Norry ACT REQUEST Director, Office of Administration U.S. Nuclear Regulatory Commission

~7 ?f

~

Washington, D.C.

20555

/g g Re:

Freedom of Information Act Request

Dear Ms. Norry:

This is to request the disclosure of copies of the following materials available from your agency under the Freedom of Information Act (FOIA), 5 U.S.C. S 552, and the implementing regulations of the Nuclear Regulatory Commission (NRC), 10 C.F.R. Part 9, Subpart A.:

All documents in the files of, written, collected, or annotated by or under the supervision of or at the direction of J. W. Chung, D. C.

Kirkpatrick, T. A. Moslak, R. W. Woodruff, T.

T. Martin, A.

N. Fasano, D. A.

Beckman, W. M. Troskoski, of W.

J.

Lazarus relating or referring to any reports, analyses, studies, calculations, regarding tests, procedures, practices, systems, for the measurement or detection of reactor coolant

[

system leakage, determinations or estimates of errors or devia-I tions'in such procedures, practices, tests or systems.

In the event that any portion of this request is denied or any documents or portions of documents are withheld or deleted, I request an itemized, indexed inventory of each document or portion of a document which is responsive to my FOIA request and which NRC asserts to be exempt from disclosure.

This inventory should, in accordance with Vaughn v. Rosen, 484.F.2d 820 (D.C. Cir. 1973),

cert. denied, 415 U.S.

979 (1974), include a detailed statement of the reason for withholding each document from disclosure or for deleting information in a document that is disclosed.

i To expedite this request, I would be willing to discuss L

specific instances of deletion or exemption claims in advance of a final decision by the NRC.

I promise to pay all reasonable charges incurred under NRC regulations for search and copying of these documents upon presentation of an invoice along with the O / r /h 97% 1 Ih /1 /

% ] ]J J kJl YIl C l

l

.\\,-

(

( '.

j.

~

KAYE,6 CHOLER, FIERMAN, HAYS & HANDLER l

Ms. Patricia G. Norry December ~27, 1983

- furnished documents.

If the total charges will exceed $1,000, please advise me of the estimated expense before it is incurred.

As provided in the FOIA, I look forward to receiving your reply within ten working days.