October 28, 1996
Georgia Power Com)any
ATTN: Mr. C. K.
icCoy
Vice President
Vogtle Electric Generating Plant
P. O. Box 1295
Birmingham. AL 35201
!
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-424/96-10, 50-425/96-10
!
Dear Mr. McCoy:
On September 28, 1996, the Nuclear Regulatory Commission (NRC) completed an
inspection at your Vogtle Units 1 and 2 reactor facilities. The enclosed
!
report presents the results of that inspection.
i
i
During the six-week period covered by this inspection report your conduct of
activities at the Vogtle facility was generally characterized by safety-
1
conscious operations, sound engineering and maintenance practices, and
i
appropriate radiological work controls.
However, two violations were
identi fied. We are concerned with the violation involving the improperly
positioned containment isMation valve on Unit 1.
This same valve has been
the subject of two previous enforcement actions.
Further, the issue of
mispositioned valves has been the subject of previous NRC correspondence.
Additionally, we are concerned by the issues identified during inspection of
your 1mplementation of paragraph (a)(3) of the Maintenance Rule (10 CFR 50.65). The inspectors' review of this area could not conclude that your
program would be effective in preventing potentially risk significant
configurations from occurring at the Vogtle facility.
The NRC plans to
inspect this area during future inspections.
These violations are cited in the enclosed Notice of Violation (Notice), and
the circumstances surrounding the violations are described in detail in the
enclosed report.
Please note that you are required to respond to this ietter
and should follow the instructions specified in the enclosed Notice when
preparing your response.
The NRC will use your response. in part, to
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
1
[;
9611040213 961028
DR
ADOCK 050004 4
seal >
_ _ _ . _ _
. . _ . .
_
. _ _
- - _
__
_
.
_
'
1
,
'
GPC
2
l
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of
'
this letter and its enclosures will be placed in the NRC Public Document Room.
,
Sincerely.
(Original signed by Caudle A. Julian for)
Pierce H. Skinner. Chief
Reactor Projects Branch 2
Division of Reactor Projects
Docket Nos. 50-424 and 50-425
'
i
Enclosures:
1.
1
2.
Inspection Report 50-424/96-10, 50-425/96-10
.l
cc w/encls:
J. D. Woouard
1
Senior '-
+ President
Georgia ;ower Company
1
P. O. Box 1295
Birmingham. AL 35201
J. B. Beasley
'
General Manager. Plant Vogtle
Georgia Power Company
P. O. Box 1600
Waynesboro. GA 30830
J. A. Bailey
Manager-Licensing
Georgia Power Company
P. O. Box 1295
Birmingham AL 35201
Jim Hurt. Director
Consumers' Utility Counsel Division
Governor's Office of Consumer Affairs
2 M. L. King. Jr. Drive
Plaza Level - East: Suite 356
Atlanta. GA 30334-4600
i
Office of Planning and Budget
Room 615B
270 Washington Street. SW
,
,
l
Atlanta. GA 30334
1
cc w/encls cont'd:
(See page 3)
i
~
_ _ _ _ .
. _ _ . _ . _
_. _ _ _
_ _ _ _
_
_ _
_ . _
_
.
GPC
3
l
cc w/encls:
Cont'd
Office of the County Commissioner
Burke County Commission
l
Waynesboro. GA 30830
l
Harold Reheis. Director
Department of Natural Resources
205 Butler Street. SE. Suite 1252
Atlanta, GA 30334
Thomas Hill Manager
l
Radioactive Materials Program
Department of Natural Resources
'
4244 International Parkway
Suite 114
Atlanta, GA 30354
Attorney General
Law Department
132 Judicial Building
l
Atlanta. GA 30334
l
Thomas P. Mozingo
l
Manager of Nuclear Operations
Oglethor)e Power Corporation
2100 E.
Exchange Place
.
Tucker. GA 30085-1349
l
l
Charles A. Patrizia. Esq.
'
Paul. Hastings Janofsky & Walker
10th Floor
1299 Pennsylvania Avenue
Washington, D. C.
20004-9500
Steven M. Jackson
Senior Engineer - Power Supply
Municipal Electric Authority
of Georgia
'
1470 Riveredge Parkway NW
!
Atlanta GA 30328-4684
Distribution w/ encl:
P. Skinner. RII
R. Wright. RII
W. P. Kleinsorge. RII
M. E. Ernstes. RII
G. Hallstrom. RII
L. Wheeler. NRR
PUBLIC
,
'
Distribution w/encls cont'd:
(See Page 4)
I
.
.
'
GPC
4
>
Distribution w/encls:
Cont'd
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Comission
8805 River Road
Waynesboro, GA 30830
1
1
I
J
!
l
Drricr
NDP DSSA
NRR USSA
Pff-DRD
Rff DPP
Rff DRD
Rff DRP
SIGNATURE
r.gn/L
C.
A
Teutcod
faseod
"TiELEceeJ
PL'Luced
GewW
rer9Wd
6e WW
ER 1Auf
E t Rkjul
FoC EkA4/
NAME
JShackleford.dka
RFrahm
EChristnot
TRoss
C00le
MWidmann
DATE
10 / 2 8 / 96
10 / 2R / 96
10 / 2 8 / 96
10 / 2 8 / 96
10 / 2 8 ! 96
10 / 2 9 / 96
COPY?
[S)
NO
h
NO
(iEfj
N0
(E'S)
NO
YES
@
dED NO -
I
n
PIbbk
Drrier
pff Dpp
SIGNATURE ggy
NAME
RWright
PSk nnar
DATE
10 / 2 5 / 96
ID_/ h / %
10 /
/ 96
10 /
/ 96
10 /
/ 96
10 /
/ 96
COPV7
(9ED
NO
[ES)
NO
YES
NO
YES
NO
YES
NO
YES
NO
SULUM'Ni NAM-.
A: W90-10
UitlCIAL ktLORD LUPY
t
i
_, _
_ _ - .
, , .
- - - _
_ . - , . , _ _ .-