.j

October 28, 1996

Georgia Power Com)any

ATTN: Mr. C. K.

icCoy

Vice President

Vogtle Electric Generating Plant

P. O. Box 1295

Birmingham. AL 35201

!

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-424/96-10, 50-425/96-10

!

Dear Mr. McCoy:

On September 28, 1996, the Nuclear Regulatory Commission (NRC) completed an

inspection at your Vogtle Units 1 and 2 reactor facilities. The enclosed

!

report presents the results of that inspection.

i

i

During the six-week period covered by this inspection report your conduct of

activities at the Vogtle facility was generally characterized by safety-

1

conscious operations, sound engineering and maintenance practices, and

i

appropriate radiological work controls.

However, two violations were

identi fied. We are concerned with the violation involving the improperly

positioned containment isMation valve on Unit 1.

This same valve has been

the subject of two previous enforcement actions.

Further, the issue of

mispositioned valves has been the subject of previous NRC correspondence.

Additionally, we are concerned by the issues identified during inspection of

your 1mplementation of paragraph (a)(3) of the Maintenance Rule (10 CFR 50.65). The inspectors' review of this area could not conclude that your

program would be effective in preventing potentially risk significant

configurations from occurring at the Vogtle facility.

The NRC plans to

inspect this area during future inspections.

These violations are cited in the enclosed Notice of Violation (Notice), and

the circumstances surrounding the violations are described in detail in the

enclosed report.

Please note that you are required to respond to this ietter

and should follow the instructions specified in the enclosed Notice when

preparing your response.

The NRC will use your response. in part, to

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

1

[;

9611040213 961028

DR

ADOCK 050004 4

seal >

_ _ _ . _ _

. . _ . .

_

. _ _

- - _

__

_

.

_

'

1

,

'

GPC

2

l

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of

'

this letter and its enclosures will be placed in the NRC Public Document Room.

,

Sincerely.

(Original signed by Caudle A. Julian for)

Pierce H. Skinner. Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket Nos. 50-424 and 50-425

License No. NPF-68 and NPF-81

'

i

Enclosures:

1.

Notice of Violation

1

2.

Inspection Report 50-424/96-10, 50-425/96-10

.l

cc w/encls:

J. D. Woouard

1

Senior '-

+ President

Georgia ;ower Company

1

P. O. Box 1295

Birmingham. AL 35201

J. B. Beasley

'

General Manager. Plant Vogtle

Georgia Power Company

P. O. Box 1600

Waynesboro. GA 30830

J. A. Bailey

Manager-Licensing

Georgia Power Company

P. O. Box 1295

Birmingham AL 35201

Jim Hurt. Director

Consumers' Utility Counsel Division

Governor's Office of Consumer Affairs

2 M. L. King. Jr. Drive

Plaza Level - East: Suite 356

Atlanta. GA 30334-4600

i

Office of Planning and Budget

Room 615B

270 Washington Street. SW

,

,

l

Atlanta. GA 30334

1

cc w/encls cont'd:

(See page 3)

i

~

_ _ _ _ .

. _ _ . _ . _

_. _ _ _

_ _ _ _

_

_ _

_ . _

_

.

GPC

3

l

cc w/encls:

Cont'd

Office of the County Commissioner

Burke County Commission

l

Waynesboro. GA 30830

l

Harold Reheis. Director

Department of Natural Resources

205 Butler Street. SE. Suite 1252

Atlanta, GA 30334

Thomas Hill Manager

l

Radioactive Materials Program

Department of Natural Resources

'

4244 International Parkway

Suite 114

Atlanta, GA 30354

Attorney General

Law Department

132 Judicial Building

l

Atlanta. GA 30334

l

Thomas P. Mozingo

l

Manager of Nuclear Operations

Oglethor)e Power Corporation

2100 E.

Exchange Place

.

Tucker. GA 30085-1349

l

l

Charles A. Patrizia. Esq.

'

Paul. Hastings Janofsky & Walker

10th Floor

1299 Pennsylvania Avenue

Washington, D. C.

20004-9500

Steven M. Jackson

Senior Engineer - Power Supply

Municipal Electric Authority

of Georgia

'

1470 Riveredge Parkway NW

!

Atlanta GA 30328-4684

Distribution w/ encl:

P. Skinner. RII

R. Wright. RII

W. P. Kleinsorge. RII

M. E. Ernstes. RII

G. Hallstrom. RII

L. Wheeler. NRR

PUBLIC

,

'

Distribution w/encls cont'd:

(See Page 4)

I

.

.

'

GPC

4

>

Distribution w/encls:

Cont'd

NRC Senior Resident Inspector

U.S. Nuclear Regulatory Comission

8805 River Road

Waynesboro, GA 30830

1

1

I

J

!

l

Drricr

NDP DSSA

NRR USSA

Pff-DRD

Rff DPP

Rff DRD

Rff DRP

SIGNATURE

r.gn/L

C.

A

Teutcod

faseod

"TiELEceeJ

PL'Luced

GewW

rer9Wd

6e WW

ER 1Auf

E t Rkjul

FoC EkA4/

NAME

JShackleford.dka

RFrahm

EChristnot

TRoss

C00le

MWidmann

DATE

10 / 2 8 / 96

10 / 2R / 96

10 / 2 8 / 96

10 / 2 8 / 96

10 / 2 8 ! 96

10 / 2 9 / 96

COPY?

[S)

NO

h

NO

(iEfj

N0

(E'S)

NO

YES

@

dED NO -

I

n

PIbbk

Drrier

pff Dpp

SIGNATURE ggy

NAME

RWright

PSk nnar

DATE

10 / 2 5 / 96

ID_/ h / %

10 /

/ 96

10 /

/ 96

10 /

/ 96

10 /

/ 96

COPV7

(9ED

NO

[ES)

NO

YES

NO

YES

NO

YES

NO

YES

NO

SULUM'Ni NAM-.

A: W90-10

UitlCIAL ktLORD LUPY

t

i

_, _

_ _ - .

, , .

- - - _

_ . - , . , _ _ .-