January 31, 1997 E. Thomas Boulette, Ph.D.
Boston Edison Company Pilgrim Nuclear Power Station RFD #1, Rocky Hill Road Plymouth, MA 02360-5599
SUBJECT:
10 CFR 50.54(p) SUBMITTAL FOR PILGRIM NUCLEAR POWER STATION
Dear ^ Boulette:
This setter is in response to your correspondence of April 3,1996 regarding changes to the Pilgrim Nuclear Power Station Guard Training and Qualification Plan identified as Revision 10, submitted under the provisions of 10 CFR 50.54(p).
Based on your determination that the changes do not decrease the overall effectiveness of your security plan and after limited review of the changes, no NRC approval is required for some of the changes, in accordance with 50.54(p). Implementation of these changes will be subject to inspection to confirm that the changes have not decreased the overall effectiveness of your security plan.
However, one change appears to be inconsistent with the criteria of 10 CFR 50.54(p).
That change involves the definition of Annual that was added to Appendix A of the Plan.
Your definition states " Annual - Each requirement shall be performed within the specified interval with a maximum allowable extension not to exceed 25% of the specified interval."
To provide reasonable flexibility consistent with that existing in technical specifications (tech specs), we will approve the use by licensees of generic surveillance requirements for periodic testing as found in Section 4.0.2(a) and (b) of generic tech specs. These specifications are inco.porated in the operating licenses in the same manner as our security plans, and are authorized in 10 CFR 50.34(b)(6)(vi) and 10 CFR 50.36(b).
The acceptable language contained in the above reference is as follows:
"Each surveillance requirement shall be performed within the specified time interval with:
a.
A maximum allowable extension not to exceed 25 percent of the surveillance interval, but b.
The combined time interval for any three consecutive surveillance intervals shall not exceed 3,25 times the specified surveillance interval."
A I
F D
/
E. Thomas Bouletter Ph.D. You should follow your previously approved plan with respect to the requirements to perform certain requirements annually until you resubmit a plan revision to reflect the above language.
The enclosure to your letter contained Proprietary information of a type specified in 10 CFR 2.790 and will be withheld from public disclosure. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Pub!!c Document Room.
Mr. Gregory Smith was the reviewer for this matter. Should there be any questions, he ccn be contacted at (610) 337-5263.
Sincerely, ORIGINAL SIGNED BYi Richard R. Keimig, Chief Emergency Preparedness and Safeguards Branch Division of Reactor Safety Docket No.: 50-293 l
l cc Mr. Leon J. Olivier Mrs. Nancy Desmond l
Vice President of Nuclear Manager, Regulatory Affairs Dept.
l Operations and Station Director Pilgrim Nuclear Power Station l
Pilgrim Nuclear Power Station RFD #1, Rocky Hill Road
)
RFD #1, Rocky Hill Road Plymouth, MA 02360 Plymouth, MA 02360 l
Mr. David F. Tarantino Chairman, Duxbury Board of Selectmen Nuclear Information Manager Town Hall Pilgrim Nuclear Power Station 878 Tremont Street RFD #1, Rocky Hill Road Duxbury, MA 02332 Plymouth, MA 02360 l
Chairman, Board of Selectmen Ms. Kathleen M. O'Toole 11 Lincoln Street Secretary of Public Safety Plymouth, MA 02360 Executive Office of Public Safety One Ashburton Place Boston, MA 02108
i j
E. Thomas Boulette, Ph.D. Office of the Commissioner Mr. David Rodham, Director Massachusetts Department of Massachusetts Emergency Environmental Protection Management Agency One Winter Street 400 Worcester Road Boston, MA 02108 PO Box 1496 Framingham, MA 01701-0317 ATTN: James Muckerheide Office of the Attorney General Chairmen, Citizens Urging One Ashburton Place Responsible Energy 20th Floor PO Box 2621 Boston, MA 02108 Duxbury, MA 02331 Mr. Robert M. Hallisey, Director Citizens at Risk Radiation Control Program PO Box 3803 Massachusetts Department of Plymouth, MA 02361 i
Public Health 305 South Street Boston, MA 0219 Mr. Jeffrey Keene W. S. Stowe, Esquire Regulatory Affairs Department Manager Boston Edison Company Boston Edison Company 800 Boylston Street 600 Rocky Hill Road 36th Floor Plymouth, MA 02360-5599 Boston, MA 02199 Ms. Jane Fleming Chairman 8 Oceanwood Drive Nuclear Matters Committee Duxbury, MA 02332 Town Hall 11 Lincoln Street Plymouth, MA 02360 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company PO Box 426 Ludlow, MA 01056-0426
E. Thomas Boulette, Ph.D. DISTRIBUTION:
L. Cunningham, NRR/PSGB (OWFN 11 E22)
Document Control Desk, Official Record Copy - RID RG01 Region 1 Docket Room w/ concurrence (w/o SGI)
Region i Safeguards Licensing File (TACS UO1073)
Region i Safeguards Licensing Serial File Chief, RPB-5, Rl/DRP (w/o SGI)
NRC Resident inspector PUBLIC Nuclear Safety Information Center (NSIC)
DOCUMENT NAME: S:\\SRV ST\\PILGT&Q.R10 Ta r.c.iv.. copy or tai. oocurn.nt. indic.t.
tn.
- s c - copy witnout.ttaenm.ntioncio.ur.
r r - Copy with.ttachm.nt/enclosur.
N* = No copy 0FFICE DRS/RI l\\ D($/@
l DRS/RI
/lp l
l NAME CMiskey /l/Tlhi WMjth-RKeimig /
DATE 01/31/97 0] pal /97 01/7/ /9V 01/
/97 01/
/97 0FFICIAL RECORD / COPY