Forwards Insp Rept 50-333/96-08 on 970104 & NOV
ML20134E362
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/30/1997
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20134E364 List:
References
NUDOCS 9702060181
Download: ML20134E362 (4)


See also: IR 05000333/1996008

Text

.

-

--

. .

-

- _ . _ .

--

'O

,

,

,

January 30, 1997

.

I

Mr. Michael J. Colomb

Plant Manager

New York Power Authority

James A. FitzPatrick Nuclear Power Plant

Post Office Box 41

Lycoming, NY 13093

'

SUBJECT:

NRC INTEGRATED INSPECTION 50-333/96-08 AND NOTICE OF VIOLATION

l

Dear Mr. Colomb:

On January 4,1997 the NRC completed an inspection at your FitzPatrick Power Plant.

The enclosed report presents the results of that inspection.

Overall, plant operation and major outage activities were conducted safely and were well

l

controlled. However, personnel errors observed during tN' 'nspection, indicate that

continued strong attention and focus on improving human p;armance is warranted. For

,

example, a personriel error during surveillance on reactor water level instrumentation

resulted in a reactor protection system actuation, assumptions made during high pressure

coolant injection system maintenance resulted in the improper installation of hydraulic

control system lines, and improper radiological control practices by operators had the

potential to result in uncontrolled radioactive material. The NRC notes that you are in the

process of implementing corrective actions to address human performance issues as a

,

result of a recent violation.

Based on the results of this inspection, the NRC concluded that your extended operation on

j

November 7,1995, of all four residual heat removal pumps in the suppression pool cooling

i

mode, prior to performing n formal safety evaluation, was a violation of 10 CFR 50.59.

You are required to rest ad to this letter and should follow the instructions specified in the

enclosed Notice of Violation (Notice) when preparing your response. In your response, you

should document the specific actions taken and any additional actions you plan to prevent

recurrence. Your response may reference previous docketed correspondence if the

correspondence adequately addresses the required response. Please include as part of

your response those corrective actions you intend to take to understand the broader

implications of the violation. After reviewing your response to this Notice, including your

proposed corrective actions and the results of future inspections, the NRC will determine

whether further NRC enforcement action is r. cessary to ensure compliance with NRC

,

regulatory requirements.

I

l

9702060181 97o13o

PDR

ADOCK 05000333

G

PDR

OFFICIAL RECORD COPY

IE:01

..

-_ -

,

__

.

o

.

Michael J. Colomb

2

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosures, and your response will be placed in the NRC Public Document Room (PDR).

To the extent possible, your response should not include any personal privacy, proprietary,

or safeguards information so that it can be placed in the PDR without redaction.

Sincerely,

Original Signed by:

Curtis J. Cowgill, Chief

Projects Branch 2

Division of Reactor Projects

Docket No.: 50-333

License No.: DPR-59

Enclosures:

1.

Notice of Violation

2.

Inspection Report 50-333/96-08

cc w/encls

C. D. Rappleyea, Chairman and Chief Executive Officer

R. Schoenberger, President and Chief Operating Officer

W. J. Cahill, Jr., Chief Nuclear Officer

i

H. P. Salmon, Jr., Vice President of Nuclear Operations

W. Josiger, Vice President - Engineering and Project Management

J. Kelly, Director - Regulatory Affairs and Special Projects

i. Dougherty, Vice President - Nuclear Engineering

R. Deasy, Vice President - Appraisal and Compliance Services

R. Patch, Director - Quality Assurance

G. C. Goldstein, Assistant General Counsel

,

C. D. Faison, Director, Nuclear Licensing, NYPA

'

T. Morra, Executive Chair, Four County Nuclear Safety Committee

Supervisor, Town of Scriba

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

P. Eddy, Director, E'ectric Division, Department of Public Service, State

of New York

G. T. Goering, Consultant, New York Power Authority

J. E. Gagliardo, Consultant, New York Power Authority

F. William Valentino, President, New York State Energy Research

and Development Authority

J. Spath, Program Director, New York State Energy Research

and Development Authority

.

'

,

.

i

Michael J. Colomb

3

Distribution w/encis:

D. Screnci, PAO (1)

Nuclear Safety information Center (NSIC)

PUBLIC

NRC Resident inspector

Region I Docket Room (with concurrences)

,

'

R. Correia, NRR

R. Frahm, Jr., NRR

i

L. Cunningham, NRR

D. Barss, NRR

!

C. Cowgill 7aP

R. Barkley, AP

3

<.

j

R. Junod, DRP

j

,

j

Distribution w/encls: (VIA E-MAIL)

[

W. Dean, OEDO (WMD)

l

f

S. Bajwa, NRR

3

K. Cotton, NRR

D. Hood, NRR

!

M. Campion, RI

Inspection Program Branch, NRR (IPAS)

i

!

,

t

!

.

!

i

!

?

,

!

!

!

t

DOCUMENT NAME: G:\\ BRANCH 2\\lR96-08.FTZ

}

'Sas previous concurrences

t

Ta receive e copy of this docurn6nt. Indicate in the boa:

"C" = Copy without attachment / enclosure

'E" = Copy with attachment / enclosure

'N' = No copy

}

OFFICE

  • Rl/DRP

l

'Rl/DRP

Rl/DRP//G l

NAME

GHunegs

RBarkley

CCowdflf

DATE

01/ /97

01/ /97

01/7)/97

i

OFFICIAL RECORD COPY

l

!

i

,

I

i

!

,

.

.

.

-

.

-.,.m.

__

___

_ _ _ _ . . _ _ .

~.

. _ _ _

_

._. _.

_

)

.

,

.

Michael J. Colomb

3

Distribution w/encis:

D. Screnci, PAO (1)

Nuclear Safety Information Center (NSIC)

PUBLIC

NRC Resident inspector

Region i Docket Room (with concurrences)

R. Correia, NRR

R. Frahm, Jr., NRR

L. Cunningham, NRR

D. Barss, NRR

C. Cowgill, DRP

R. Barkley, DRP

R. Junod, DRP

Distribution w/encis: (VIA E-MAIL)

W. Dean, OEDO (WMD)

S. Bajwa, NRR

K. Cotton, NRR

D. Hood, NRR

M. Campion, RI

l

Inspection Program Branch, NRR (IPAS)

l

1

i

DOCUMENT NAME: G:\\ BRANCH 2\\lR96-08.FTZ

To receive a copy of this document. Indicate in the boa: "C" = Copy without attachmsut/ enclosure

'E' = Copy with attachment / enclosure

"N" = No copy

l OFFICE

Rl/DRP

Q t)l

Rl/DRP

G j

Rl/DRP

f

lNAME[ pHunegs pj p

RBarkley tfj)/j

CCowgill

i

lDATE &O1ryl/97 Iff'

01/ 7797 J

' ~

01/ /97

7

OFFICIAL RECORD COPY