ML20134E256

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-455/85-24 on 850708-12.No Violations Noted
ML20134E256
Person / Time
Site: Byron Constellation icon.png
Issue date: 08/15/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20134E259 List:
References
NUDOCS 8508200109
Download: ML20134E256 (2)


See also: IR 05000455/1985024

Text

.

.

AUG 151985

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. A. S. Gautam

of this office on July 8 through 12, 1985, of activities at Byron Station,

Unit 2, authorized by NRC License No. CPPR-131 and to the discussion of

our findings with Mr. M. E. Lohmann at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~

. qind Signed by'U. J. I!arrison

,

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Report

No. 50-455/85024(DRS)

See Attached List For Distribution

1

,

l

8508200109 850815

PDR ADOCK 05000455 l

G PDR

d 50f lll

.

..

.

Commonwealth Edison Company 2

AUG ' 51985

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

W. Paton, ELD

L. Olshan, NRR LPM

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. 5tevens, NRR

,

.

RII RIII R

A9 .-

Gautam/kja lliams l_erch ison

08/15/85 4/if g/sf

cefff