ML20134E207
| ML20134E207 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/04/1997 |
| From: | ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20134E197 | List: |
| References | |
| NUDOCS 9702060081 | |
| Download: ML20134E207 (2) | |
Text
_
i
.4 J
i 4
1 f
di lI
,P T
+
t, 1
E 1
7' i
4
]
NPF-38-188 ATTACHMENT i
j.
Revised Page 4
4 l
i I
i i
i I
i 9702060081 970204 PDR ADOCK 05000382<
P PDR
_ ~
CONTAINMENT LEAKAGE RATE TESTING PROGRAM (Continued)
Leakage rate acceptance criteria are:
1 a.
Containment leakage rate acceptance criteria is s 1.0 La. During the first unit startup following each test performed in accordance with this program, the leakage rate acceptance criteria are s 0.60 :.;, Tor the Type B and Type C tests and s 0.75 La for Type A tests.
b.
Air lock acceptance criteria are:
1.
Overall air lock leakage rate is s 0.05 La when tested at 2 Pa.
\\
l 2.
Leakage rate for each door is s 0.01 La when pressurized to 210 psig.
1 c.
Combined bypass leakage rate acceptance criteria is s 0.06 La when tested at 2 Pa.
1 d.
Containment purge valves with resilient seals acceptance criteria is s 0.06 La when tested at 2 Pa.
The provisions of Specification 4.0.2 do not apply to the test frequencies specified in the Containment Leakage Rate Testing Program.
The provisions of Specification 4.0.3 are applicable to the Containment Leakage Rate Testing Program.
i i
WATERFORD - UNIT 3 6-24 AMENDMENT NO. 68,94, 416
-