ML20134E089

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-245/85-16 & 50-336/85-22 on 850603-07 & 12-17 & Notice of Violation
ML20134E089
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/09/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20134E092 List:
References
NUDOCS 8508190610
Download: ML20134E089 (2)


See also: IR 05000245/1985016

Text

. .

Jhs-

1

AUG 091985

-

(

Docket Nos. 50-245 License Nos. OPR-21

! 50-336 DPR-65

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P.O. Box 270 .

Hartford, Connecticut 06141-0270

Gentlemen:

l Subject: Inspection Report Nos. 50-245/85-16 and 50-336/85-22

This refers to the routine inspection conducted by S. D. Kucharski of this

office on June 3-7, 1985 and June 12-17, 1985, at the Millstone Nuclear Power

Station, Unit I and Unit II, Waterford, Connecticut, of activities authorized

by NRC License Nos. DPR-21 and DPR-65 and to the discussions of our findings

held by S. Kucharski with Mr. W. Romberg and other members of your staff at

the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the '

inspection consisted of selective examinations of procedures and representative

, records, interviews with personnel, and observations by the inspector.

! Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed. herewith as Appendix A. This violation has been

categorized by severity level in accordance-with the revised NRC Enforcement

Policy (10 CFR 2, Appendix C) publishe'd in the Federal Register Notice (49 FR

8583) dated March 8, 1984. You are required to respond to this letter and in

J preparing your response, you should follow the instructions in Appendix A.

[

l The responses directed by this letter and the accompanying Notice are not

l subject to the clearance procedures of the Office of Management and Budget j

t

as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

I

l Original Signea By:

LeeP.settenhauses

Stewart D. Ebneter, Director

l Division of Reactor Safety '

i I

Enclosures:

'

!

l 1. Appendix A, Notice of Violation / I

l

.

2. NRC Region I Inspection Report Nos. 50-245/85-16 & 50-336/85-22 1g(

0FFICIAL RECORD COPY IR MILLSTONE 3 05-16 - 0001.0.0 l

07/25/85

8508190610 850009

's PDR ADOCK 05000245

-

.

.

Northeast Nuclear Energy Co. 2

., cc w/ enc 1:

E. J. Mroczka, Vice President, Nuclear Operations

W. D. Romberg, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector -

State of Connecticut

i

bec w/ enc 1:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enc 1)

E. C. McCabe, Chief, Section #3B, RPB #3, DRP

i

t

4

i

l

'

RI:DRSY+[if f:DRSkW

RI

f

.)RP k

fB

RI:DRS

&_

RI:DRS

Kucharski/mmb Johnson Eselgroth

Betgusen gr

,

OFFICIAL RECORD COPY IR MILLSTONE 3 85-16 - 0001.1.0

07/25/85

k________________.____________________

- __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _