e VIHOINIA ELECTHIC AND Powna COMPANY e
IIICHMOND,VIHOINIA 20261 January 29, 1997 I
United States Nuclear Regulatory Commission Serial No.97-056 Attention: Document Control Desk NL&OS/ETS Washington, D.C. 20555 Docket No.
50-338 50-339 License No.
NPF-4 NPF-7
Dear Sir:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 ANNUAL STEAM GENERATOR TUBE INSERVICE INSPECTION
SUMMARY
REPORT Pursuant to Technical Specifications 6.9.1.5.b for North Anna Units 1 and 2, Virginia Electric and Power Company is submitting the steam generator tube inservice j
inspections performed during the 1996 Unit 1 and 2 refueling outages.
This letter does not establish any new commitments. Should you have any questions or require additional information, please contact us.
Very truly yours, S. P. Sarver, Acting Manager Nuclear Licensing and Operations Support Attachments cc:
U. S. Nuclear Regulatory Commission Region ll 101 Marietta Street, N. W.
Suite 2900
)
Atlanta, Georgia 30323 05005S Mr. R. D. McWhorter
/
NRC Senior Resident inspector I
North Anna Power Station BON 9702050424 970129 PDR ADOCK 05000338 G
ATTACHbGENT 1 NORTH ANNA UNIT 1, FEBRUARY 1996 RFO STEAM GENERATOR "B",
EDDY CURRENT EXAMINATION
SUMMARY
In steam generator "B" 1798 tubes.were inspected full length with bobbin probes. Three hundred twenty four tubes were also inspected at the hot leg " top of tubesheet" transition with RPC probes.
No reportable indications were revealed by this inspection. There are no plugged tubes in this steam generator.
l l
-i
4 ATTACEMENT 2 i
NORTH ANNA UNIT 2, SEPTEMBER 1996 RFO l
STEAM GENERATORS "B" AND "C",
EDDY CURRENT EXAMINATION
SUMMARY
In steam generators "B"
and "C",
1796 tubes were inspected full I
length with bobbin probes in each generator.
One hundred sixty two j
tubes were also inspected at the hot leg " top of tubesheet" transition with RPC probes in each generator.
No reportable indications were revealed by this inspection. There are no plugged i
tubes in these steam generators.