lo-Ul3 f *E%
g 4
UNITED STATES s
,s j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 400) y,,,
January 23, 1997 l
Dr. Ralph J. Reda Manager, Fuels and Facility Licensing General Electric Company P.O. Box 780, MC J26 Wilmington, NC 28402
SUBJECT:
POSTPONEMENT OF FREE RELEASE OF CaF ACCUMULATION AREA ADJACENT TO PROCESSLAGOONSYSTEM(TACNO.L309b6)
Dear Dr. Reda:
The Fuel Cycle Licensing Branch staff has completed its review of your September 13 and October 24, 1996, requests to pos.tpone decommissioning of the Car, accumulation area, adjacent to the process lagoon system.
You supported th/ requests by stating the area is adjacent to an operating lagoon system and by implication could become recontaminated.
Based on our review, we cannot grant your request for delay because you have not adequately justified such delay in accordance with NRC requirements in 10 CFR 70.38(f). An adequate justification would have demonstrated that the delay is in the public interest by addressing factors described in the Decommissioning Timeliness rule (59 FR 36030] and other relevant factors such as those listed in S 70.38(1).
These factors include:
(1) record of regulatory compliance; (2) maintenance and monitoring of the area; (3) decommissioning financial assurance for the area; (4) plans for resuming operations of the area; (5) availability of waste disposal facilities; (6) reducticn in dose or waste volume due to radioactive decay; (7) technical feasibility of decomissioning; (8) regulatory requirements of other government agencies; (9) lawsuits; (10) groundwater treatment and restoration activities; or (11) other factors that demonstrate a clear public interest in delaying decommissioning, such as prompt decommissixing could result in more environmental harm than deferred decommissioning.
Your indication that the area may be recontaminated does not provide this demonstration.
Accordingly, within 60 days from the date of this letter, submit a request for delay of decommissioning or an alternative schedule for decommissioning that addresses the relevant factors listed in 10 CFR 70.38(i), or provide a decommissioning plan for the area within 12 months of your notification (i.e.,
no later than September 13, 1997.)
NRCIRE W W
/o gogy 9702050377 970123
( Fo6 PDR ADOCK 0700 3
Dr. Ralph J. Reda 2
Please reference the above TAC No. on future correspondence related to this matter.
If you have any questions, regarding this matter, please contact Mike Lamastra of my staff at (301) 415-8139.
Sincerely, Original signed by: Madams for Michael F. Weber, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-1113 License SNM-1097 i
DISTRIBUTION:
(Control No. 400D)
Docket 70-1113 PUBLIC NRC' File Center Region II NMSS r/f FCSS r/f FCLB r/f CBassett, RII
[G:\\geltr,m12]
O-Eh FCLB FCLB s(b2$2 C_. FCLB Ch 0FC FCLB xv-NAME MLamNtra PShea
_nf o%
GPangbuY MWeber '[h/
DATE 1/ \\h/97 1//h/9f 1/8//97 1/2 3 /97 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY l
I l
{
4 Dr. Ralph J. Reda 2
Please reference the above TAC No. on future correspondence related to this matter.
If you have any questions regarding this matter, please contact Mike Lamastra.of my staff at (301) 415-8139.
l Sincerely, hfil/
A$ill.
0 t' Ih'
~
Michael F. Weber, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-1113 License SNM-1097 i