AUG 131985
.
In Reply Refer To:
Docket: 50-267/85-16
Public Service Company of Colorado
ATTN:
0. R. Lee, Vice President
Electric Production
P. O. Box 840
Denver, Colorado 80201-0840
Gentlemen:
This refers to the inspection conducted by Mr. M. E. Skow of this office during
the period May 28-June 28,1985, of activities authorized by NRC Operating
License DPR-34 for Fort St. Vrain, and to the discussion of our findings with
Mr. Fuller and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included maintenance with specific focus
on the control rod refurbishment. The inspection in this area is a
continuation from NRC Inspection Report 50-267/85-12. Within this area, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector. These
findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities appeared
to deviate from a commitment made to the NRC. This item and reference to the
commitment is identified in the enclosed Notice of Deviation.
You are
requested to respond to this deviation in writing.
Your response should be
based on the specifics contained in the Notice of Deviation enclosed with this
letter.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
(
- RPIA
RPB A
RPB
h
g/f /85
kow:de
JPJaudon
EHJohnson
5
8/ /85
S/p /85
%
1
8508190318 850813
ADOCK 05000267
G
Z E01
IfI
..
.-
t
..
.
Public Service Company of Colorado
-2-
Should'you have any questions concerning this inspection, we willHbe pleased to
discuss them with you.
Sincerely,
cenni Arr.ed BY
g, H. Johnson
E. H. Johnson, Chief
Reactor Project Branch
Enclosures:
1.
Appendix A - Notice of Deviation
2.
Appendix B - NRC Inspection Report
50-267/85-16
cc w/ enclosures: J. W. Gahm, Manager, Nuclear
Production Division
Fort St. Vrain Nuclear Station
16805 WCR 191
Platteville, Colorado 80651
L. Singleton, Manager, Qualitcc
'
Assurance Division
(sameaddress)
Colorado Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- Resident Inspector
R. P. Denise, DRSP
- SectionChief(RSB/ES)
R. D. Martin, RA
- SectionChief(RPB/A)
- D. Weiss, LFMB (AR-2015)
- P. Wagner, (RSB/ES)
- MIS System
- RSTS Operator
- RIV File
- *w/766
.
--
-
m
,_
- , ,
,p.-_
y
---
-y,-- - -