ML20134D192

From kanterella
Jump to navigation Jump to search
Forwards LER 96-022-01 Re Event Which Occurred on 961102 Re Amount of Fuel Oil Contained in D14 EDG Fuel Oil Storage Tank.Challenging Method for Determining Tank Oil Level Resulted in Operator Obtaining an Incorrect Level Reading
Date released: 05/27/2020 Download: ML20134D192


:on 961102,D14 EDG Was Declared Inoperable Due to Low Fuel Oil in Storage Tank.Caused by Challenging Method for Determining Tank Level.Increased Operator Awareness of Potential for Error Is Being Utilized
ML20134D203
Person / Time
Site: Limerick Constellation icon.png
Issue date: 01/30/1997
From: Kantner J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML20134D203 (4)
Forwards LER 96-022-01 Re Event Which Occurred on 961102 Re Amount of Fuel Oil Contained in D14 EDG Fuel Oil Storage Tank.Challenging Method for Determining Tank Oil Level Resulted in Operator Obtaining an Incorrect Level Reading
ML20134D189
Person / Time
Site: Limerick Constellation icon.png
Issue date: 01/30/1997
From: Boyce R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20134D189 (1)