ML20134C898

From kanterella
Jump to navigation Jump to search
Refers to NRC Confirming Predecisional Enforcement Conference W/Licensee on 970204.Synopsis of Rept Inadvertently Omitted from Subj Ltr
ML20134C898
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/30/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
ILLINOIS POWER CO.
References
EA-96-412, NUDOCS 9702040127
Download: ML20134C898 (3)


Text

E . ., 1

-(

nY 39)

\

January 30, 1997 EA 96-412 '

4 1

Mr. John G. Cook 4 Senior Vice President i Illinois Power Company i 500 South 27th Street Decatur, IL 62525

SUBJECT:

NRC INSPECTION REPORT NO. 50-461/96010 AND NRC OFFICE OF i INVESTIGATIONS REPORT NO. 3-96-047

Dear Mr. Cook:

This refers to our letter dated January 24,1997, confirming our predecisional enforcement
conference with you on February 4,1997. In our letter, we inadvertently omitted the
synopsis of the report prepared by the NRC Office of Investigations into the circumstances j surrounding the reactor recirculation pump seal event of September 5,1996. A copy of l the synopsis is enclosed. We regret any inconvenience this may have caused.

! In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

l I

Sincerely, i i
j. i l /s/ James L. Caldwell l James L. Caldwell, Director Division of Reactor Projects i

} Docket No. 50-461 I

Enclosure:

As Stated (See attached distribution)

Document: P:\br8\clinton2.enf g ge-. .e.. . ...i.in.n c-cm. ism .isnf ir-c -ism.ts.ent i =-

0FFICE RIII /) $ RII E f NAME Pelkq kk i Ca h, DATE 01/30/97 01/30/97 0FFICIAL REC 0RI) COPY

- oh 9702040127 970130 PDR G

ADOCK 05000461 PDR i

0$b 1

r . . ,

J. G. Cook Distribution:

cc w/ encl:

Mr. Wilfred Connell, Vice President P. Yocum, Plant Manager Clinton Power Station R. Phares, Manager-Nuclear Assessment P. J. Telthorst, Director - Licensing Nathan Schloss, Economist Office of the Attorney General K. K. Berry, Licensing Services Manager General Electric Company Chairman, DeWitt County Board State Liaison Officer Chairman, Illinois Commerce Commission J. Lieberman, OE A. B. Beach J. Goldberg, OGC W. L. Axelson R. Zimmerman, NRR H. B. Clayton Docket File DRP OC/LFDCB PUBLIC IE-01 SRI Clinton, Dresden, Rlli PRR LaSalle, Quad Cities Project Manager, NRR 1