Text
--
. . - -
--
--
---
- . - . _ . _ . - - .
--
. - .
_ .
_ - ,
. - -
-
-
x
,;
V
January 29, 1997
i
i-
Mr. Lee Liu, Chairman of the Board
and Chief Executive Officer
,
'
IES Utilities Inc.
1
200 First Street S.E.
P. O. Box 351
Cedar Rapids, IA 52406-0351
SUBJECT:
NRC INSPECTION REPORT NO. 50-331/96011 AND NOTICE OF VIOLATION
Dear Mr. Liu:
On December 20,1996, ths NRC completed a routine safety inspection at your Duane
Arnold Energy Center (DAEC) facility. The enclosed report presents the results of that
inspection.
During the 6-week period covered by this inspection period, your conduct of activities at
the DAEC facility was characterized by a safety conscious approach. We are concerned,
l
however, about two violations of NRC requirements that were identified. The first
violation pertained to a missed step during a surveillance test due to failure to properly
incorporate a document change form (DCF). In the last two resident inspector reports,
there have been examples of DCFs not being properly incorporated into documents. The
'
second violation pertained to the failure to suspend core alterations while the average
power range monitor scram was not set according to Technical Specification requirements.
The violations are cited in the enclosed Notice of Violation (Notice), and the circumstances
surrounding the violations are described in detali in the enclosed report, Please note that
you are required to respond to this letter and should fol low the instructions specified in the
enclosed Notice when preparing your response. The NFIC will use your response, in part,
to determine whether further enforcement action is necassary to ensure compliance with
regulatory requirements.
Although human performance appears to have improved from that described in recent
inspection reports, we are concerned about material condition at the DAEC facility. During
the report period, there were several self-revealing failures and other equipment problems
that represent distractions for operators and other plant staff. We are concerned about
these problems in light of the fact that the plant is just coming out of a refueling outage.
9702040111 970129
gDR
ADOCK 05000331
g
g
7
bg
/
_.
. _ _ .
.
_ _ _ . _ _ . . _ _ _ _ . _ _ . . _ _ . . _ _ _ _ _ . _ _
_ . . . _ . . _ . _ . _. . _ . _ . _ _
}
.
.
,
e
i '
L.Liu
-2-
l
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this
letter and its enclosures will be placed in the NRC Public Document Room (PDR).
t
i.
Sincerely,
/S/ John A. Crobe for
<
l
James L. Caldwell, Director
Division of Reactor Projects
.
'
i
Docket No. 50-331
{
License No. DPR-49
Enclosures: Notice of Violation
Inspection Report No. 50 331/96011
l
j
cc w/ encl:
G. Van Middlesworth, Plant Manager
j
K. Peveler, Manager, Regulatory Performance
j
Chairperson, Iowa Utilities Board
<
I
l
l
Distribution:
4
Docket File w/enci
DRP w/onci
)
PUBLIC IE-01 w/ enc!
Rlli PRR w/enci
j
Project Mgr., NRR w/enct
,
j
OC/LFDCB w/enci
CAA1 (E-Mail) w/enci
DRS w/enci (3)
TSS, w/enci
!
Enf. Coordinator, w/enci
A. B. Beach, w/enci
j
W. L. Axelson, w/enci
)
DOCUMENT NAME: DUA96011.DRP
motvc a copy of this dociament indicate in the boa "C" = Copy without attach /enci *E" = Copy with attach /enci
- N*
=
OFFICE
RIII
RIII
RIII
RII4 , M
"JyD
=;;g P W
590 e.4 tak y
NAME
S. DuPont
M. Jordan
M. Ring
robe
J
DATE
1/ /$"/97
1/M/97
1//i/97
1 37
OFFICIAL RECORD COPY
_ . .. _ _ _ . _ _ _ . ~ . . . _ _ . - _ _ _ > - . _ _ _ . _ _ . . . _ _ .
__.m
.. .. _ _ - -
_ _
m
_.
__m
_
m __ _ _ . _.
.
?
?
.
,
.
.
g" "'GW
.
UNITED STATES
,(
g%j
NUCLEAR REGULATORY COMMISSION
,
E
REGION lit
- ^
' E'
- [
801 WARRENVILLE ROAD
j-
LISLE. ILLINOIS C9532-4351
j
.....
January 29, 1997
i
i
t'
Mr. Lee Liu, Chairman of the Board
!
and Chief Executive Officer
i
lES Utilities Inc.
200 First Street.S.E.
P. O. Box 351
-
~~
Cedar Rapids, IA 52406-0351
4
SUBJECT:
NRC INSPECTION REPORT NO. 50-331/96011 AND NOTICE OF VIOLATION
.
Dear Mr. Liu:
On December 20,1996, the NRC completed a routine safety inspection at your Duane
Arnold Energy Center (DAEC) facility. The enclos.ed report presents the results of that
inspection.
During the 6-week period covered by this inspection pcmd, your conduct of activities at
the DAEC facility was characterized by a safety conscious approach. We are concerned,
however, about two violations of NRC requirements that were identified. The first
violation pertained to a missed step during a surveillance test due to failure to properly
,
incorporate a document change form (DCF). In the last two resident inspector reports,
there have been examples of DCFs not being properly incorporated into documents. The
second violation pertained to the failure to suspend core alterations while the average
power range monitor scram was not set according to Technical Specification requirements.
The violaticns are cited in the enclosed Notice of Violation (Notice), and the circumstances
surrounding the violations are described in detail in the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
1
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
Although human nerformance appears to have improved from that described in recent
inspection repo 1 -
re concerned about material condition at the DAEC facility. During
the report perioc 7
vere several self-revealing failures and other equipment problems
that represent dim .; for operators and other plant staff. We are concerned about
these problems in I,a
s. the fact that the plant is just coming out of a refueling outage.
.
- --
- - _
.-.
.
.
L. Liu
-2-
In accordancb with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this
letter and its enclosures will be placed in the NRC Public Document Roorn (PDR).
Sincerely,
.
'
.
James L. Caldwell, Director
i
,
Division of Reactor Projects
Docket No. 50-331
License No. DPR-49
Enclosures: Notice of Violation
inspection Report No. 50-33.1/96011
cc w/ encl:
G. Van Middlesworth, Plant Manager
K. Peveler, Manager, Regulatory Performance
Chairperson, Iowa Utilities Board
s