Requests Revised Proposal from Anl to Provide FY80 Program Support Contractural Assistance to NMSS by 780915.Encl Statement of Work Details Required Work
ML20134C753
Person / Time
Issue date: 07/19/1979
From: Brown R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Bauer R
ENERGY, DEPT. OF
Shared Package
ML20134B861 List: ... further results
References
CON-FIN-A-2157, FOIA-85-438 NUDOCS 8508160418
Download: ML20134C753 (8)


Text

' '

, . e. . '

('WSi.dBUTION:

..tM55/ PPB 3.5 (A2157)

NMSS R/F R. Wilde, FC JUL,191979 W. Crow, FCPF

, Mr. R. H. Bauer, Manager Chicago Operations Office '

U.S. Department of Energy 9800 South Cass Avenue .

' .Argonne. Illinois 60439

Dear Mr. Bauer:

~

, This letter is a request for a revised proposal from the Argonne National Laboratory to. provide FY80 program support contractual assistance to the

. Office of Nuclear Material Safety and Safeguards of the Nuclear Regulatory

. .Comission . The ' enclosed statement of work details the required work and should be used as the basis for preparing a proposal for submission to this Office. Standard terms and conditions for NRC work, as approved by Headquarters 00E, apply to this effort. A copy of these terms and condi-tions has been . furnished your office separately. The proposal should i

contain as a minimum the information set forth in Enclosure 2 and should be submitted in six copies:to:

Office of Nuclear Material Safety and Safeguards Attn: Program Support .

U.S. Nuclear Regulatory Comission '

Washington..D.C. 20555 -

Work under this task is anticipated to be unclassified. Authorization to conmence work will become e_f_fective upon the Chicago Operations Office acceptance of an appropriately executed NRC Form 173.

The proposal should be submitted to this office by September 15, 1979, so that the project can comence on October 1. If you have any questions

~'

, , about this request for proposal, please conta'ct Mr.: Don' Loosley on FTS ,

427-40.72. Thank you for your assistance. .

n 4

Sincerely, Original signed by R. S. 8 R OWN, J R.

Robert S. ' Brown, Jr.

Assistant to the Director '

This letter commits 50K in FY80' and Chief. - ,,.

funds for FIN A2157 B&R 50-19-01-01-0. Program Suppo@t Branch f '/ c Enclosures :

iSS/PSB Ntt55([P 1, . Statementjof ',6f\

J)[vang'F/14

/79ry/p/f 3. ,

R$Brodn, Jr.

m. < , ym , w m -

y

- . . W. R........ ..Mo H........ . ....Ec RE....ldL. . . F C P. E . . .. . . ..W.

......F.C..yb..t..I[.T.,

. . . . 7C.

.~~.

-. .?..R9. J h... ..P.Lo51'

.. ...L R,9 u ,,,__,_, ,_yB,g__, ,,,, yn , gh

~ .c c , . . R.

.. .,r,E.V,.,/l...}E..E,,fN.

. . . , a..c. .,. ,

.s.,e.r. . ............ .....F.[C

....J

,h],f-.....

nr?". .........

- - - - . . , ~.~. 7 [..(.. k. / L / i "-

~~ '

j anc seems m m secas ese b.".*a*=a==='====*****'******

8500160410 050710 PDR ,

FOIA RAPKIN85-430 PDR

q , 10/2/79 t

i .

, I ,

PROPOSAL CONTENT -

The minimum items required in all proposals are:

j

1. Performing Organization's Name and Location ,
2. FIN Title (as on statement of work) 1
3. FIN Number
4. B&RNumber(NRC's) i
5. Performing organization's key personnel, program manager, or principal investigator, and FTS phone number.
6. Background (include previous technical progress if a continuation, and relationship to other projects). <
7. Work to be Performed (Provide a concise description of tasks to be performed and expected results for the period of performance.

Identify major subcoritracts, including consultants. Note technical i data requirements, potential problems, and other technical information needed to fully explain the effort. Highlight changes from prior

! authorized 50W's if any, identifying changes in performance, schedule, or costs).

, 8. Costs estimated to be incurred by DOE contractors, subcontractors, and l consultants (list by fiscal ye,ar to ' completion):

a. Manyears of Technical Support (MTS)
b. Costs: ,

(1) Direct Salaries (Labor) for MTS (2) Material and Services (excluding ADP)

(3) Total ADP Support _

(4) Subcontracts j (5) Capital Equipment ,

. (6) Direct Travel Expense (foreign travel must be shown separately)

I

(7) General and Administrative Expense (include indirect labor cost)
c. Total Estimated Cost:

1 i

Enclosure 2

' ~~

~) .

2- t

9. Forecasts:
a. Milestone Chart for accomplishing the work,
b. Planned monthly rate of costs for first fiscal year. This may be provided with the first report of an authorized program if not known at time of proposal submittal . At the beginning of each subsequent year, reports should include the planned monthly rate of costs for the ensuing year.
10. Conflict of Interest:

In order to assist the Commission in its evaluation, the DOE Contracting Officer shall describe any significant contractual and organizational relationships of the DOE, its contractor, their employees, or expected i

subcontractors or consultants on this proposal, with industries regulated I by the NRC (e.g. utilities, etc.) and suppliers thereof (e.g. architect l engineers and reactor m3nufacturers, etc.) that might give rise to an apparent or actual conflict of interest.

l I

l l

1 __

& f

+mmus 10 1

-~. -

a *{ o ', i*

July 16, 1979 STATEMENT OF WORK (50W) FOR LICENSING PROGRAM SUPPORT - ENVIRONMENTAL REVIEW ASSISTANCE FIN A2157-0 B&R 50-19-01-01-0

1.0 Background

Evaluation of probable or potential environmental impacts is an integral part of the licensing process for uranium fuel cycle facilities. In accordance with Nuclear Regulatory Comission (NRC) regulations, environ-mental appraisals or environmental impact statements (EIS) are required to support licensing decisions on new license applications, license renewals, proposed major modifications of facilities, and, in some cases, decomis-sioning plans for uranium recovery operations, fuel processing and fabrication facilities, and for related types of activities. The NRC's Office of Nuclear Material Safety and Safeguards (NMSS) requires technical assistance in conducting its environmental evaluations of applicant proposals and in the preparation of the associated environmental appraisal reports and environmental impact statements (draft and final statements). Argonne National Laboratory (ANL) has provided such assistance in FY79 under NMSS '

Project A2010-9. This project .(A2157-0) is related to that effort.

2.0 Work Required _

The performing organization shall furnish the necessary qualified per:onnel, facilities, materials and services to complete the final environmental state-ment for the Kerr-McGee West Chicago task initiated in FY78 under FIN No.

A2010. This may include the resolution of coments received on the draft environmental statement issued in FY78. Before this task can be completed, -

the NRC must receive an acceptable decommissioning plan from the licensee, _,

At this time it is difficult to estimate exactly when that document will be provided. However, the target task completion date will be during the 2nd Quarter of FY80.

3.0 Reporting Requirements 3.1 Monthly Letter Status Report Each month, the performing organization shall submit eleven (11) copies of a brief letter report which sumarizes: (1)theworkperformedduringthe previous month; (2) personnel time expenditures during the previous month; Enclosure 1

<. ., & j 3.1 Monthly Letter Status Report (Continued) and (3) costs: (a) during the previous month, (b) cumulative to date (fiscal year and total), and (c) projection by month to completion of the work effort covered by this statement of work. The first monthly report shall provide the initial projection and subsequent reports shall either indicate revised projections or indicate "no change in the cost projection." The report shall be due by the 15th of each month with distribution as follows:

W. T. Crow, NMSS, 10 copies Office of the Director, NMSS (Program Support),1 copy -

3.2 Interim and Final Technical Report ,

A draft interim report (15 copies) shall be submitted concerning the site within 90 days of completion of the site survey. This draft report shall be sent to the NMSS Project Manager (PM). The detailed format of this report will be agreed upon after the survey because the report will relate on an "ad hoc" basis to the West Chicago site; how-ever, generally the report shall include: (1) abstract 2) intro-duction, (3) survey methods, (4) guidelines used to evalua(te results, ^

(5) survey results, and (6) references.

The NMSS PM will furnish consnents on the draft report to the performing organization within two weeks after receipt of the draft. Based upon -

those coments, the performing organization shall revise the draft and submit the final report in fifteen (15)* copies to the NMSS PM and one (1) to the Office of the Director, NMSS (Program Support) not later than one month after comments on the draft report have been received.

(See Paragraph 12 of Terms and Conditions Standard Order for DOE Work.) -

4.0 Meetings and Travel The performing organization shall meet approximately four times with the NMSS PM to discuss the results of the work. Those meetings shall be of one day's duration and shall be held at the NRC offices in Silver Spring, Maryland.

5.0 NRC Furnished Material There will be no NRC furnished material.

(

r% m s .. : * .-

g 3

6.0 Period of Performance Performance under this work order shall comence on October 1,1979, and shall continue through Septecter 30, 1980.

7.0 Technical Direction Mr. W. T. Crow (FTS 427 4103) is designated as the NMSS Project Manager (PM) for the purpose of assuring that the services required under this 50W are delivered in accordance herewith. All technical instructions to the DOE performing organization shall be issued through'the NMSS PM. As used herein, technical instructions are instructions to the Contractor which provide details, suggest possible lines of inquiry, or otherwise complete the general scope of work set forth herein. Technical instructions shall not constitute new assi-gnments of work or changes of such a nature as to justify an adjustment in cost of period of performance.

Direction for changes in cost or period of performance will be provided by the DOE Operations Office after 'eceipt r of an appropriate NRC Form 173 from the Director of the Office of Nuclear Material Safety and Safeguards (NMSS).

If the DOE performing organization receives guidance from the NMSS PM which is believed to be invalid under the criteria cited above, the performing organization shall imediately notify the NMSS PM. If the NMSS PM and the performing organiztion are not able to resolve the question within '

- five days, the performing organization shall notify the DOE Operations Office. __

8.0 Disposal of Property Upon completion of a program or termination of a project, a reconciled .

report will be developed jointly by DOE and. NRC to record available "

equipment and related material purchased with NRC funds. This report should be developed as soon as possible after program completion or -

termination decision has been made, but not later than sixty (60) days after work termination date. The report should be submitted to the Property and Supply Branch, NRC.

l l

~

~ .

PROPOSAL CONTENT The minimum items required in all proposals are:

l. Performing Organization's Name and Location t 2. FIN Title (as on statement of work)
3. FIN Number
4. B&R Number (NRC's)
5. Performing organization's key' personnel, program manager, or principal investigator, and FTS phone number
6. Background (include previous technical progress if a continuation, andrelationshiptootherprojects)
7. Work to be Performed (Provide a concise description of tasks to be performed and expected results for the period of performance.

i Identify major subcontracts, including consultants. Note technical data requirements, potential problems, and other technical information needed to fully explain the effort.)

8. Costs estimated to be incurred by DOE contractors, subcontractors, '

and consultants (List by fiscal year to completion):

a. Manyears of Technical Support (MTS)

~

b. Costs:

(1) Direct Salaries (Labor) for MTS (2) Total Material and Services (3) Subcontracts _.

(4) Capital Equipment 1 (5) Direct Travel Expense (List number of trips, number of  :

travelers, days in travel status, and projected travel ,

expense. Foreign travel must be shown separately.)  :

~

(6) General and Administrative Expense (Include indirect labor)

c. Total Estimated Cost:
9. Forecasts:

Milestone Chart for accomplishing the work l a.

b. Monthly planned rate of costs for first fiscal year Enclosure 2

. s.

2-

10. Conflict of Interest:

In order to assist the Comission in its evaluation, the DOE Contracting Officer shall describe any significant contractual i

and organizational relationships of the DOE, its contractor, their employees, or expected subcontractors or consultants on this pro-posal, with industries regulated by the NRC (e.g. utilities, etc.)

and suppliers thereof (e.g. architect engineers and reactor

  • manufacturers, etc.) that might give rise to an apparent or actual

! conflict of interest.

i i

-l

.e' s N i

d i

i i

r

- ~-- -

,_ _ . _ . - , . . . . . _ . . .