Text
_
[p+*%gg UNITED STATES T
{
3 g
g NUCLEAR REGULATORY COMMISSION
/
o WASHINGTON, D.C. 2066Mm01
$9 4,,,*
February 3, 1997 i
EA 96-079 Mr. B. Ralph Sylvia, Executive Vice President Generation Business Group & Chief Nuclear Officer Niagara Mohawk Power Corporation Generation Business Group D-2 300 Erie Boulevard West Lycoming, New York 13202
SUBJECT:
PUBLIC MEETING - NINE MILE POINT, UNIT 1
Dear Mr. Sylvia:
This refers to a public transcribed meeting conducted between NRC and Niagara Mohawk Power Corporation on January 6, 1997, at the NRC Headquarters Office.
The purpose of the meeting, held at your request, was to discuss issues associated with NRC enforcement action EA 96-079.
Specifically, your staff discussed a proposed Severity Level IV violation involving the failure to notify the NRC of a condition outside of design basis of the facility. The discussions provided an opportunity for a candid exchange of information, and were beneficial to the NRC staff understanding your position on this issue.
The NRC staff is reviewing this matter and will respond separately in a future letter.
Copies of the transcript, our slides utilized during the presentation, and a list of those attending the meeting are enclosed.
A copy of this letter and its enclosures will be placed in the PDR.
j wp ames Lieberman, Director ffice of Enforcement
Enclosures:
As Stated cc w/encls:
H. Miller, RI D. Hood, NRR PUBLIC b t} '
Ellen Ginesburg
/
Nuclear Energy Institute 1776 I Street, N.W.
Suite 400 Washington, DC 20006-3708 Nicholas Reynolds, Esq.
Winston & Strawn 040001 1400 L Street, N.W.
Washington, DC 20005-3502 h'\\
9702040022 970203 4
PDR ADOCK 05000220
)
G PDR
MEETING LIST Nine Mile Point, Unit 1 and USNRC NRf ASSOCIATED WITH Gary Wilson Niagara Mohawk Mark Wetterman Winston & Strawn 4
Denise Wolniak Niagara Mohawk Carl Terry Niagara Mohawk Ralph Sylvia Niagara Mohawk Martin McCormick, Jr.
Niagara Mohawk Nick Reynolds Winston & Strawn Tim Martin NRC/NRR James Liebarman NRC/0E Mark Satorius NRC/0E John Zwolinski NRC/NRR Si Singh Bajwa NRC/NRR L. T. Doerflein NRC/RI R. A. Skokowski NRC/RI Michael Rafky NRC/0GC Daniel J. Holody NRC/RI Ellen Ginsberg NEI David C. Jeng Mark Hartzman NRC/NRR Carl H. Berlinger NRC/NRR David Stellfox McGraw-Hill G. Bagchi NRC/NRR Eileen McKenna NRC/NRR Frank Aksulewicz NRC/NRR Dick Wessman NRC/NRR David Matthews NRC/NRR Dennis Allison NRC/AEDO Darl Hood NRC/NRR l
NMP-1 NUREG - 1922 l
Reportable a
i OriginalMin.BldDesign(FSAR)
Piping System Code i
In excess of 80 PSF Allowable Stress
)
1 i,
1 2993 CalculatedPanelBlowout
-Not Reportable-Pipe Support Missing / Failed Pressure 53-60 PSF Stress Below Code Allowable y
)
{
Blowout PanelFdnction (FSAR)
Piping System Stress
)
Approximately 45 PSF w/AllHangersIntact I
l
,..,,,,.m,,m e,---e-wm
=-s--w**
=ww e'~w
- '---w-
I
> 80 psf Building Failure (Calculated as 129 psfin 1996)
[AnalyticalLimit]
i V
80 psf Original Minimum Building Design Capability
[ Allowable Value]
53 (60) psf 1993 Calculated Blowout Panel Function l
t l.
=45 psf UFSAR Blowout PanelFunction
[OperationaVNominal Value]
-