Forwards 850809 Rev 0 to Living Schedule,Per Request.Summary of Living Schedule Changes Since Oct 1984 Schedule Also Encl.Schedule Includes Addl Items & Covers Period from Cycle 7 to mid-Cycle 10
ML20134C552
Person / Time
Site: Rancho Seco
Issue date: 08/12/1985
From: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Thompson H
Office of Nuclear Reactor Regulation
References
RJR-85-397, NUDOCS 8508160350
Download: ML20134C552 (16)


Text

_

$SMUD SACRAMENTO MUNICIPAL UTiuTY DISTRICT O 6201 S Street, P.O. Box 15830, Sacramento CA 95852-1830.(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART CF CALIFORNIA RJR 85-397 August 12, 1985 DIRECTOR OF NUCLEAR REACTOR REGULATION ATTENTION HUGH L THOMPSON JR DIRECTOR

. DIVISION OF LICENSING U S NUCLEAR REGULATORY COMMISSION WASHINGTON D C 20555 DOC'(ET 50-312 RANCHO SECO NUCLEAR GENERATING STATION UNIT NO 1 RANCHO SECO LIVING SCHEDULE The District anticipates that the NRC will soon approve proposed License Amendment 106 "The Living Schedule Plan for Rancho Seco Nuclear Generating Station". Responding to the request of the NRC Project Manager, Syd Miner, the District is submitting (Attachment I) its most recent Rancho Seco Living Schedule, dated August 9, 1985 and issued as Revision 00. The District will transmit approved Living Schedules to the NRC dated and with now Revision nuEs t

~

Attachment II is a brief summary of Living Schedule changes since the last Living Schedule, dated October 1984. As noted in both Attachments, Rancho Sec.o is now in Cycle 7, so a number of modifications are shown as completed. The District has listed items as " completed" when Startup has successfully finished testing and upon acceptance by Nuclear Operations.

Also, the attached Living Schedule now includes additional items and covers the period from Cycle 7 to mid-Cycle 10.

The District trusts this information will lead to the prompt approval of proposed License Amendment 106. Should you have any further questions, contact Jerry Delezenski at Rancho Seco.

N R. J. RODRIGU ASSISTANT GENER L MANAGER, NUCLEAR Attachments (2) 8508160350 850812 PDR ADOCK 05000312 y

e

SACRAMENTO MUNICIPAL UTILITY DISTRICT RANCHO SECO LIVING SCHEDULE August 9, 1985

  • Rev. 00 LEGEND:

Attachment 1

= Scheduled Work

= Potential Work Page 1 of 7 0 = NRC Ordered .B = Betterment C = SMUD Comunitment to NRC R = Non-NRC Regulatory

  • = Completion Tied RF0
  • Refuel Outage to Outage RF0 RFO RF0 CYCLE 7 CYCLE 8 CYCLE 9 MOD DESCRIPTION TYPE 1985

' CYCLE 10 1986 1987 1988 1989 1990 AS0NDJFMAMJJA50NDJFMAMJJAS0NDJFMAMJJA50.tDJFMAMJJAS0NDJFMAMJJAS0 001 Emergency C a* a*

Feedwater Initiation

& Control 002 Inadequate C COMPLETE Core Cooling -

Hot Leg Level

& Incore Thermocouples 002 Inadequate C a*

Core Cooling -

RV Level 005 Retention B a Basin Radmonitors 005 Purge Stk B o W/R Gas Monitor 005 Spent Fuel B a Pool Pad Monitors 011 Equipment 0 C0ffLETE Qualification 013 Safety Grade O COMPLETE i

Anticipatory Reactor Trip 0020L

SACRAMENTO MUNICIPAL UTILITY DISTRICT -

  • RANCHO SECO LIVING SCHEDULE August 9, 1985 -

Rev. 00 LEGEND: = Scheduled Work Page 2 of 7

- - _ = Potential Work 0 = NRC Ordered B = Betterment C = SPRJD Commitment to NRC R = Non-NRC Regulatory

  • = Completion Tied RF0 = Refuel Outage to outage atu atu ato CYCLE 7 CYCLE 8 CYCLE 9 CYCLE 10 MOD DESCRIPTION TYPE 1985 1986 1987 1988 1989 1990 A50NDJFMAMJJA50NDJFMAMJJA50NDJFMAMJJA50NDJFFiAMJJA50NDJFMAMJJA50 017 Relief Valve C COMPLETE Instrumenta-tion Upgrade 018 Critical o B n STUDY n __________________________________a Class II Load Upgrading 025 Post C COMPLETE Accident Sampling ,.

System 9 026 Turbine B STUDY )[

Water COMPLETE 4 Induction {.

029 Control Room O COMPLETE

/

Isolation 032 Technical O COMPLETE Support Center &

Control Room HVAC 036 Diesel .C a*

Generator Facility &

Requalification 038 Interim On- B _o Site Storage

, Building a*

040 Class 1 C Electrical System

,f. ,h:l t

.~ .

e

f. .

SACRAMENTO mlNICIPAL UTILITY DISTRICT j .. 'J RANCHO SECO LIVING SCHEDULE , 1 ~

August 9, 1985 / /

Rev. 00 '

/

s l

LEGEND: = Scheduled Work Page 3 of ' 7

_ _ _ = Potential Work '

I O = NRC Ordered B = Betterment '

C = SMID Comunitment to NRC R = Mon-NRC Regulatory

  • = Completion Tied RF0 = Refuel Outage to outage RtU RtU RFU CYCLE 7 CYCLE 8 CVCLE 9 ~ CYCLE 10 MOD DESCRIPTION TYPE 1985 1986 1987 1988 1989 1990 A S 0 N D J F M A M J J A S 0 N D J F M A M J J A S 0 N D J F M A M J J A S 0 N D J F M A M J J A S 0 N PD M A M J J A S G 043 Cathodic B a a Protection 044 Upgrade of B no Reactor Internals Bolting 045 Site Domestic B a a Water Upgrade 049 Low Tempera- C COMPLETE ture Over-pressure .

Protection Alarms 049 Low Tempera- C a*

ture Over-pressure Prt,tection Valves STUDY .

058 Component B ______________________--.o Cooling COMPLETE a

Water System Upgrade 059 Plant B STUDY Integrated COMPLETE Computer System 060 Safety 0 CON LETE Parameter Display System

.E. =

l ,

SACRAENTO MJNICIPAL UTILITY DISTRICT RANCHO SECO LIVING SCHEDULE t ~

August 9, 1985 '

Rev. 00 /

I LEGEND: = Scheduled Work Page 4 of '7

= Potential Work .

! 0 = NRC Ordered 8 = Betterment

! C = SMJD Comunitment to NRC R = Non-NRC Regulatory .

, *
  • Completion Tied RF0 = Refuel Outage to outage atu NPu RF0 CYCLE 7 CYCLE 8 CYCLE 9 CYCLE ~10 MOD DESCRIPTION TYPE 1985 1986 1987 1988 1989 ~ 1990 A50NDJFMAMJJA50NDJFMAMJJA50NDJFMAMJJAS0NDJFMAMJJA50NDJFMA#1JJA50

' a*

061 Polar Crane B a

, Modifications 064 Security C a Modifications

' 066 Nuclear C COMPLETE Service Electrical Building 068 Auxiliary C COMPLETE Building Fire Protection 069 Alternate B STUDY a a*

Startup COMPLETE Power Source

~

071 Pressurizer C no Safety Valve '

Support 072 L.P. Turbine B a*

, Rotor Replacement 074 Sewage Treat- R o

, ment Upgrade

^*

081 120V Inverter B a Transfer Switches 4

j -. .

SACRAMENTO MUNICIPAi UTILITY DISTRICT ,

RANCHO SECO LIVING SCHEDULE "

August 9. 1985 Rev.:00

-~ LEGEND: = Scheduled Work ,

Page 5 of 7

_ _ = Potential Work 0 = NRC Ordered B = Betterment C = SMID Commitment to NRC R = Non-NRC Regulatory

  • = Completion Tied RF0 = Refuel Outage to outage RtU RtU RtU CYCLE 7 CYCLE 8 CYCLE 9 CYCLE 10 MOD DESCRIPTION TY?E 1985 1986 1987 1988 1989 1990 A50NDJFMAMJJA50NDJFMAMJJA50NDJFMAMJJA50NDJFMAMJJA50NDJFMAMJJAS0 083 Bypass B a a*

Switches -

480V MCC'S 085 D/G Test B CAs!ELLED

('l Panel 087 Shunt Trip C COMPLL'J:

088 Control Room 0 STUDY g' Design Review ,

CB9 Manual Over- B COMPLETE \

ride .s HV20001 & 2 g 4 093 Emergency C COMPLETE ,

Fe?d Pump $

,Runcut \h 097 Isolating B COMPLETE 7, Equipment #;

098 Multiplexer B COMPLETE s Equipment .

N 099 S3A2 & $3B2 B ,

al Fuse Replace- ,

ment s 102 App. I ALARA C a -

i Liquid 'N Effluent Discharge . .

\

w 6

o.

~

- l

l SACRAPENTO MUNICIPAL UTILITY DISTRICT -

RANCHO SECO LIVING SCHEDULE .

August 9. 1985 ,

Rev. 00 LEGEND: = Scheduled Work Page 6 of 7

= Potential Work 0 = NRC Ordered B = Betterment.

C = SMD Commitment to NRC R = Non-NRC Regulatory

  • = Completion Tied RF0 = Refuel Outage to outage nru ntu Rro CYCLE 7 CYCLE 8 CYCLE 9 CYCLE 10 MOD DESCRIPTION TYPE 1985 1986 1987 1988 1989 1990 ASONDJFMAMJJASONDJF.MAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASO 103 Auxiliary B o Boiler Chemical Addition System 106 Snubber B a*...............o*

Optimization 107 Nuc/Eng/Trng B a Simul./ Bldg 108 Simulator B

'- a 111 Fire Protection C

\

a

\

Re-evaluation \

112 HPI/M Pump a

\ '

4*

B Suction Piping g Overpress N Protect '

114 CAS-SAS B a Security Upgrades 115 Reg Guide C a* a*

1.97 ,

117 IDADS-2 B a*

118 Main Ste Line B COMPLETE Brk Fail Logic Status N 119 Reevi of B a a*

Upper Dome Air Circulators l'

SACRAMENTO PRINICIPAL UTILITY DISTRICT

  • RANCHO SECO LIVING SCHEDULE August 9, 1985 *

.Rev. 00 LEGEND: = Scheduled Work Page 7 of 7

_ _ _ = Potential Work 0 = NRC Ordered B = Betterment C = SMAD Cosmiitment to NRC R = Non-NRC Regulatory

  • = Completion Tied RF0 = Refuel Outage to outage RPU RF0 RtU CYCLE 7 CYCLE 8 CYCLE 9 CYCLE 10 MOD DESCRIPTION TYPE 1985 1986 1987 1988 1989 1990

, ASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJA50 120 Auto Init, of C a a*

RCP Seal Inject.

121 CR Annunciators B a a*

(Emerg. DG) 122 Reevl. of Ob- B ________________ o solete Radiation

? Dose Rate In-strumentation i

123 Letdown Filter B a a*

Valves 124 Vent Fans for B a a*

.< Rx Vessel Closure Head Service Structure 125 Upgrade of C a Spent Fuel Pool Cooling Return

Line to Seismic Cat. I 126 PASS Improve- B a*

ments 127 RV Cavity 0 o*

Dosimetry 128 Equip. Qualif. O o*

Replacement Items

b' Revision 00 August 9, 1985 Attachment 2 SACRAMENTO MUNICIPAL UTILITY DISTRICT 1

LIVING SCHEDULE CHANGES FOR RANCHO SECO MODIFICATIONS The fotLowing to en update of the October 31, 1984 submittet to the NRC.

This List includes only those items that have changed since the Lost submittet.

MOD 009 - INADEQUATE CORE COOLING - HOT LEG LEVEL AND INCORE THERM 0CDUPLES ,

Type SNUD Commitment Work was completed during the 1985 refueling outage.

MOD 005 - RETENTION BASIN RADIATIDW MONITORS Type Betterment The extended completion date reflects the revised forecast for the completion of this item.

MOD 005 - PURGE STACK WIDE RANGE GAS MONITOR Type Betterment This additionet item reflected en increase in the scope of MOD 005, and most physical work was completed during the 1985 refueling outogo. Tech spec and procedures must be completed. Interlock with automatic release terminetton must be completed.

MOD 011 - EQUIPMENT QUALIFICATION Type NRC Order Work was completed during the 1985 refueling outage.

MOD 013 - SAFETY GRADE ANTICIPATORY REACTOR TRIP Type NRC Order Work was completed during the 1985 refueling outage.

MOD 017 - RELIEF VALVE INSTRUMENTATION UPGRA2g Type SMUD Commitment Work was completed during the 1985 refueling outage.

Livfog Schedule Changes August 9, 1985 Revision 00 NOD 025 - POST ACCIDENT SAMPLING SYSTEM Typer SMUD Commitment The work committed to be done by the end of the 1985 refueling outage was completed. The potential work shown previously (i.e. upgrades to the system) has been innorporated into a new modification (#126),

scheduled for completion by the end of the Cycle 8 refueling outage.

MOD 026 - TURBINE WATER INDUCTION PROTECTION Type Betterment The study is complete.

MOD 029 - CONTROL ROOM ISOLATION Type: NRC Order Work was completed during the 1985 refueling outage.

MOD 039 - TECHNICAL SUPPORT CENTER AND CONTROL ROOM MVAC Typer NRC Order Work was completed during the 1985 refueling outage.

MOD 038 - INTERIN ONSITE STORAGE BUILDING i

Type Betterment This schedule reflects the forecast for work completion by a contractor.

MOD 040 - CLASS I ELECTRICAL SYSTEM l

l Type: Commitment

! The schedule change reflects a tie-in with the completion of MOD 036, the Dieset Generator facility, at the end of the Cycle 8 refueling outage.

MOD 043 - CATHODIC PROTECTION

Type Betterment The start of work is deferred until June 1986 due to District resource limits. Completion is forecasted in July 1987 l

t l l

Living Schedule Changes August B, 1985 Revision 00 MOD 044 - UPGRADE OF REACTOR INTERNALS BOLTING Type Betterment This modification was deferred from the Cycle 8 refueling outage to the Cycle 10 refueling outage in order to coincide with the District's 10 year inspection, and to enebLe better coordination with other utilities using similar equt poent.

MOD 045 - SITE DOMESTIC WATER UPGRADE Type: Betterment The start cf work was deferred until April 1986 due to District resource Limits. Completion is forncosted in June 1987 MOD 049 - LOW TEMPERATURE OVER-PRESSURIZATION PROTECTION - ALARMS Type SNUD Commitment Work was completed during the 1985 refueling outage.

MOD 058 - COMPONENT COOLING WATER SYSTEM UPGRADE Type Betterment Pending enelysis of study results, this NOD may generate additione t wo rk. However, this onetysis is deferred until April 1986 due to District resource Limits. PotentieL work outlined wilL not change until study onetysis proves otherwise.

MOD 059 - PLANT INTEGRATED COMPUTER SYSTEM Type Betterment The study for this item was completed. The potential work was concelled and technically integrated into NOD 117, IDADS-2 MOD 060 - SAFETY PARAMETERS DISPLAY SYSTEM Type: NRC Order Work was completed during the 1985 refueling outage.

MOD 061 - POLAR CRANE MODIFICATIONS Typer Betterment Deferred from the Cycle 8 to the Cycle 9 refueling outage due to District resource limits. Engineering is forecasted to stort in June 1986 I

l Living Schedule Changes August 9, 1985 Revision 00 NOD 084 - BECURITY MODIFICATIONS Type SMUD Commitment Work on this modification is scheduled to be complete by the end of November 1985 MOD 088 - NUCLEAR SERVICES ELECTRICAL BUILDING Type SMUD Commitment Work on this modification was completed.

MOD 088 - AUXILIARY BUILDING FIRE PR9TECTION Type SMUD Commitment Work on this modification was completed.

MOD 089 - ALTERNATE START-UP POWER SOURCE Type Betterment The study is complete. This modification was deferred from the Cycle 8 to the Cycle 9 refueling outage due to District resource limits.

Engineering is forecasted to etert in April 1988 l

MOD 071 - PRESSURIZER SAFETY VALVE DISCHARGE PIPING SUPPORTS Type SMUD Commitment The study is complete. The work is changed from potential to approved status with completion tied to the Cycle 8 refueling outage.

. M00 001 - 120VAC INVERTER TRANSFER SWITCHES l Typer Betterment I Work is deferred from the Cycle B to the Cycle 9 refueling outage due j to District resource limits. Engineering-is forecasted to stort in July 1988 MOD 083 - BYPASS SWITCHES FOR 400V MCC'S Type Betterment Work is deferred from the Cycle 8 to the Cycle 9 refueling outage due to District resource Limite. The etert of engineering is forecasted for August 1986 l

MOD 085 - DIESEL GENERATOR TEST PANELS Type Betterment This modification is concelled due to poor economics of implementation.

l -

-4 l-

. Living Schedule Changee August 9, 1985 Revision 00 MOD 087 - BHUNT TRIP i' Type BMUD Commitment Work see completed during the 1985 refueling outage.

, MOD 089 - MANUAL OVERRIDE OF HV2OOO1/2OOO2 Types _ Betterment Work was completed during the 1985 refueling outage.

MOD 093 - EMERGENCY FEED PUMP RUNOUT Types SMUD Commitment Work was completed during the 1985 refueling outoge.

MOD 097 - ISOLATION EQUIPMENT Type Betterment Work was completed during the 1985 refueling outage.

MOD 098 - MULTIPLEXER EQUIPMENT Type Betterment Work was completed during the 1985 refusting outege.

MOD 099 - S3A2 & S382 FUSE REPLACEMENTS Typer Betterment Work to deferred from the Cycle 7 to the Cycle 8 refueling outage due to Dietrict resource Limite.

i MOD 102 - APPENDIX "I" LIQUID EFFLUENT DISCHARGE Typer SMUD Commitment The study is complete. Work statue has changed from potential to approved. The completion is scheduled for October 1988 MOD 103 - AUXILIARY BOILER CHEMICAL ADDITION SYSTEM Type Betterment The completion of this MOD te extended until the end of September 1985 The work is non-outage.

e

F Living Schedu.e Changes August 9, 1985 Revision 00 MOD 108 - SNUBBER OPTIMIZ ATION Types Betterment Work changes f rom potential to approved for Phoes I (RCP snubbers),

with' completion at the end of the Cycle 8 resueling outage. The balance remains as potential work.

MOD 107 - NUCLEAR ENGINEERINC/ TRAINING / SIMULATOR BUILDING Type Betterment ,

Work changes from potential to approved, and the completion is forecast for September 1987 This proj ect combines previously esperate facilities for Nucteer Engineering and training butidings.

MOD 108 - SIMULATOR Type Betterment The District is pursuing instatLation of the Simulator. This work changes from potentist to approved, with completion scheduled for January of 1989 MOD iii - FIRE PROTECTION PROGRAM - APPENDIX "R" RE-EVALUATION Type SMUD Commitment The completion of this modification is extended until October 1985 MOD 115 - REG. GUIDE 1.97 Typer SMUD Commitment The study is complete. The implementation wilL be in both the Cycle 8 and Cycle B refueling outages.

ADDITIONS TO THE LIVING SCHEDULE SINCE OCTOBER 81. 1984 The fotLowing modifications have been added to the Living Schedule since October 31, 1984 MOD 112 - HPI/MU PUMP SUCTION PIPING OVERPRESSURE PROTECTION l

The start of engineering was delayed untti efter the completion cut-off date for engineering for Cycle 8 Tentative etert is May 1988

y g _

Living Schedule Changes August 9, 1985 l Revision 00 l

l MOD 114 - CAS-SAS SECURITY UPGRADES Type Betterment This modification is fo rece nt for completion in Ape,it 1986 The work is-non-outage..

MOD 117 - IDADS-2 Type Betterment This modification is scheduled to coincide with the Cycle 8 refueling outage.

MOD 118 - MAIN STEAM LINE BRE AK FAILURE LOGIC STATUS Type: Betterment This modification has been completed.

MOD 119 - REMOVAL OF UPPER DOME AIR CIRCULATORS Type Betterment This modification is scheduled for completion in the Cycle 8 refueling outage. -

MOD 120 - AUTO INITIATION OF RCP SEAL INJECTION Type: SMUD Commitment Completion is scheduled for th's and of the Cycle 8 refueling outage.

MOD 121 - CONTROL ROOM ANNUNCIATORS (EMERGENCY DIESEL GENERATORS)

Type Ostterment Completion is scheduled for the end of the Cycle 8 refueling outage.

MOD 122 - REMOVAL OF OBSOLETE RAOIATION DOSE RATE INSTRUMENTATION 1

Type Betterment Construction work is non-outage, to be performed in two stages. The first stage was completed du ring the 1985 outage. The potential for additionet work exists as the control philosophy is reviewed and equipment is updated. Completion of the second stage is shown at the end of the Cycle 8 refueling outage. However, additional study may require an adj ustment in the scheduled' completion due to scope change (s].

+

__o__. _ - . _ . __ -. _ _ . -

. ~

  • l j

\

Living Schedule Changee August B, 1985 l Revision 00 MOD 123 - LETDDWN FILTER VALVES Type 8etterment Completion to tied to the end of the Cycle 9 refueling outage.

MOD 124 - VENT FANS FOR REACTOR VESSEL CLOSURE HEAD SERVICE. STRUCTURE Type Betterment Completion is tied to the end of the Cycle 9 refueling autogo.

MOD 125 - UPGRADE OF SPENT FUEL POOL COOLING SYSTEM RETURN LINE TO SEISMIC CATEGORY I Types SMUD Commitment Completion is scheduled for December 1985 MOD 128 - POST ACCIDENT SAMPLING SYSTEM IMPROVEMENTS Type Betterment Completion is tied to the end of the Cycle 8 refueling outage.

MOD 127 - REACTOR VESSEL CAVITY DOSINETRY Type NRC Order The completion of this item is tied to the end of the Cycle 8 I

refueling outsgs.

MOD 128 - EQUIPMENT GUALIFICATION REPLACEMENT ITEMS Type NRC Order The completion of this item is tied to the end of the Cycle 8 refueling outage.

I I i

. . . . -.. - _- . - _ . - , _ _ . _ - _ _ _ _ . _ _ . _ . _ _ . . . - _ - . - . _ _ _ . , - _ . - _ . . _ _ _ . _. _ -. _ _ _ _ _