ML20134C159

From kanterella
Jump to navigation Jump to search
Informs of Addl Changes to Amend to License NPF-62,revising TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined Every 60 Months
Date released: 05/27/2020 Download: ML20134C159


Proposed Tech Specs,Revising TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined at Least Once Per 60 Months
ML20134C163
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/20/1996
From:
ILLINOIS POWER CO.
To:
References
Download: ML20134C163 (3)
Informs of Addl Changes to Amend to License NPF-62,revising TS 3.3.4.1, End of Cycle Recirculation Pump Trip Instrumentation, to Delete SR 3.3.4.1.6 Which Requires RPT Breaker Interruption Time to Be Determined Every 60 Months
ML20134C158
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/20/1996
From: Lyon M
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20134C158 (2)