Application to Amend Licenses DPR-39 & DPR-48,changing Tech Spec Sections 3.4 & 3.15 Re Installation of Degraded Grid Voltage Protection Sys.Amends Should Be Issued After Completion of Fall 1985 Refueling Outage
ML20134C145
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/08/1985
From: Leblond P
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20134C149 List:
References
0462K, 462K, NUDOCS 8508160222
Download: ML20134C145 (2)


Text

._ ,-

, N Commonwealth Edison

. > 7

, , ) one First N:tional Plaza. Chicago, lilinois

( O } Address Reply to: Post Ofhce Box 767 j Chicago;lihnois 60690 August 8, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Zion Nuclear Power Station Units 1 and 2 Proposed Amendment to Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304 References (a): June 3, 1977 letter from A. Schwencer' to R. L. Bolger (b): June 24, 1982 letter from S. A. Varga to L. O. DelGeorge

Dear Mr. Denton:

Attachment 1 to this letter is a proposed amendment to Facility Operating License Nos. DPR-39 and DPR-48, Appendix A, Sections 3.4 and 3.15.

These changes reflect the installation of a degraded grid voltage protection system at Zion Station.

The design requirements for this system were transmitted to Commonwealth Edison Company in reference (a). Reference (b) approved the

-proposed modifications and draft Technical Specifications. Attachment 2 provides a general description of Zion's degraded grid protection system. 1 Attachment 3 contains a demonstration that the proposed amendment does not involve a significant hazards consideration. This change has received on-site and off-site review and approval.

Reference (b) also requested that the Technical Specification change request be submitted subsequent to the installation of the degraded grid protection system. Installation is complete on Unit 1. However, final installation and testing on Unit 2 will be completed during the Fall, 1985 refueling outage. This outage is scheduled for completion in January of

.1986. Thus, the issuance of this amendment should be delayed until after the end of the refueling outage to ensure that installation is complete and to preclude any. potential conflicts between Unit 2 startup and the newly issued requirements.

esos16onaa esosos of PDR e

ADOCK 05000295 eDR - {up

1 l

, H. R. Denton August 8, 1985 l

l 10 CFR 170 requires a $150.00 fee to be submitted with this request.

However, Zion Station currently has a $150.00 credit due to a consolidation of amendment requests. Please apply this credit toward the required fee for this submittal.

As required by 10 CFR 50.91, the State of Illinois is being notified of this amendment request by transmittal of a copy of this letter and its attacnments.

If there are any further questions regarding this matter, please contact this office.

Three signed original and thirty-seven (37) copies of this letter and its attachments are hereby provided for your review.

Very truly yours, h

P. C. LeBlond Nuclear Licensing Administrator 1m Attachments cc: NRC Resident Inspector - Zion J. Norris - NRR M. C. Parker - State of Ill.