C..
i
.
t
AUG 121985
Docket No. 50-456
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
-Post.0ffice Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
D. L. Williams and A. Dunlop, Jr. , of this office on May 20 through
July 11, 1985, of activities at Braidwood Nuclear Power Station, Unit 1,
authorized by NRC Construction Permit No. CPPR-132 and to the discussion
of our findings with Mr. C. J. Tomashek at-the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
-the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in
violation of NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In ac.ordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
The' responses directed by this letter and the accompanying Notice (Order)
are not subject to the clearance procedures of the Office of Management
"
and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
c,
8508160056 850812ADOCM 05000456
PDR
G
\\
4 60/
r!
.
.
Commonwealth Edison Company
2
AUG 121985
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original Signed by~J. J.~lfarrison~
J. J. Harrison, Chief
Engineering Branch
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No.-50-456/85026(DRS)
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
J. F. Gudac, Station Superintendent
C. W. Schroeder, Licensing and
Compliance Superintendent
DMB/ Document Control Desk-(RIDS)
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D' W. Cassel, Jr., Esq.
.
^J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
,
Division
E. Chan, ELD
i
J. Stevens, NRR
5-
W,
%f
Wh!h
Rg g
R
RIII
RIII
RIII
'
%
lliams/jp
DunTop
Ri g
Farber
Har i o p
08/01/85
I 83
O
..'
'
-
.
.,,m
,,
,
_
,
-._____ _
y
7.
.
.
. _ _ _ . . ,
_ _ _
_
,