Forwards Safety Insp Rept 50-456/85-26 on 850520-0711 & Notice of Violation
ML20134B740
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 08/12/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20134B744 List:
References
NUDOCS 8508160056
Download: ML20134B740 (11)


See also: IR 05000456/1985026

Text

C..

i

.

t

AUG 121985

Docket No. 50-456

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

-Post.0ffice Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

D. L. Williams and A. Dunlop, Jr. , of this office on May 20 through

July 11, 1985, of activities at Braidwood Nuclear Power Station, Unit 1,

authorized by NRC Construction Permit No. CPPR-132 and to the discussion

of our findings with Mr. C. J. Tomashek at-the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

-the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in

violation of NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In ac.ordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

The' responses directed by this letter and the accompanying Notice (Order)

are not subject to the clearance procedures of the Office of Management "

and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

c,

8508160056

PDR 850812ADOCM

PDR 05000456

G

\

4 60/

r! .

.

Commonwealth Edison Company 2

AUG 121985

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by~J. J.~lfarrison~

J. J. Harrison, Chief

Engineering Branch

Enclosures:

1. Appendix, Notice

of Violation

2. Inspection Report

No.-50-456/85026(DRS)

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

J. F. Gudac, Station Superintendent

C. W. Schroeder, Licensing and

Compliance Superintendent

DMB/ Document Control Desk-(RIDS)

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D' W. Cassel, Jr., Esq.

.

^J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance ,

Division  ;

E. Chan, ELD i

J. Stevens, NRR

5-

R

W,

RIII'

%f

RIII RIII

Wh!h Rg

%

g

lliams/jp DunTop Ri g Farber Har i o p

08/01/85 I 83 i

O -

1

..' '

.

.,,m

,, , _ , -._____ _ y 7._ . . . _ _ _ . . , _ _ _ _

,